Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217L0421999-10-21021 October 1999 Forwards Insp Rept 50-382/99-20 on 990815-0925 & Notice of Violation.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20217N2111999-10-19019 October 1999 Forwards Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Licensed Operator Requalification Program, Effective,Utilized Systems Approach to Training & Showed Continued Improvements Over Previous Insp Findings ML20217L0101999-10-18018 October 1999 Provides Update of Waterford 3 Effort for Review of Ufsar. Info Listed Includes Background Mgt Expectations,Review Status & Results,Clarifications Re Review & Conclusions ML20217L0141999-10-18018 October 1999 Submits Update to NRC Staff Re Circumstances & Plans for Submitting Certification Rept on Waterford 3 Plant Specific Simulator ML20217G7051999-10-14014 October 1999 Forwards Comments on Four of NRC RO Examination Questions for Exam Administered During Week of 991004 05000382/LER-1999-014, Forwards LER 99-014-00,providing Details of Reactor Shutdown Due to Loss of RCP Controlled bleed-off Flow.Attached Commitment Identification/Voluntary Enhancement Form Identifies All Commitments Contained in Submittal1999-10-12012 October 1999 Forwards LER 99-014-00,providing Details of Reactor Shutdown Due to Loss of RCP Controlled bleed-off Flow.Attached Commitment Identification/Voluntary Enhancement Form Identifies All Commitments Contained in Submittal ML20217D5151999-10-0707 October 1999 Forwards Application for Renewal of SRO License for C Fugate License SOP-43039-3,IAW 10CFR55.57.Without Encls ML20217C6251999-10-0505 October 1999 Informs That NRC Reviewed Util Ltr & Encl Exercise Scenario Package for Waterford 3 Emergency Plan Exercise Scheduled for 991013.Based on Review,Nrc Determined That Exercise Appropriate to Meet Objectives ML20212J6921999-09-29029 September 1999 Forwards Insp Rept 50-382/99-18 on 990830-0902.One Noncited Violation Identified Re Failure to Follow Procedural Instructions to Ensure That Members on Fire Brigade Shift Were Qualified ML20216G2441999-09-27027 September 1999 Forwards Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted 05000382/LER-1999-013, Forwards LER 99-013-00,providing Details of Exceeding TS Limits for RCS Cooldown Rates.All Commitments Contained in Submittal Are Identified on Encl Commitment Identification/ Voluntary Enhancement Form1999-09-23023 September 1999 Forwards LER 99-013-00,providing Details of Exceeding TS Limits for RCS Cooldown Rates.All Commitments Contained in Submittal Are Identified on Encl Commitment Identification/ Voluntary Enhancement Form IR 05000382/19993011999-09-21021 September 1999 Informs That NRC License Exam Previously Associated with NRC Insp Rept 50-382/99-301 Will Be Incorporated Into NRC Insp Rept 50-382/99-14 ML20212D8761999-09-16016 September 1999 Informs That on 990818,NRC Staff Completed Midcycle PPR of Waterford 3.During Assessment Period,Number of Personnel Errors Occurred,Which Demonstrated Lack of Attention to Detail by Plant Personnel.Historical Listing of Issues,Encl ML20212C2471999-09-16016 September 1999 Forwards Five Final Applications for RO Licenses for G Esquival,Jm Hearn,Md Lawson,Re Simpson & PI Wood.Written Exam & Operating Test to Be Administered,Is Requested. Encls Withheld ML20212C2391999-09-16016 September 1999 Requests Cancellation of SRO Licenses for Bn Coble,License SOP-43835,due to Job Assignment Location & CA Rodgers, License SOP-43537-1,due to Resignation from Company, Effective 990901 ML20212C5881999-09-14014 September 1999 Forwards Insp Rept 50-382/99-15 on 990719-23 with Continuing in Ofc Insp Until 0819.No Violations Noted ML20211Q4421999-09-0909 September 1999 Forwards Insp Rept 50-382/99-07 on 990601-11.Three Violations Being Treated as Noncited Violations ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) ML20211M8391999-09-0303 September 1999 Forwards Revised Epips,Including Rev 25 to EP-001-020,rev 24 to EP-001-030,rev 25 to EP-001-040,rev 30 to EP-002-100,rev 22 to EP-001-010,rev 27 to EP-002-010,rev 26 to EP-002-102 & Rev 16 to EP-002-190.Listed Proprietary Revs to Epips,Encl ML20211L3681999-09-0202 September 1999 Forwards Five Preliminary Applications for Reactor Operator Licenses for Individuals Listed,Iaw 10CFR55.31.Encls Withheld ML20211K9741999-09-0101 September 1999 Forwards Insp Rept 50-382/99-16 on 990704-0814.Two Severity Level IV Violations Identified & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy 05000382/LER-1999-011, Forwards LER 99-011-00,providing Details of Reactor Shutdown Due to Loss of Controlled bleed-off Flow.All Commitments Contained in Submittal Identified on Attached Commitment Identification/Voluntary Enhancement Form1999-08-31031 August 1999 Forwards LER 99-011-00,providing Details of Reactor Shutdown Due to Loss of Controlled bleed-off Flow.All