Confirms 850708-12 for Special Insp of Compliance W/Sections Iii.G,Iii.J & Iii.O of 10CFR50,App R & Associated Fire Protection Features.Addl Info,Including Plant Layout & Equipment Location Drawings,Requested by 850607
ML20133E247
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 05/07/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
References
NUDOCS 8508070616
Download: ML20133E247 (3)


Text

,

y NAY 7 1985 Virginia Electric and Power Company ATTN: Mr. W. L. Stewart, Vice President Nuclear Operations P. O. Box 26666 Richmond, VA 23261 Gentlemen:

SUBJECT:

INSPECTION OF COMPLIANCE WITH 10 CFR 50, APPENDIX R, SECTIONS III.G.,

III.J. AND III.0. AND ASSOCIATED FIRE PROTECTION FEATURES -

NORTH ANNA UNITS 1 AND 2, DOCKET NOS. 50-338 AND 50-339 This letter is to confirm the dates of July 8-12, 1985, for the special inspac-tion of North Anna Units 1 and 2, which were established during the telephone conversation of April 29, 1985, between Mr. J. Heigner, of your staff, and Mr. S. Elrod, of this Office.

The purpose of this inspection is to evaluate North Anna Units 1 and 2 for compliance with Sections III.G, III.J. and III.0 of Appendix R to 10 CFR 50. In addition, this inspection will review the implementation of the Fire Protection Program and the Requirements of Operating License paragraph 2.C.(11) for Unit 2.

This will be a team type inspection composed of personnel from the NRC Region II Office and, based on their availability, personnel from NRC's Office of Nuclear Reactor Regulation.

In order for us to properly prepare and perform this type of comprehensive and complex inspection, we request that you provide this Office with the latest revision to the following additional information by June 7, 1985:

1. Piping and instrumentation (flow) diagrams for hot standby (shutdown) and cold shutdown systems, alternative or dedicated shutdown and the reactor coolant pump oil collection system.
2. Plant layout and equipment location drawings which identify the physical plant locations of hot standby (shutdown) and cold shutdown equipment.
3. Color coded marked-up electrical raceway drawings which identify the cable routing of power and control circuits for those plant systems necessary to achieve and maintain hot standby (shutdown).
4. Single line AC and DC power and control electrical distribution diagrams.
5. Plant layout drawings which identify fire area delineation and fire protec-tion equipment locations.
6. Marked-up pinnt layout drawings which identify the locations of emergency lighting units.

850e070616 850507 PDR O

ADOCK 05000338 PDR fh I O

Virginia Electric and Power Company 2 PAf 7 1985

7. Associated drawings which depict the physical and the seismic design of the reactor coolant pump oil collection system.
8. Associated circuit analysis.
9. Plant Operating Procedures which describe normal hot and cold shutdown from inside the control room, emergency hot and cold shutdown from emergency control stations outside and independent of the control room, and shutdown operations which utilize alternative or dedicated shutdown capability and natural circulation.
10. Fire damage control and repair procedures for cold shutdown systems.

In addition to the information requested above, copies of any other analysis and/or evaluation which demonstrate compliance to Sections III.G, III.J. and III.O. of Appendix R should be available on site for review during this inspec-tion. Appropriate personnel, knowledgeable with respect to those plant systems required for safe shutdown and their capabilities, should be available at the site during this inspection. Also, we request that your staff make the necessary arrangements to permit team members ready access to the radiologically controlled areas of the plant if necessary.

Your cooperation with us during this inspection will be appreciated. Should you have any questions concerning this letter, we will be glad to discuss them with you.

Sincerely, V,3(hen N V ~~

Roger D. Walker, Director Division of Reactor Projects t

cc: J. I. Oatts, Chief Operating Officer W. S. Histr, Manager - Security E. H. Harrell, Station Manager bec: (See page 3)

.o Virginia Electric and Power Company 3 MAY 7 1985 bec: L. Engle, ORB 3/NRR A. R. Herdt T. Conlon P. Madden W. Miller G. Wiseman P. Taylor M. Hunt NRC Resident Inspector Document Control Desk Coninonwealth of Virginia RIJ RII RII { RII RII c/s'eman:en (ao ie,Mn s

< i,. i ,

bAHerdt ue, yBe se, v, p)&Brownlee