Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133E389 + (13:40:44, 12 December 2024)
- ML20133E387 + (13:40:45, 12 December 2024)
- ML20133E386 + (13:40:45, 12 December 2024)
- ML20133E383 + (13:40:46, 12 December 2024)
- ML20133E380 + (13:40:47, 12 December 2024)
- 05000454/LER-1985-087, :on 850902,four Auxiliary Bldg Sprinkler Sys Did Not Alarm When Tested & 10 H Elapsed Before Surveillance Entered.Caused by Failure of Equipment Attendants to Inform Shift Engineer + (13:40:49, 12 December 2024)
- ML20133E375 + (13:40:50, 12 December 2024)
- ML20133E373 + (13:40:51, 12 December 2024)
- ML20133E372 + (13:40:52, 12 December 2024)
- ML20133E371 + (13:40:53, 12 December 2024)
- ML20133E367 + (13:40:55, 12 December 2024)
- 05000416/LER-1985-007-02, Forwards LER 85-007-02,revising Rept Submitted by .Ge Dual Solenoid Valve Number Corrected.Part 21 Related + (13:41:01, 12 December 2024)
- ML20133E364 + (13:41:02, 12 December 2024)
- ML20133E360 + (13:41:03, 12 December 2024)
- ML20133E359 + (13:41:04, 12 December 2024)
- ML20133E356 + (13:41:04, 12 December 2024)
- 05000259/LER-1985-024-01, :on 850612,inadvertent Isolation Signal Initiated Due to Blown Fuse in Primary Containment Isolation Sys Circuitry.Caused by Relay Coil Failure.Coil & Fuse Replaced + (13:41:06, 12 December 2024)
- ML20133E353 + (13:41:07, 12 December 2024)
- ML20133E352 + (13:41:08, 12 December 2024)
- ML20133E351 + (13:41:08, 12 December 2024)
- ML20133E350 + (13:41:09, 12 December 2024)
- ML20133E346 + (13:41:10, 12 December 2024)
- ML20133E345 + (13:41:10, 12 December 2024)
- B16138, Forwards Revised Pages of Mnps,Unit 3,Independent Corrective Action Verification Program + (13:41:11, 12 December 2024)
- ML20133E342 + (13:41:12, 12 December 2024)
- ML20133E340 + (13:41:12, 12 December 2024)
- ML20133E338 + (13:41:13, 12 December 2024)
- ML20133E339 + (13:41:13, 12 December 2024)
- IR 05000395/1985010 + (13:41:14, 12 December 2024)
- U-600181, Forwards,For Review,Rev 4 to Physical Protection Plan Required for Storage of Unirradiated Nuclear Fuel for Clinton Power Station.Rev Withheld (Ref 10CFR73.21) + (13:41:15, 12 December 2024)
- ML20133E335 + (13:41:16, 12 December 2024)
- ML20133E334 + (13:41:17, 12 December 2024)
- ML20133E333 + (13:41:17, 12 December 2024)
- ML20133E331 + (13:41:18, 12 December 2024)
- ML20133E330 + (13:41:19, 12 December 2024)
- ML20133E325 + (13:41:19, 12 December 2024)
- ML20133E324 + (13:41:20, 12 December 2024)
- ML20133E322 + (13:41:21, 12 December 2024)
- ML20133E323 + (13:41:21, 12 December 2024)
- ML20133E317 + (13:41:22, 12 December 2024)
- 05000336/LER-1996-039-02, :on 961106,licensee Failed to Perform Periodic Surveillance Testing for Containment Purge Sys Containment Isolation Valves IAW TS 4.9.10.Caused by Inadequate Program design.SP-2605H Has Been Revised to Test Isolation Functio + (13:41:24, 12 December 2024)
- ML20133E315 + (13:41:25, 12 December 2024)
- ML20133E313 + (13:41:26, 12 December 2024)
- IR 05000370/1985007 + (13:41:27, 12 December 2024)
- ML20133E309 + (13:41:27, 12 December 2024)
- 05000336/LER-1996-039, Forwards LER 96-039-00 Which Documents Event That Occurred at Mnps,Unit 2 on 961106.Commitment Made within Ltr,Listed + (13:41:28, 12 December 2024)
- ML20133E308 + (13:41:28, 12 December 2024)
- L-84-330, Responds to Violations Noted in Insp Repts 50-250/84-23 & 50-251/84-24.Corrective Actions:Procedures Re Design Changes,Pump Surveillance & Emergency Diesel Generator Surveillance Testing Revised.Personnel Being Retrained + (13:41:29, 12 December 2024)
- ML20133E304 + (13:41:30, 12 December 2024)
- ML20133E303 + (13:41:30, 12 December 2024)
- IR 05000395/1985012 + (13:41:31, 12 December 2024)
- ML20133E301 + (13:41:31, 12 December 2024)