Commitments Contained in Submittal Identified on Attached Commitment Identification/Voluntary Enhancement Form ML20211M3641999-08-30030 August 1999 Forwards Written Examination,Operating Tests & Supporting Ref Matl Identified in Attachment 2 of ES-210,in Response to NRC .Encl Withheld ML20211G5751999-08-27027 August 1999 Forwards RAI Re IPEEE Submittal.Please Provide RAI within 60 Days of Receipt of Ltr,Per Util Response to GL 88-20,suppl 4 ML20211E3281999-08-26026 August 1999 Forwards fitness-for-duty Performance Data for Period of 990101-0630,IAW 10CFR26.71(d).Ltr Does Not Contain Commitments 05000382/LER-1999-009, Forwards LER 99-009-00 Re Discovery of Condition of Noncompliance with App R Involving Inadequate Separation of Essential Cables Routed in Fire Area RAB-30 in Rab. Compensatory Measures Were Established Immediately1999-08-26026 August 1999 Forwards LER 99-009-00 Re Discovery of Condition of Noncompliance with App R Involving Inadequate Separation of Essential Cables Routed in Fire Area RAB-30 in Rab. Compensatory Measures Were Established Immediately 05000382/LER-1999-010, Forwards LER 99-010-00,providing Details of Inadequate Pumping Capacity in Dry Cooling Tower Area.All Commitments Contained in Submittal Are Identified on Attached Commitment Identification Voluntary Enhancement Form1999-08-26026 August 1999 Forwards LER 99-010-00,providing Details of Inadequate Pumping Capacity in Dry Cooling Tower Area.All Commitments Contained in Submittal Are Identified on Attached Commitment Identification Voluntary Enhancement Form ML20211F5421999-08-24024 August 1999 Forwards Proposed marked-up TS Page Xviii, Index Administrative Controls, Correcting Page Number Re TS Change Request NPF-38-220.Editorial Changes for TS Change NPF-38-221 Discussed ML20211F3561999-08-24024 August 1999 Forwards CTS Pages & TS Proposed marked-up Pages for Insertion Into TS Change Request NPF-38-207 Re Efas, Originally Submitted on 980702.Original NSHC Determination Continues to Be Applicable ML20211F4611999-08-24024 August 1999 Informs That NRC Reviewed Ltr & Encl Objectives for Waterford 3 Emergency Plan Exercise Scheduled for 991013.Exercise Objectives Appropriate to Meet Emergency Plan Requirements ML20211G1731999-08-23023 August 1999 Informs That Info Submitted in ,B&W Rept 51-1234900-00,will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20210T9791999-08-18018 August 1999 Discusses Which Responded to Reconsideration of Violation Denial (EA 98-022) Enforcement Action Detailed in .Concludes That Violation Occurred as Stated ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S0561999-08-12012 August 1999 Submits Voluntary Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for NRC Fys 2000 & 2001 for Waterford 3 ML20210Q6161999-08-12012 August 1999 Forwards Corrected Copy of Monthly Operating Rept for July 1999 for Waterford 3.Original Rept,Submitted with ,Contained Typos ML20217F2661999-08-12012 August 1999 Forwards Copy of 1999 Waterford 3 Biennial Exercise Package to Be Performed Using Waterford 3 CR Simulator ML20210R9231999-08-11011 August 1999 Forwards Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Nrc Has Determined That One Severity Level IV Violation of NRC Requirements Occurred ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams 05000382/LER-1999-008, Forwards LER 99-008-00,re Failure to Perform Testing of ESF Filtration Units Per TS Srs.Commitments Made by Util Also Encl1999-07-29029 July 1999 Forwards LER 99-008-00,re Failure to Perform Testing of ESF Filtration Units Per TS Srs.Commitments Made by Util Also Encl ML20210H4291999-07-29029 July 1999 Forwards Response to NRC Rai,Associated with TS Change Request NPF-38-208,proposing to Replace Ref to Supplement 1 with Ref to Supplement 2 of Calculative Methods for CE Small Break LOCA Evaluation Model, in ACs Section of TSs ML20210F9451999-07-27027 July 1999 Forwards Proprietary & non-proprietary Version of Rev 29 to EPIP EP-002-100, Technical Support Ctr Activation,Operation & Deactivation. Proprietary Info Withheld,Per 10CFR2.790 ML20210D3171999-07-23023 July 1999 Submits Proposal for Final Resolution of Reracking Spent Fuel Pool at Plant,Per License Amend 144,issued by NRC in .No New Commitments Are Contained in Ltr 05000382/LER-1999-007, Forwards LER 99-007-00,providing Details of Operation Outside Tornado Missile Protection Licensing Basis for turbine-driven Emergency Feedwater Pump Exhaust Stack & Steam Supply Piping.All Commitments Identified on Attached1999-07-23023 July 1999 Forwards LER 99-007-00,providing Details of Operation Outside Tornado Missile Protection Licensing Basis for turbine-driven Emergency Feedwater Pump Exhaust Stack & Steam Supply Piping.All Commitments Identified on Attached ML20210D8701999-07-23023 July 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Plan Requests for Relief ISI-018 