Confirms Special Insp of Compliance W/Sections Iii.G, Iii.J & Iii.O of App R to 10CFR50 & Associated Fire Protection Features on 850729-0802.Addl Info,Including Plant Layout & Equipment Location Drawings,Requested by 850624
ML20133E268
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/10/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Wilgus W
FLORIDA POWER CORP.
References
NUDOCS 8508070623
Download: ML20133E268 (2)


See also: IR 05000729/2008002

Text

_

VeUn

.

w

MAY1 0 1985

Florida Power Corporation

ATTN: Mr. W. S. Wilgus

Vice President Nuclear Operations

P. O. Box 14042, M.A.C. H-2

St. Petersburg, FL 33733

Gentlemen:

SUBJECT:

INSPECTION OF COMPLIANCE WITH 10 CFR 50 APPENDIX R, SECTIONS III.G,

III.J. III.L AND III.0 AND ASSOCIATED FIRE PROTECTION FEATURES -

CRYSTAL RIVER 3 DOCKET NO. 50-302

This letter is to confirm the dates of July 29 - August 2,1985, for the special

inspection of Crystal River 3, which were established daring the telephone

conversation of May 7,1985, between R. M. Bright, of your staff, and

T. F. Stetka and W. H. Miller, of this Office.

The purpose of this inspection is to evaluate Crystal River Unit 3 for compliance

with Sections III.G, III.J. III.L and III.0 of Appendix R to 10 CFR 50. This

will be a team type inspection composed of personnel from the NRC Region II

Office and, based on their availability, personnel from NRC's Office of Nuclear

Reactor Regulation.

In order for us to properly prepare and perform this type of comprehensive and

complex inspection, we request that you provide this Office with the latest

revision to the following additional information by June 24, 1985:

1.

Pipingandinstrumentation(flow)diagramsforhotstandby(shutdown)and

cold shutdown systems, alternative or dedicated shutdown and the reactor

coolant pump oil collection system.

2.

Plant layout and equipment location drawinos which identify the physical

plant locations of hot standby (shutdown) and cold shutdown equipment.

3.

Color coded marked-up electrical raceway drawings which identify the cable

routing of power and control circuits for those plant systems necessary to

achieve and maintain hot standby (shutdown).

4.

Single line AC and DC power and control electrical distribution diagrams. N

5.

Plant layout drawings which identify fire area delineation and fire protec-

N

tion equipment locations.

6.

Marked-up plant layout drawings which identify the locations of emergency

lighting units.

7.

Associated dradings which depict the physical and the seismic design of

reactor coolant pump oil collection system.

8.

Associated circuit analysis.

RB8"S88n "i88a b

reol

G

PDR

IQ

$

Florida Power Corporation

2

MAY 101985

9.

Plant Operating Procedures which describe normal hot and cold shutdown from

i

inside the control room, emergency hot and cold shutdown from emergency

control stations outside and independent of the control room, and shutdown

operations which utilize alternative or dedicated shutdown capability and

r

natural circulation.

10. Fire damage control and repair procedures for cold shutdown systems.

-

In addition to the information requested above, copies of any other analysis

!

and/or evaluation which demonstrate compliance to Sections III.G III.J. and

III.L of Appendix R should be available on site for review during this

-

,

inspection. Appropriate personnel, knc'.eledgeable with respect to those plant

!

systems required for safe shutdown and their capabilities, should be available at

the site during this inspection. Also, we request that your staff make the

i

necessary arrangements to permit team members ready access to the radiologically

,'

controlled areas of the plant if necessary.

Your cooperation with us during this inspection will be appreciated. Should you

have any questions concerning this letter, we will be glad to discuss them with

1

you.

Sincerely,

s

Original Signed by

Roger D. Walker

l

Roger D. Walker, Director

Division of Reactor Projects

cc:

E. M. Howard, Director

Site Nuclear Operations

P. F. McKee, Nuclear Plant Manager

l

G. R. Westafer, Manager

l

Nuclear Operations Licensing

i

and Fuel Management

!

I

bec:

H. Silver, ORAB/NRR

i

A. R. Herdt

!

T. Conlon

i

V. Panciera

i

P. Madden

W. Miller

G. Wiseman

j

NRC Resident Inspector

i

Document Control Desk

State of Florida

.

R

I

R

(g

jrj4 g

N

yt,v

,

er:bh

T onion *

ARHerdt

PRBemis

V rownlee

5/3 )'8

5/g/85

5/%/85

5/$/85

5/ 9 /85

s

N