Forwards Insp Rept 50-346/96-07 on 960729-0827.No Violations Noted
ML20128G406
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/03/1996
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jeffery Wood
CENTERIOR ENERGY
Shared Package
ML20128G412 List:
References
NUDOCS 9610090025
Download: ML20128G406 (3)


See also: IR 05000346/1996007

Text

- _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ - - - _ - _ _ _ _ _ - _ _ - - - - - - - - - - - - - - - - - - - -

.

.

October 3, 1996

Mr. John K. Wood

Vice President - Nuclear

Davis-Besse Nuclear Power Station

Centerior Service Company

5501 North State - Route 2

Oak Harbor, OH 43449

SUBJECT:

NRC INSPECTION REPORT NO. 50-346/96007(DRS)

Dear Mr. Wood:

This refers to the inspection conducted by this office on July 29 through

August 27, 1996. This inspection included a review of activities authorized

e

for you Davis-Besse Nuclear Power Station. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed report.

The inspection included an assessment of the quality and effectiveness of

engineering and technical support. Areas examined during the inspection are

identified in the report.

Within these areas, the inspection consistei of a

selective examination of procedures and representative records, observations

of activities, and interviews with personnel.

Overall, we determined that engineering was well integrated into the day-to-

day activities of the plant.

Engineers were active in the resolution of

technical issues and generally proactive in the identification and resolution

of potentially generic industry concerns. One unresolved item was identified

in your performance of 10 CFR 50.59 licensing evaluations.

In accordance with 10 CFR 2.790 of the NRC's " Rules and Practice," a copy of

this letter and its enclosures will be placed in the NRC Public Document Room.

Sincerely,

original signed by G. E. Grant

Geoffrey G. Grant, Director

Division of Reactor Safety

Docket No. 50-346

Enclosure:

Inspection Report

No. 50-346/96007(DRS)

See Attached Distribution:

SEE PREVIOUS CONCURRENCE

DOCUMENT NAME:

G:\\DRS\\DAV96007.DRS

To receive a copy of this document. bdicate in the box "C" = Copy w/o attach /enci "E" = Copy w/ attach / encl "N" = No copy

0FFICE

DRS/DRP

l

Rill:DRP

l

RIII:DRS

l

RIII:DRS

l

NAME

taff/lc

Lanksbury

Ring

Clayton

t

DATE

9/ /96

9/ /96

9/ /96

/f/ 3 /96 l' /

k

0FFICIAL RECORD COPY

~

(

1610090025 961003

/"['p/

/

PDR

ADOCK 05000346

O

PDR

_

_ _ _

.

.

.

D

October 3, 1996

Mr. John K. Wood

Vice President - Nuclear

Davis-Besse Nuclear Power Station

Centerior Service Company

5501 North State - Route 2

Oak Harbor, OH 43449

SUBJECT:

NRC INSPECTION REPORT N0. 50-346/96007(DRS)

Dear Mr. Wood:

This refers to the inspection conducted by this office on July 29 through

August 27, 1996. This inspection included a review of activities authorized

for you Davis-Besse Nuclear Power Station. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed report.

The inspection included an assessment of the quality and effectiveness of

engineering and technical support. Areas examined during the inspection are

identified in the report. Within these areas, the inspection consisted of a

selective examination of procedures and representative records, observations

of activities, and interviews witn personnel.

Overall, we determined that engineering was well integrated into the day-to-

day activities of the plant. Engineers were active in the resolution of

technical issues and generally proactive in the identification and resolution

of potentially generic industry concerns. One unresolved item was identified

in your performance of 10 CFR 50.59 licensing evaluations. We have referred

this issue to Nuclear Reactor Regulation for further review.

In accordance with 10 CFR 2.790 of the NRC's " Rules and Practice," a copy of

this letter and its enclosures will be placed in the NRC Public Document Room.

Sincerely,

Geoffrey G. Grant, Director

Division of Reactor Safety

Docket No. 50-346

Enclosure:

Inspection Report

No. 50-346/96007(DRS)

See Attached Distribution:

DOCUMENT NAME: G:\\DRS\\DAV96007.DRS

To receive a copy of this document, Indicate in the box "C" = Copy w/o attach / encl "E" = Copy w/ attach /encI "N" = No copy

0FFICE

DRS/DRP

l 1C.

RIII:DRP

l

RIII:DRS

l th

RIII:DRS

l

NAME

gst

lc

La

Ring

Clayton/ Grant

DATE

9/3g/96

9/sf/96 Y

9/b/96

9/ /96

'

0FFICIAL RECORD COPY

- _ _ _ _ _ _ _ .

i

.

.

,

J. K. Wood

-2-

October 3, 1996

cc w/ encl: John P. Stetz, Senior

Vice President - Nuclear

J. H. Lash, Plant Manager

J. L. Freels, Manager

Regulatory Affairs

State Liaison Officer, State

of Ohio

Robert E. Owen, Ohio

Department of Health

C. A. Glazer, State of Ohio,

Public Utilities Commission

Distribution:

Docket File w/ encl

DRS w/ encl

A. B. Beach, RIII w/ encl

PUBLIC IE-01 w/ encl

RIII PRR w/ encl

Enf. Coordinator, RIII w/ encl

OC/LFDCB w/ encl

SRI, Davis-Besse w/ encl

CAAl w/enci (E-mail)

DRP w/ encl

LPM, NRR w/ encl

W. L. Axelson, RIII w/ enc 1

.

1