Through ISI-020 for Entergy Operations,Inc,Unit 3 ML20210B1521999-07-15015 July 1999 Forwards Insp Rept 50-382/99-13 on 990523-0703.Three Violations Being Treated as Noncited Violations ML20209G9771999-07-13013 July 1999 Forwards Objectives & Guidelines for Waterford 3 Emergency Preparedness Exercise Scheduled for 991013.List of Objectives cross-referenced Where Applicable to Relevant Sections of NUREG-0654 IR 05000382/19990081999-07-12012 July 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/99-08 Issued on 990503 ML20209E5231999-07-0909 July 1999 Informs That as Result of NRC Review of Util Responses to GL-92-01,rev 1 & Suppl 1,staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2.This Closes Staff Efforts Re TAC MA0583 ML20209D4051999-07-0707 July 1999 Forwards Revised TS Pages to Replace Attachment C,Entirely in Original TS Change Request NPF-38-207,per 990519 Discussion with C Patel of Nrc.Changes to Action 20 Delete Word Requirement & Revise Word Modes to Mode 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217L0101999-10-18018 October 1999 Provides Update of Waterford 3 Effort for Review of Ufsar. Info Listed Includes Background Mgt Expectations,Review Status & Results,Clarifications Re Review & Conclusions ML20217L0141999-10-18018 October 1999 Submits Update to NRC Staff Re Circumstances & Plans for Submitting Certification Rept on Waterford 3 Plant Specific Simulator ML20217G7051999-10-14014 October 1999 Forwards Comments on Four of NRC RO Examination Questions for Exam Administered During Week of 991004 05000382/LER-1999-014, Forwards LER 99-014-00,providing Details of Reactor Shutdown Due to Loss of RCP Controlled bleed-off Flow.Attached Commitment Identification/Voluntary Enhancement Form Identifies All Commitments Contained in Submittal1999-10-12012 October 1999 Forwards LER 99-014-00,providing Details of Reactor Shutdown Due to Loss of RCP Controlled bleed-off Flow.Attached Commitment Identification/Voluntary Enhancement Form Identifies All Commitments Contained in Submittal ML20217D5151999-10-0707 October 1999 Forwards Application for Renewal of SRO License for C Fugate License SOP-43039-3,IAW 10CFR55.57.Without Encls 05000382/LER-1999-013, Forwards LER 99-013-00,providing Details of Exceeding TS Limits for RCS Cooldown Rates.All Commitments Contained in Submittal Are Identified on Encl Commitment Identification/ Voluntary Enhancement Form1999-09-23023 September 1999 Forwards LER 99-013-00,providing Details of Exceeding TS Limits for RCS Cooldown Rates.All Commitments Contained in Submittal Are Identified on Encl Commitment Identification/ Voluntary Enhancement Form ML20212C2391999-09-16016 September 1999 Requests Cancellation of SRO Licenses for Bn Coble,License SOP-43835,due to Job Assignment Location & CA Rodgers, License SOP-43537-1,due to Resignation from Company, Effective 990901 ML20212C2471999-09-16016 September 1999 Forwards Five Final Applications for RO Licenses for G Esquival,Jm Hearn,Md Lawson,Re Simpson & PI Wood.Written Exam & Operating Test to Be Administered,Is Requested. Encls Withheld ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) ML20211M8391999-09-0303 September 1999 Forwards Revised Epips,Including Rev 25 to EP-001-020,rev 24 to EP-001-030,rev 25 to EP-001-040,rev 30 to EP-002-100,rev 22 to EP-001-010,rev 27 to EP-002-010,rev 26 to EP-002-102 & Rev 16 to EP-002-190.Listed Proprietary Revs to Epips,Encl ML20211L3681999-09-0202 September 1999 Forwards Five Preliminary Applications for Reactor Operator Licenses for Individuals Listed,Iaw 10CFR55.31.Encls Withheld 05000382/LER-1999-011, Forwards LER 99-011-00,providing Details of Reactor Shutdown Due to Loss of Controlled bleed-off Flow.All Commitments Contained in Submittal Identified on Attached Commitment Identification/Voluntary Enhancement Form1999-08-31031 August 1999 Forwards LER 99-011-00,providing Details of Reactor Shutdown Due to Loss of Controlled bleed-off Flow.All Commitments Contained in Submittal Identified on Attached Commitment Identification/Voluntary Enhancement Form ML20211M3641999-08-30030 August 1999 Forwards Written Examination,Operating Tests & Supporting Ref Matl Identified in Attachment 2 of ES-210,in Response to NRC .Encl Withheld ML20211E3281999-08-26026 August 1999 Forwards fitness-for-duty Performance Data for Period of 990101-0630,IAW 10CFR26.71(d).Ltr Does Not Contain Commitments 05000382/LER-1999-010, Forwards LER 99-010-00,providing Details of Inadequate Pumping Capacity in Dry Cooling Tower Area.All Commitments Contained in Submittal Are Identified on Attached Commitment Identification Voluntary Enhancement Form1999-08-26026 August 1999 Forwards LER 99-010-00,providing Details of Inadequate Pumping Capacity in Dry Cooling Tower Area.All Commitments Contained in Submittal Are Identified on Attached Commitment Identification Voluntary Enhancement