ML20133E250
| ML20133E250 | |
| Person / Time | |
|---|---|
| Issue date: | 01/02/1997 |
| From: | Gary Comfort NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Sridhar N CENTER FOR NUCLEAR WASTE REGULATORY ANALYSES |
| References | |
| REF-PROJ-M-32 NUDOCS 9701100265 | |
| Download: ML20133E250 (2) | |
Text
January 2,1997
.Mr. Narasi Sridhar WSS Program Element Manager e
Center for Nuclear Waste Regulatory Waste Analysis P.O. Drawer 28510 6220 Culebra Road San Antonio, Texas 78228-0510
SUBJECT:
LETTER REPORT DOCUMENTING THE REVIEW 0F THE SAR FOR THE FUEL RECEIVING AND STORAGE FACILITY, WVNS-SAR-012, REV. O, DRAFT C
Dear Mr. Sridhar:
I have reviewed the referenced submittal and find it acceptable.
The submittal adequately summarizes the Center's review and resolution of comments for WVNS-SAR-012.
Furthermore, feedback from the Department of Energy (D0E) credited your comments as being the most useful set of comments they had received during the review of this document. As such, intermediate milestone 20-5706-001-701 is considered to be completed.
However, as we discussed during our telephone conversation on December 23, 1996, DOE has opted to try to close out the three open items stated in your report.
Under their current schedule, DOE plans to submit responses during the week of January 6, 1997.
Based on our phone conversation, you stated that you shculd be able to close out these items and issue an updated report within 7 calendar days of receipt of DOE's responses. Also, as we discussed, the cover letter of your new report should also summarize the areas of WVNS-SAR-012 that you reviewed and your overall conclusions as to the safety of the information presented in WVNS-SAR-012.
If you have any questions, please call me at (301) 415-8106.
Sincerely, Original signed by GPangburn for Gary C. Comfort, Jr.
Licensing Section 2 Licensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS Project M-32 cc:
J. Linehan, PMDA Distribution Project M-32 PUBLIC
.NRC File Center FCLB R/F 4
{3 f_,y \\
FCSS R/F NMSS R/F Region I TJackson, RI JLinehan, PMDA BStiltenpole, PMDA
[G:\\cn122496.gcc]
b 0FC FCLBo._
6 FCLB 6
FCl,Eh, o NAME GCdfort PShea GP h rn DATE
/M/ 2 /99 of %(/ 9 /97 y[fT/97 I
1Sjgp m ica pgggg ggf @IdM M
_j. ed"o%,
[,
p" l
UNITED STATES l,
g j
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20666-0001 os...../
1 January 2, 1997 Mr. Narasi Sridhar WSS Program Element Manager Center for Nuclear Waste Regulatory Waste Analysis P.O. Drawer 28510 3
6220 Culebra Road San Antonio, Texas 78228-0510
SUBJECT:
LETTER REPORT DOCUMENTING THE REVIEW 0F THE SAR FOR THE FUEL RECEIVING AND STORAGE FACILITY, WVNS-SAR-012, REV. O, DRAFT C
Dear Mr. Sridhar:
I have reviewed the referenced submittal and find it acceptable.
The submittal adequately summarizes the Center's review and resolution of comments for WVNS-SAR-012.
Furthermore, feedback from the Department of Energy (DOE) credited your comments as being the most useful set of comments they had received during the review of this document.
As such, intermediate milestone 20-5706-001-701 is considered to be completed.
However, as we discussed during our telephone conversation on December 23, 1996, DOE has opted to try to close out the three open items stated in your i
report.
Under their current schedule, DOE plans to submit responses during the week of January 6, 1997.
Based on our phone conversation, you stated that you should be able to close out these items and issue an updated report within 7 calendar days of receipt of DOE's responses. Also, as we discussed, the cover letter of your new report should also summarize the areas of WVNS-SAR-012 that you reviewed and your overall conclusions as to the safety of the information presented in WVNS-SAR-012.
If you have any questions, please call me at (301) 415-8106.
Sincerely, Gary C. Co f rt, Jr.
Li nsing ection 2 Licensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS Project M-32 cc:
J. Linehan, PMDA