Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 3F0785-31, Forwards Fire Protection Evaluations Re Fire Barrier Deviations,Emergency Lights & Protection Against Spurious Actuation of Automatic Fire Suppression Sys,For Review & Concurrence + (15:11:52, 12 December 2024)
- ML20132C558 + (15:11:53, 12 December 2024)
- ML20132C559 + (15:11:53, 12 December 2024)
- ML20132C554 + (15:11:55, 12 December 2024)
- RBG-21-567, Advises That Concern in IE Info Notice 85-09 Not Applicable at Facility,In Response to NRC 850409 Request.Design Includes Remote Shutdown Circuits Separately Fused & Isolated from Main Control Room Circuits + (15:11:55, 12 December 2024)
- ML20132C553 + (15:11:56, 12 December 2024)
- 05000219/LER-1996-013, :on 961113,mounting Bolts Were Missing from a Seismic Restraint Frame Around (MCC)DC-2.Caused by Personnel Error.Required Reading Will Be Issued & Job Orders Provided with Specific Instructions + (15:11:58, 12 December 2024)
- ML20132C551 + (15:11:59, 12 December 2024)
- ML20132C550 + (15:12:00, 12 December 2024)
- ML20132C549 + (15:12:00, 12 December 2024)
- TAC:57023 + (15:12:01, 12 December 2024)
- ML20132C547 + (15:12:03, 12 December 2024)
- ML20132C546 + (15:12:04, 12 December 2024)
- 0CAN088508, Forwards Results of Reanalysis Against NRC Clarification/ Interpretation of App R to 10CFR50 - Supplemental Info, Incorporating Description of Engineering Evaluations Performed Per Generic Ltrs 83-33 & 85-01 + (15:12:05, 12 December 2024)
- B11730, Documents Basis for Continued Position That Auxiliary Feedwater Sys Meets Tech Spec & Design Basis Requirements. Areas Addressed Include Design Basis Analysis,Four & three- Loop Operation & Reanalysis Philosophy + (15:12:06, 12 December 2024)
- ML20132C542 + (15:12:06, 12 December 2024)
- B16057, Informs of Commitments to Revise Surveillance Procedure for Testing DG Air Compressor Auto Start Logic.Ler 96-056-00 Encl + (15:12:08, 12 December 2024)
- ML20132C539 + (15:12:09, 12 December 2024)
- ML20132C537 + (15:12:10, 12 December 2024)
- ML20132C536 + (15:12:11, 12 December 2024)
- ML20132C535 + (15:12:12, 12 December 2024)
- RBG-21-585, Forwards Response to Generic Ltr 85-07, Implementation of Integrated Schedules for Plant Mods. Unlicensed Approach Warranted at Present Since Process for Developing Integrated Living Schedule Program in Developmental Phase + (15:12:12, 12 December 2024)
- ML20132C532 + (15:12:14, 12 December 2024)
- ML20132C528 + (15:12:14, 12 December 2024)
- ML20132C524 + (15:12:15, 12 December 2024)
- ML20132C523 + (15:12:16, 12 December 2024)
- ML20132C518 + (15:12:17, 12 December 2024)
- ML20132C519 + (15:12:17, 12 December 2024)
- IR 05000530/1985009 + (15:12:18, 12 December 2024)
- ML20132C516 + (15:12:19, 12 December 2024)
- ML20132C514 + (15:12:19, 12 December 2024)
- ML20132C513 + (15:12:20, 12 December 2024)
- ML20132C512 + (15:12:21, 12 December 2024)
- PNO-V-85-048, on 850724,licensee Determined That Plant Outage of Greater than 7 Days Expected to Repair Main Condenser. Caused by Damage to Two Condenser Tubes & Heater Drain Tank Inlet Shroud Due to Broken Condenser Baffle + (15:12:21, 12 December 2024)
- ML20132C507 + (15:12:22, 12 December 2024)
- ML20132C510 + (15:12:22, 12 December 2024)
- ML20132C505 + (15:12:23, 12 December 2024)
- PNO-V-85-062A, on 850919,reactor Trip Involving Inoperable Turbine Driven Auxiliary Feedwater Pump & Main Turbine Overspeed Occurred.Caused by Inadequate Lubrication of Bearing.Event Still Under Investigation + (15:12:23, 12 December 2024)
- ML20132C504 + (15:12:24, 12 December 2024)
- ML20132C503 + (15:12:25, 12 December 2024)
- 05000219/LER-1996-012, :on 961112,racked Out Breakers in 4160 Volt Ac Switchgear Did Not Meet Seismic Design Bases.Caused Because Previous Seismic Qualification Walkdowns Failed to Identify Problem.Tie Breakers Were Removed from Cubicle + (15:12:27, 12 December 2024)
- ML20132C500 + (15:12:28, 12 December 2024)
- ML20132C499 + (15:12:28, 12 December 2024)
- ML20132C498 + (15:12:29, 12 December 2024)
- ML20132C497 + (15:12:30, 12 December 2024)
- IR 05000346/1984019 + (15:12:55, 12 December 2024)
- ML20132C494 + (15:12:56, 12 December 2024)
- ML20132C492 + (15:12:57, 12 December 2024)
- ML20132C493 + (15:12:57, 12 December 2024)
- ML20132C491 + (15:12:58, 12 December 2024)
- ML20132C484 + (15:12:59, 12 December 2024)
- ML20132C487 + (15:12:59, 12 December 2024)