Form 05000382/LER-1999-009, Forwards LER 99-009-00 Re Discovery of Condition of Noncompliance with App R Involving Inadequate Separation of Essential Cables Routed in Fire Area RAB-30 in Rab. Compensatory Measures Were Established Immediately1999-08-26026 August 1999 Forwards LER 99-009-00 Re Discovery of Condition of Noncompliance with App R Involving Inadequate Separation of Essential Cables Routed in Fire Area RAB-30 in Rab. Compensatory Measures Were Established Immediately ML20211F3561999-08-24024 August 1999 Forwards CTS Pages & TS Proposed marked-up Pages for Insertion Into TS Change Request NPF-38-207 Re Efas, Originally Submitted on 980702.Original NSHC Determination Continues to Be Applicable ML20211F5421999-08-24024 August 1999 Forwards Proposed marked-up TS Page Xviii, Index Administrative Controls, Correcting Page Number Re TS Change Request NPF-38-220.Editorial Changes for TS Change NPF-38-221 Discussed ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20210Q6161999-08-12012 August 1999 Forwards Corrected Copy of Monthly Operating Rept for July 1999 for Waterford 3.Original Rept,Submitted with ,Contained Typos ML20210S0561999-08-12012 August 1999 Submits Voluntary Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for NRC Fys 2000 & 2001 for Waterford 3 ML20217F2661999-08-12012 August 1999 Forwards Copy of 1999 Waterford 3 Biennial Exercise Package to Be Performed Using Waterford 3 CR Simulator 05000382/LER-1999-008, Forwards LER 99-008-00,re Failure to Perform Testing of ESF Filtration Units Per TS Srs.Commitments Made by Util Also Encl1999-07-29029 July 1999 Forwards LER 99-008-00,re Failure to Perform Testing of ESF Filtration Units Per TS Srs.Commitments Made by Util Also Encl ML20210H4291999-07-29029 July 1999 Forwards Response to NRC Rai,Associated with TS Change Request NPF-38-208,proposing to Replace Ref to Supplement 1 with Ref to Supplement 2 of Calculative Methods for CE Small Break LOCA Evaluation Model, in ACs Section of TSs ML20210F9451999-07-27027 July 1999 Forwards Proprietary & non-proprietary Version of Rev 29 to EPIP EP-002-100, Technical Support Ctr Activation,Operation & Deactivation. Proprietary Info Withheld,Per 10CFR2.790 ML20210D3171999-07-23023 July 1999 Submits Proposal for Final Resolution of Reracking Spent Fuel Pool at Plant,Per License Amend 144,issued by NRC in .No New Commitments Are Contained in Ltr 05000382/LER-1999-007, Forwards LER 99-007-00,providing Details of Operation Outside Tornado Missile Protection Licensing Basis for turbine-driven Emergency Feedwater Pump Exhaust Stack & Steam Supply Piping.All Commitments Identified on Attached1999-07-23023 July 1999 Forwards LER 99-007-00,providing Details of Operation Outside Tornado Missile Protection Licensing Basis for turbine-driven Emergency Feedwater Pump Exhaust Stack & Steam Supply Piping.All Commitments Identified on Attached ML20209G9771999-07-13013 July 1999 Forwards Objectives & Guidelines for Waterford 3 Emergency Preparedness Exercise Scheduled for 991013.List of Objectives cross-referenced Where Applicable to Relevant Sections of NUREG-0654 ML20209D4051999-07-0707 July 1999 Forwards Revised TS Pages to Replace Attachment C,Entirely in Original TS Change Request NPF-38-207,per 990519 Discussion with C Patel of Nrc.Changes to Action 20 Delete Word Requirement & Revise Word Modes to Mode ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl 05000382/LER-1999-005, Forwards LER 99-005-00,providing Details of Discovery of Untested Electrical Contacts in safety-related Logic Circuits1999-06-24024 June 1999 Forwards LER 99-005-00,providing Details of Discovery of Untested Electrical Contacts in safety-related Logic Circuits ML20196G5731999-06-24024 June 1999 Forwards Operator Licensing Exam Outlines Associated with Exam Scheduled for Wk of 991004.Exam Development Is Being Performed in Accordance with NUREG-1021,Rev 8 ML20212J4121999-06-23023 June 1999 Responds to NRC Re Reconsideration of EA 98-022. Details Provided on Actions Util Has Taken or Plans to Take to Address NRC Concerns with Ability to Demonstrate Adequate Flow Availability to Meet Design Requirements ML20196E9371999-06-22022 June 1999 Forwards Revs Made to EP Training Procedures.Procedures NTC-217 & NTC-217 Have Been Deleted.Procedure NTP-203 Was Revised to Combine Requirement Previously Included in Procedures NRC-216 & NTC-217 ML20196A1021999-06-17017 June 1999 Provides Supplemental Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Per 990513 Request of NRC Project Manager ML20195F3671999-06-0909 June 1999 Forwards Rev 21,Change 0 to EP-001-010, Unusual Event. Rev Reviewed in Accordance with 10CFR50.54(q) Requirements & Determined Not to Decrease Effectiveness of Emergency Plan ML20195C7801999-06-0303 June 1999 Submits Response to Violations Noted in Insp Rept 50-382/99-08.Corrective Actions:All Licensee