ML20133E268
| ML20133E268 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 05/10/1985 |
| From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Wilgus W FLORIDA POWER CORP. |
| References | |
| NUDOCS 8508070623 | |
| Download: ML20133E268 (2) | |
See also: IR 05000729/2008002
Text
_
VeUn
.
w
MAY1 0 1985
Florida Power Corporation
ATTN: Mr. W. S. Wilgus
Vice President Nuclear Operations
P. O. Box 14042, M.A.C. H-2
St. Petersburg, FL 33733
Gentlemen:
SUBJECT:
INSPECTION OF COMPLIANCE WITH 10 CFR 50 APPENDIX R, SECTIONS III.G,
III.J. III.L AND III.0 AND ASSOCIATED FIRE PROTECTION FEATURES -
CRYSTAL RIVER 3 DOCKET NO. 50-302
This letter is to confirm the dates of July 29 - August 2,1985, for the special
inspection of Crystal River 3, which were established daring the telephone
conversation of May 7,1985, between R. M. Bright, of your staff, and
T. F. Stetka and W. H. Miller, of this Office.
The purpose of this inspection is to evaluate Crystal River Unit 3 for compliance
with Sections III.G, III.J. III.L and III.0 of Appendix R to 10 CFR 50. This
will be a team type inspection composed of personnel from the NRC Region II
Office and, based on their availability, personnel from NRC's Office of Nuclear
Reactor Regulation.
In order for us to properly prepare and perform this type of comprehensive and
complex inspection, we request that you provide this Office with the latest
revision to the following additional information by June 24, 1985:
1.
Pipingandinstrumentation(flow)diagramsforhotstandby(shutdown)and
cold shutdown systems, alternative or dedicated shutdown and the reactor
coolant pump oil collection system.
2.
Plant layout and equipment location drawinos which identify the physical
plant locations of hot standby (shutdown) and cold shutdown equipment.
3.
Color coded marked-up electrical raceway drawings which identify the cable
routing of power and control circuits for those plant systems necessary to
achieve and maintain hot standby (shutdown).
4.
Single line AC and DC power and control electrical distribution diagrams. N
5.
Plant layout drawings which identify fire area delineation and fire protec-
N
tion equipment locations.
6.
Marked-up plant layout drawings which identify the locations of emergency
lighting units.
7.
Associated dradings which depict the physical and the seismic design of
reactor coolant pump oil collection system.
8.
Associated circuit analysis.
RB8"S88n "i88a b
reol
G
IQ
$
Florida Power Corporation
2
MAY 101985
9.
Plant Operating Procedures which describe normal hot and cold shutdown from
i
inside the control room, emergency hot and cold shutdown from emergency
control stations outside and independent of the control room, and shutdown
operations which utilize alternative or dedicated shutdown capability and
r
natural circulation.
10. Fire damage control and repair procedures for cold shutdown systems.
-
In addition to the information requested above, copies of any other analysis
!
and/or evaluation which demonstrate compliance to Sections III.G III.J. and
III.L of Appendix R should be available on site for review during this
-
,
inspection. Appropriate personnel, knc'.eledgeable with respect to those plant
!
systems required for safe shutdown and their capabilities, should be available at
the site during this inspection. Also, we request that your staff make the
i
necessary arrangements to permit team members ready access to the radiologically
,'
controlled areas of the plant if necessary.
Your cooperation with us during this inspection will be appreciated. Should you
have any questions concerning this letter, we will be glad to discuss them with
1
you.
Sincerely,
s
Original Signed by
Roger D. Walker
l
Roger D. Walker, Director
Division of Reactor Projects
cc:
E. M. Howard, Director
Site Nuclear Operations
P. F. McKee, Nuclear Plant Manager
l
G. R. Westafer, Manager
l
Nuclear Operations Licensing
i
and Fuel Management
!
I
bec:
H. Silver, ORAB/NRR
i
A. R. Herdt
!
T. Conlon
i
V. Panciera
i
P. Madden
W. Miller
G. Wiseman
j
NRC Resident Inspector
i
Document Control Desk
State of Florida
.
R
I
R
(g
jrj4 g
N
yt,v
,
er:bh
T onion *
ARHerdt
PRBemis
V rownlee
5/3 )'8
5/g/85
5/%/85
5/$/85
5/ 9 /85
s
N