Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ST-HL-AE-1305, Submits Info Re Heavy Load Handling Sys.Rept in Response to Generic Ltr 81-07 Submitted on 831219 & Revised Rept Submitted on 841019 Documenting Load Handling Sys at Facility + (14:43:16, 12 December 2024)
- 05000395/LER-1985-025, :on 850828,nonconservative Response Identified for Overpower Delta Temp Setpoint Following 850824 Reactor Trip.Caused by Failure to Install Electrical Jumper on Channel Cards.Jumper Installed & Tested + (14:43:18, 12 December 2024)
- RBG-21-731, Forwards Rev to FSAR Re Provisions for Response Time Testing of safety-related Sys to Provide Consistency Between FSAR & Proposed Tech Specs.Rev Will Be Incorporated Into Future Amend + (14:43:19, 12 December 2024)
- ML20132E964 + (14:43:20, 12 December 2024)
- HL-5288, Responds to NRC Re Violations Noted in Insp Repts 50-321/96-12 & 50-366/96-12.Corrective Actions:Will Evaluate Addl Criteria for Primary Containment & Primary Containment Isolation & Established Goals Re Maint Procedures + (14:43:21, 12 December 2024)
- ML20132E962 + (14:43:22, 12 December 2024)
- ML20132E959 + (14:43:23, 12 December 2024)
- ML20132E956 + (14:43:24, 12 December 2024)
- 05000325/LER-1996-007, :on 960609,high Pressure Coolant Injection Sys Declared Inoperable Due to Steam Supply Valve Packing Leak. Refurbished Valve & Corrected Off Center Condition + (14:43:29, 12 December 2024)
- ML20132E954 + (14:43:33, 12 December 2024)
- 05000249/LER-1985-016-07, :on 850826,equipment Attendant Observed HPCI Room Cooler Fan Breaker Emitting Smoke.Caused by Shorted Motor Contactor Coil.Coil & Auxiliary Contacts Replaced & Maint Procedure DMP 7300-5 Performed + (14:43:35, 12 December 2024)
- ML20132E949 + (14:43:37, 12 December 2024)
- ML20132E951 + (14:43:37, 12 December 2024)
- ML20132E947 + (14:43:38, 12 December 2024)
- ST-HL-AE-5489, Responds to Violations Noted in Insp Repts 50-498/96-06 & 50-499/96-06.Corrective Actions:Verified Operability of Seal on Gate,Installed Welded Stainless Steel Wall & Determined Gate Seals Are Properly Classified as nonsafety-related + (14:43:41, 12 December 2024)
- ML20132E941 + (14:43:42, 12 December 2024)
- ML20132E936 + (14:43:43, 12 December 2024)
- ML20132E934 + (14:43:45, 12 December 2024)
- RBG-21722, Documents Responses to NRC 850726 & 27 Telcon Requests Re Tdi Emergency Diesel Generators.Proposed Maint & Surveillance Program Described in Section 6.0 of PNL-5485 Will Be Implemented Except as Noted on Encl Table 6.3 + (14:43:45, 12 December 2024)
- ML20132E930 + (14:43:46, 12 December 2024)
- ML20132E929 + (14:43:47, 12 December 2024)
- ML20132E927 + (14:43:50, 12 December 2024)
- ML20132E923 + (14:43:51, 12 December 2024)
- ML20132E921 + (14:43:52, 12 December 2024)
- ML20132E919 + (14:43:53, 12 December 2024)
- ML20132E920 + (14:43:53, 12 December 2024)
- ML20132E913 + (14:43:55, 12 December 2024)
- RBG-21730, Responds to Instrumentation & Control Sys Branch Request for Addl Info Re Item 2 of Encl 2 in Tm Novak . Surveillance Test Procedures STP-2010601-210604 Will Include Provisions to Test Interlock Per SER Section 7.4.2.3 + (14:43:55, 12 December 2024)
- IR 05000334/1985014 + (14:43:56, 12 December 2024)
- ML20132E909 + (14:43:57, 12 December 2024)
- ML20132E907 + (14:43:58, 12 December 2024)
- ML20132E908 + (14:43:58, 12 December 2024)
- ML20132E906 + (14:43:59, 12 December 2024)
- ML20132E905 + (14:44:00, 12 December 2024)
- ML20132E900 + (14:44:01, 12 December 2024)
- ML20132E902 + (14:44:01, 12 December 2024)
- ML20132E898 + (14:44:03, 12 December 2024)
- ML20132E897 + (14:44:05, 12 December 2024)
- ML20132E894 + (14:44:06, 12 December 2024)
- ML20132E891 + (14:44:07, 12 December 2024)
- ML20132E890 + (14:44:08, 12 December 2024)
- ML20132E886 + (14:44:09, 12 December 2024)
- PNO-V-85-063, on 850924,reactor Tripped Due to Loss of Main Feedwater Pump.Caused by Work on Condensate Demineralizer Sys Resulting in Flow Oscillations.Reactor Will Be Taken to Mode 5 to Repair Pressurizer Safety Valves + (14:44:09, 12 December 2024)
- ML20132E883 + (14:44:11, 12 December 2024)
- ML20132E881 + (14:44:12, 12 December 2024)
- ML20132E880 + (14:44:13, 12 December 2024)
- ML20132E879 + (14:44:13, 12 December 2024)
- ML20132E878 + (14:44:14, 12 December 2024)
- ML20132E877 + (14:44:14, 12 December 2024)
- ML20132E876 + (14:44:15, 12 December 2024)
- ML20132E873 + (14:44:16, 12 December 2024)
- ML20132E872 + (14:44:17, 12 December 2024)