Access Authorization Personnel Were Retrained Prior to Completion of Insp ML20195C2951999-05-28028 May 1999 Forwards Annual Evaluation of Changes & Errors Identified in Abb CE ECCS Performance Evaluation Models Used for LOCA Analyses.Results of Annual Evaluation for CY98 Detailed in Attached Rept,Based Upon Suppl 10 to Abb CE Rept ML20195C0241999-05-28028 May 1999 Notifies NRC of Operator Medical Condition for Waterford 3 Opertaor Sp Wolfe,License SOP-43723.Attached NRC Form & Memo Contain Info Concerning Condition.Without Encls ML20196L3281999-05-24024 May 1999 Informs That Entergy Is Withdrawing TS Change Request NPF-38-205 Re TS 3.3.3.7.1, Chlorine Detection Sys & TS 3.3.3.7.3, Broad Range Gas Detection Submitted on 980629 ML20206S4691999-05-17017 May 1999 Requests Waiver of Exam for SRO Licenses for an Vest & Hj Lewis,Iaw 10CFR55.47.Both Individuals Have Held Licenses at Plant within Past Two Year Period,But Licenses Expired Upon Leaving Util Employment.Encl Withheld 05000382/LER-1999-004, Forwards LER 99-004-00 Re Discovery That Response Time Testing Had Not Been Performed for ESFAS Containment Cooling Function,As Required by TS SR 4.3.2.31999-05-14014 May 1999 Forwards LER 99-004-00 Re Discovery That Response Time Testing Had Not Been Performed for ESFAS Containment Cooling Function,As Required by TS SR 4.3.2.3 ML20206N1921999-05-10010 May 1999 Provides Revised Attachment 2 for Alternative Request IWE-02,originally Submitted 990429 Re Bolt Torque or Tension Testing of Class Mc pressure-retaining Bolting as Specified in Item 8.20 of Article IWE-2500,Table IWE-2500-1 ML20206J1471999-05-0606 May 1999 Requests That Implementation Date for TS Change Request NPF-38-211 Be within 90 Days of Approval to Allow for Installation of New Monitoring Sys for Broad Range Gas Detection Sys ML20206J1721999-05-0606 May 1999 Notifies That Proposed Schedule for Plant 1999 Annual Exercise Is Wk of 991013.Exercise Objective Meeting Scheduled for 990513 at St John Baptist Parish Emergency Operations Ctr ML20206G8021999-05-0404 May 1999 Provides Revised Response to NRC Re Violations Noted in Insp Rept 50-382/99-01.Licensee Denies Violation as Stated.Change Made Is Denoted by Rev Bar & Does Not Materially Impact Original Ltr ML20206E7811999-04-29029 April 1999 Proposes Alternatives to Requirements of ASME B&PV Code Section XI,1992 Edition,1992 Addenda,As Listed.Approval of Alternative Request on or Before 990915,requested ML20205T2531999-04-22022 April 1999 Forwards LER 99-S02-00,describing Occurrence of Contract Employee Inappropriately Being Granted Unescorted Access to Plant Protected Area ML20205R2611999-04-20020 April 1999 Forwards Rev 19 to Physical Security Plan,Submitted in Accordance with 10CFR50.54(p).Plan Rev Was Approved & Implemented on 990407.Rev Withheld,Per 10CFR73.21 ML20205Q3241999-04-16016 April 1999 Submits Addl Info Re TS Change Request NPF-38-215 for Administrative Controls TS Changes.Appropriate Pages from New Entergy Common QA Program Manual Provided as Attachment to Ltr 1999-09-07
[Table view] Category:PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC
MONTHYEARML20153F6111988-01-21021 January 1988 FOIA Request for Documents Re Reported Leak from Commissioner T Roberts Ofc Concerning QA Problems at Facility ML20235J1851987-05-0101 May 1987 FOIA Request for Status Rept & Documents Re Ofc of Investigation Investigations Involving Plant ML20209G9751987-04-24024 April 1987 FOIA Request for Commissioner Tm Roberts Memo Sent to Util Re Flaws at Plant ML20238B4981986-12-12012 December 1986 FOIA Request for Ofc of Inspector & Auditor Rept on Region Iv.Author Currently Studying Facility ML20210U8441986-03-21021 March 1986 FOIA Request for All Completed Ofc of Investigations Repts. Re Facility ML20134L4791985-07-17017 July 1985 FOIA Request for Biographical Data on Region III Resident Inspector,H Livermore & SALPs for Listed Plants for Specified Time Frames ML20133F8991985-05-0101 May 1985 Appeals Denial of FOIA Request for List of All Ofc of Investigation Reviews & Repts of Investigations of Facility ML20116E8101985-04-26026 April 1985 Notifies That on 840418,util Filed Suppl to Response to ALAB-801 Which Included Two Large Repts.Joint Intervenors Believe Filing Unauthorized & Request Addl 2 Wks to Respond to Repts If Considered by Aslab ML20126D9131985-03-18018 March 1985 FOIA Request for List of All Ofc of Investigations Reviews, Repts or Investigations Re Facility ML20133K1961985-03-18018 March 1985 FOIA Request for Documents Re NRC 850315 Meeting Concerning Facility ML20126D9831985-03-18018 March 1985 FOIA Request for Documentation Generated by Ofc of Investigations Re Investigations or Reviews Concerning Facility ML20111C4671985-03-11011 March 1985 Provides Corrected Paragraph to Replace Jumbled Paragraph in Re Joint Intervenors 841107 Motion to Reopen ML20111B1211985-03-0808 