Forwards Safety Insp Repts 50-454/85-28 & 50-455/85-22 on 850624-28.No Noncompliance Noted
ML20132E947
Person / Time
Site: Byron  Constellation icon.png
Issue date: 07/29/1985
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20132E950 List:
References
NUDOCS 8508020148
Download: ML20132E947 (2)


See also: IR 05000454/1985028

Text

. _. _

. _ _

__ _ _ _ __..

_.

_

__

___ _.

_

__

.

..

.

'

.

JUL 2 hl bbo

l

Docket No. 50-454

Docket No. 50-455

'

Commonwealth Edison Company

ATTN:

Mr. Cordell Peed

Vice President

i

Post Office Box 767

Chicago, IL 60690

i

Gentlemen:

j

This refers to the routine safety inspection conducted by Dr. M. J. Oestmann

of this office on June 24-28, 1985, of activities at Byron Station, Units 1

and 2 authorized by NRC Operating License No. NPF-37 and Construction Permit

r

No. CPPR-131 and to the discussion of our findings with R. Pleniewicz and

others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

i

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

,

!

course of this inspection.

l

!

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

'

Public Document Room.

i

!

We will gladly discuss any questions you have concerning this inspection.

,

Sincerely,

i

s/

I

W. D. Shafer, Chief

Emergency Preparedness and

Radiological Protection Branch

Enclosure:

Inspection Reports

!

No. 50-454/85028(DRSS);

l

No. 50-455/85022(DRSS)

'

q

bb

See Attached List For Distribution

i\\

i

8500020148 850729

!

PDR

ADOCK 05000454

O

PDR

'

l

_-

'

.

Commonwealth Edison Company

2

JUL 2 9 boo

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

V. I. Schlosser, Project Manager

Gunner Sorensen, Site Project

Superintendent

R. E. Querio, Plant Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

Phyllis Dunton, Attorney

General's Office. Environmental

Control Division

D. W. Cassel, Jr., Esq.

Diane Chavez, DAARE/ SAFE

W. Paton, ELD

L. 01shan, NRR LPM

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J. Stevens, NRR

D. Weiss, Licensing Fee Management

Branch

!

f1

,

RIII,kdk/1'df

RII4hu

RIII

R

I

c

Destm

Schumacker

Forney

Sh Le

07/09/85

1[54

\\j

-- --- -- --- - ------- ---

--- --

-

- - - - - - - -

- -

- - - - - -

- - - -

- - - - - - - -- ---------

-