Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133E282 + (13:41:43, 12 December 2024)
- ML20133E281 + (13:41:43, 12 December 2024)
- ML20133E278 + (13:41:44, 12 December 2024)
- ML20133E277 + (13:41:44, 12 December 2024)
- U-600260, Interim Potentially Reportable Deficiency Rept 55-85-09 Re Inadequate Implementation of Design Document Review Process. Initially Reported on 850816.Investigation Plan to Determine as-built Condition of Hardware Implemented + (13:41:45, 12 December 2024)
- ML20133E274 + (13:41:46, 12 December 2024)
- ML20133E272 + (13:41:47, 12 December 2024)
- ML20133E270 + (13:41:47, 12 December 2024)
- ML20133E269 + (13:41:48, 12 December 2024)
- ML20133E268 + (13:41:49, 12 December 2024)
- ML20133E266 + (13:41:49, 12 December 2024)
- ML20133E265 + (13:41:50, 12 December 2024)
- ML20133E264 + (13:41:51, 12 December 2024)
- ML20133E262 + (13:41:51, 12 December 2024)
- ML20133E261 + (13:41:52, 12 December 2024)
- ML20133E260 + (13:41:53, 12 December 2024)
- ML20133E258 + (13:41:54, 12 December 2024)
- ML20133E257 + (13:41:55, 12 December 2024)
- B16131, Informs of Change of Operating License Status of W Herwig, SOP-11337.License Discontinued Due to Transfer on 961217 + (13:41:56, 12 December 2024)
- ML20133E252 + (13:41:56, 12 December 2024)
- IR 05000623/2008009 + (13:41:57, 12 December 2024)
- ML20133E250 + (13:41:57, 12 December 2024)
- ML20133E247 + (13:41:58, 12 December 2024)
- ML20133E245 + (13:41:59, 12 December 2024)
- ML20133E246 + (13:41:59, 12 December 2024)
- ML20133E243 + (13:42:00, 12 December 2024)
- ML20133E240 + (13:42:01, 12 December 2024)
- ML20133E241 + (13:42:01, 12 December 2024)
- ML20133E238 + (13:42:02, 12 December 2024)
- ML20133E237 + (13:42:02, 12 December 2024)
- IR 05000341/1985033 + (13:42:03, 12 December 2024)
- ML20133E234 + (13:42:04, 12 December 2024)
- ML20133E235 + (13:42:04, 12 December 2024)
- ML20133E233 + (13:42:05, 12 December 2024)
- PNO-III-97-002, on 970108,package Was Received from Syncor Intl Nuclear Pharmacy Which Exceeded DOT Regulatory Limits. Licensee Decontaminated Container & Used It for Return Shipment to Syncor Intl on 970109 + (13:42:05, 12 December 2024)
- ML20133E230 + (13:42:06, 12 December 2024)
- ML20133E228 + (13:42:07, 12 December 2024)
- ML20133E229 + (13:42:07, 12 December 2024)
- ML20133E227 + (13:42:08, 12 December 2024)
- ML20133E225 + (13:42:09, 12 December 2024)
- ML20133E226 + (13:42:09, 12 December 2024)
- RBG-21-914, Responds to NRC Re Violations Noted in Insp Rept 50-458/85-29.Corrective Actions:Addl Samples of Welds Previously Accepted by Eight Inspectors Taken & Training Provided for Inspectors Performing Visual Weld Insps + (13:42:10, 12 December 2024)
- ML20133E223 + (13:42:11, 12 December 2024)
- U-600204, Interim Deficiency Rept 55-85-06 Re Internal Wiring & Workmanship Defects in vendor-supplied safety-related Electrical Equipment.Initially Reported on 850626.Next Rept Will Be Submitted within 90 Days + (13:42:11, 12 December 2024)
- ML20133E219 + (13:42:12, 12 December 2024)
- ML20133E218 + (13:42:13, 12 December 2024)
- 05000483/LER-1996-006, :on 961205,turbine Trip & Engineered Safety Features Actuations Occurred Due to B Steam Generator High Level.Turbine Generator Power Was Stabilized at 60 Mwe Until Feedwater Preheating Was Recovered + (13:42:15, 12 December 2024)
- ML20133E215 + (13:42:16, 12 December 2024)
- ML20133E214 + (13:42:16, 12 December 2024)
- ML20133E210 + (13:42:17, 12 December 2024)
- ML20133E211 + (13:42:17, 12 December 2024)
- ML20133E208 + (13:42:18, 12 December 2024)