March 1985 Discusses Extension of Time Until 850315 for Commission to Review ALAB-797 Re Joint Intervenors 841107 Motion to Reopen Hearings on QA Contentions.If Aslab Has Not Jurisdiction, Identical Motion Will Be Filed W/Commission ML20133B9001985-03-0101 March 1985 FOIA Request for Documents Re J Wells ML20127F7821985-02-19019 February 1985 FOIA Request for Three Categories of Documents Re Decision to Grant Low Power License to Facility ML20140G4681984-08-29029 August 1984 FOIA Request for All Documents Re Ofc of Investigations Investigation Concerning Falsification of Records & Harassment of Qa/Qc Personnel at Waterford Site ML20106C2411984-08-29029 August 1984 FOIA Request for Documents Re Ofc of Inspector & Auditor Investigation or Rept Re Facility ML20107J1201984-08-29029 August 1984 FOIA Request for Documents Between NRC & Util Re Ofc of Investigation Investigation of Activities at Facility ML20096A4131984-08-29029 August 1984 Requests Commission Act Immediately in Oversight of Ofc of Investigations,To Ensure No Further Disclosure of Info About Targets & Substance of Investigation to Util.Svc List Encl ML20107A6441984-08-16016 August 1984 FOIA Request for All Info,Comments &/Or Reviews Re Integrated Program Developed to Outline near-term OL Workload,Per EDO 840625 Memo to Chairman Palladino ML20132F2021984-08-0606 August 1984 Responds to Refusing to Process FOIA 84-206 Due to Lack of Specificity.Records Requested Documenting Problems W/Subcontractors Work & Corrective Actions Taken ML20137U3941984-07-25025 July 1984 Urges NRC to Reject Util 840628 Proposed Plan to Correct Problems Found by NRC Special Review Team.Independent Third Party to Conduct Review of Problems Outlined in NRC & Development of Plan to Resolve Issues Requested ML20126D2711984-07-20020 July 1984 Appeals Denial of FOIA Request for Documents Re Const Assessment Team Insp of Facility ML20128L7001984-07-20020 July 1984 Appeals Lack of Response to FOIA Request for Documents Re Util Jan 1984 Memo Discussing Worker Concerns at Facility ML20126L5781984-07-20020 July 1984 Appeals Denial of FOIA Request for Documents Re 840608 Public Meeting in Bethesda,Md Re Facility ML20090H7851984-07-13013 July 1984 Requests Extension of Deadline for Responding to Util to NRC on Behalf of Citizens for Safe Energy ML20128G3621984-07-0606 July 1984 Appeals Lack of Response to FOIA Request for Info Re Basemat Cracking,Water Leakage & Seepage Problems ML20126L5711984-06-15015 June 1984 FOIA Request for NRC Records on 840608 Public Meeting in Bethesda,Md Re Facility ML20125C1711984-06-15015 June 1984 FOIA Request for Records Relevant to &/Or Generated in Connection W/Jan 1984 Memo Issued by Louisiana Power & Light Co Concerning Interviews,Surveys & Exit Interviews to Document Worker Concerns ML20127F2631984-06-15015 June 1984 FOIA Request for Records & Info,Including But Not Limited to Notes,Ltrs,Memos & Minutes Re NRC Preceding Sser, Concerning Problems at Plant ML20112J5071984-06-13013 June 1984 FOIA Request for All Records from State of La Congressional Delegation on Waterford 3 ML20114A6681984-05-31031 May 1984 FOIA Request for All Documentation Re Formation of Waterford 3 & Comanche Peak Task Forces ML20114A4321984-05-31031 May 1984 FOIA Request for Documents Re Review of Util Proposed Fuel Loading ML20105D2861984-05-31031 May 1984 FOIA Request for All Agency Records Relevant to &/Or Generated in Connection W/All Draft Ssers for Facility, Including All Proposals Made by Team Members for Inclusion in Rept ML20107H3871984-05-31031 May 1984 FOIA Request for All Records Relevant to or Generated in Connection W/Any Rept or Study of Basemat Cracking & Water Leakage & Seepage Problems at Facility Conducted or Issued Subsequent to Formation of Special Investigation Team ML20126D3461984-05-23023 May 1984 FOIA Request for All Documentation Re Creation & Issuance of Sser,Including All Submittals by Members of Special Insp Team & Input from Oeld & IE ML20127C2221984-05-14014 May 1984 Discusses Availability of Info on Shear That Is Applicable to Facility Basemat.No Excuse Found for Departing Radically from Code Provisions,But Advantage Should Be Taken of Provisions in Code Allowing Increase in Shear Strength ML20105C4521984-04-17017 April 1984 FOIA Request for Transcript of 840326 Meeting in Bethesda,Md Re Basemat Adequacy at Facility & All Related Memos,Working Papers & Correspondence from 840325 to Present ML20127E0521984-04-17017 April 1984 FOIA Request for All Documentation Requested & Produced by Ofc of Investigation in Review of QA at Facility ML20084R6591984-03-26026 March 1984 FOIA Request for Records Relevant to or Generated in Connection W/Meetings or Conversations Between D Eisenhut & Utils in Feb or Mar 1984 ML20105C5571984-03-21021 March 1984 FOIA Request for All Documents Connected W/Const Assessment Team Insp That Began in Feb 1984 ML20112E2921984-03-21021 March 1984 FOIA Request for All Records Re NRC Monitoring & Oversight of Eight Specified Contractors & All Records Re Problems, Deficiencies or Flaws Found in Specified Firms ML20084S0641984-03-21021 March 1984 FOIA Request for Records Generated in Connection w/840201 Meeting Between NRC & Util Re Facility ML20087A5281984-02-29029 February 1984 Requests G Hill 840110-11 Statement Re QA Deficiencies Be Forwarded to G Groesch & Author ML20086N9621983-10-24024 October 1983 FOIA Request for Documents Re 830714 Inquiry Team Rept on Facility QA Allegations & Insp & Util Response to Rept ML20082R0761983-05-31031 May 1983 Forwards Documentation Re QA Problems at Facility.Discovery of Most Recent Cracks in Foundation Indicates Seriousness of Problem ML20076M0661983-05-0404 May 1983 FOIA Request for SALP Documents,Written or Routed Since 1979,which Mention or Refer to Facility & Describe or Provide Info on SALP Insp Findings or Conclusions Based on SALP Reviews ML20081M0011983-05-0404 May 1983 FOIA Request for Documents Re IE Insp Rept 50-382/82-14 & Initially Proposed Penalty to Be Levied Against Util ML20081B9851983-03-31031 March 1983 FOIA Request for Documents Re Const & Operation of C-E Plants.List of Info Required Submitted ML20083N0531983-01-26026 January 1983 Forwards El Duncan Affidavit Re Emergency Info Brochure, Inadvertently Omitted from Duplessis & Hunter Affidavits 1988-01-21
[Table view] |
Text
..
, COVC.hM'ENT ACCOUNTABILITY PROJECT .
Institute for Policy Studies 1901 Que Street. N.W.. Washington. D.C. 20009 (202)234-9382 July 6, 1984 Mr. William J. Direkc APPEAL OF INITIAL FOlA DECIS60N r EDO U.S. Nuclear Regulatory Commission g_f .gg g g Washington, D.C. 20555
[g sg 7 ., g j g
Dear Mr. Dircks:
This isan appeal pursuant to Subsection (a) (6) of the Freedom of Information Act (FOIA), as amended 5 U.S.C. 5552.
By letter dated May 31, 1984, the Government Accountability Project (GAP)' requested document.s relating to:
(1) Any report or study of the basemat cracking and water leakage and seepage problems at the Waterford III plant conducted and issued subsequent to the formation of the Special Investigation Team, including such a report or study prepared without the input of the t'eam by either contractors or other members of the staff.
These records pertain to the Waterford III Steam Electric Station. We defined the requect to include any and all agency records and information, including but not limited to notes, letters, files, memoranda, drafts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, interview reports, procedures, instructions, engineering analyses, drawings, graphs, charts, maps, photographs, agreements, handwritten notes, studies, data sheets, notebooks, bcoks, telephone messages, computations, voice recordings, any other data compilations, interim and/or final reports, status reports, generated or obtained by NP.C personnel in connection with investiga-tions, inspections and/or reports on the above matters.
To date, we have recieved no response to our request, although it has been well over a month since our initial request. We have construed your failure to answer as a constructive denial of the request.
As provided under the FOIA, we expect to receive a response to this administrative appeal within twenty (20) working days.
Yours truly,,
' ALL U , ic /c &
Billie Pirner Garde i 8505300134 850301 lM
~
=
! PDR FDIA GARDE 84-A-56 PDR v
. wep.
. GOVERNMENT ACCOUNTADILITY PROJECT Institute for Policy Studies 1901 Que Street. N.W., Woshington. D.C. 20009 (202)234 9382
- 1 Freedom of Information Act Request May 31, 1984 Director Office of Administration PREEDOM OF INFORMATION Nuclear Regulatory Commission ACT RE ES Washington, D.C. 20555 hM - y.Tyg3 To Wh'om It May Concern: h 9 k.Pf Y Pursuant to the Freedom of Information Act (FOI A), 5 U.S.C. 5552, the Government Accountability Project (GAP) of the Institute for Policy Studies requests copies of any and all agency records and information, including but not limited to notes, letters, memoranda, drafts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, interview reports, procedures, instructions, engineering antlyses, drawings, files, graphs, charts, maps, photographs, agreements, handwritten notes, studies, data sheets, notebooks, books, telephone nessages, computations, voice recordings, computer run-offs, any other data compilations, interim and/or final reports, status reports, and any and all other records relevant to and/or generated in connection with (1) Any report or study of the basemat cracking and water leakage and seepage problems at the Waterford III plant conducted and issued subsequent to the formation of the Special Investigation Team, including such a report or study prepared without the input of the team by either contractors or other members of the staff.
This request includes all agency records as defined in 10 C.F.R. 69.3a(b) and the NRC Manual, Appendix 0211 Parts 1.A.2 and A.3 (approved October 8,1980) whether they currently exist in the NRC official, " working," investigative or other files, or at any other location, including private residences.
If any records as defined in 10 C.F.R. 59.3a(b) and the NRC Manual, supra, and covered by this request have been destroyed and/or removed after this request, please provide all surr.ounding records, including but not limited to a list of all records which have been or are destroyed and/or removed, a description of the action (s) taken relevent to, generated in connection with, and/or issued. in order to implement the action (s).
GAP requests that fees be waived, because " finding the information can be considered as primarily benefitting the general public," 5 U.S.C. 5552(a)(4)(a). GAP is a non-profit, nonpartisan public interest organization concerned with honest and open government. Through public outreach, the Project promotes whistleblowers as agents 4542 %7{l W A PP'
' Director.
Office 'of Administration ef government accountability. Through its Citizens Clinic, GAP offers assistance to local public interest and citizens groups seeking to ensure the' health and safety of their communities. The Citizens Clinic is currently assisting several citizens groups, local governments and intervenors in the mid-Michigan area concerning the dronstruction of the Midland plant.
We are requesting the above infomation as part of an ongoing monitoring project on the adequacy of the NRC's efforts to protect public safety and health at nuclear p;wer plants. '
Fcr any documents or portions that you deny due to a specific FOIA exemption, please provide an index itemizing and describing the docaments or portions of documents withheld. The index should provide a detailed justification of your grounds for claiming each exemption, explaining why each exemption is relevant to the document or partion of the document withheld. This index is required under Vaughn v. Rosen (1),
484 F.2d 820 (D.C.Cir.1973), cert. denied, 415 U.S. 977 (1974).
We look forward to your response to this request within ten days.
APL M Billie Pirner Garde Citizens Clinic Director 4
9 5
t
.g w .
,1, .-
GOVERNMENT ACCOUNTABluTY PROJECT Institute for Pokcy Studies 1901 Que Street. N.W. Washington. D.C. 20009 (202)234 9382
- B Freedom of Information Act Request May 31, 1984 Director Office of Administration PftEEDOM OF INFORMATION Nuclear Regulatory Commission ACT R Washington, D.C. 20555 h M E UEST 9 455 To Whom It May Concern: h N (p@f Y Pursuant to the Freedom of Information Act (F0IA), 5 U.S.C. $552, the Government Accountability Project (GAP) of the Institute for Policy Studies requests copies of any and all agency records and information, including but not limited to notes, letters, memoranda, drafts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, interview reports, procedures, instructions, engineering analyses, drawings, files, graphs, charts, maps, photographs, agreements, handwritten notes, studies, data sheets, notebooks, books, telephone messages, computations, voice recordings, computer run-offs, any other data compilations, interim and/or final reports, status reports, and any and all other records relevant to and/or generated ~
in connection with (1) Any report or study of the basemat cracking and water leakage and seepage problems at the Waterford III plant conducted and issued subsequent to the formation of the Special Investigation Team, including such a report or study prepared without the input of the team by either contractors or other members of the staff.
l This request includes all agency records as defined in 10 C.F.R. 69.3a(b) and the l NRC Manual, Appendix 0211, Pcrts 1.A.2 and A.3 (approved October 8,1980) whether l they currently exist in the NRC official, " working," investigative or other files.
l or at any other location, including private residences.
If any records as defined in 10 C.F.R. $9.3a(b) and the NRC Manual, supra, and covered by this request have been destroyed and/or removed after this request, l please provide all surrounding records, including but not limited to a list of all l records which have been or are destroyed and/or removed, a description of the action (s) taken relevent to, generated in connection with, and/or issued in order to implement the action (s).
GAP requests that fees be waived, because " finding the information can be considered
- as primarily benefitting the general public " 5 U.S.C. $552(a)(4)(a). GAP is a non-profit, nonpartisan public interest organization concerned with honest and open gcVernment. Through public outreach, the Project promotes whistleblowers as agents W ?? Of'
J
'. - Director
/ Office of Administration :
of government accountability. Through its Citizens Clinic, GAP offers assistance to local public interest and citizens groups seeking to ensure the health and safety of their communities. The Citizens Clinic is currently assisting several citizens ;
groups, local governments and intervenors in the mid-Michigan area concerning the l construction of the Midland plant.
We are requesting the above infonnation as part of an ongoing monitoring project on the adequacy of the NRC's efforts to protect public safety and health at nuclear power plants.
For any documents or portions that you deny due to a specific FOIA exemption, please provide an index itemizing and describing the documents or portions of documents withheld. The index should provide a detailed justification of your grounds for claiming each exemption, explaining why each exemption is relevant to the document or portion of the document withheld. This index is required under Vaughn v. Rosen (I),
484 F.2d 820 (D.C.Cir.1973), cert. denied, 415 U.S. 977 (1974).
We look forward to your response to this request within ten days, kU!.
Billie Pirner Garc'e Citizens Clinic Director
- - - .