. _.

C(Mciql So-D'l MAY 221985 Georgia Power Company ATTN: Mr. D. O. Foster, Vice President and Project General Manager, Vogtle Project Route 2, Box 299A l

Waynesboro, Georgia 30830 l

Gentlemen:

l

SUBJECT:

PARTICIPATION OF V0GTLE ELECTRIC GENERATING PLANT LINE MANAGEMENT IN THE REVIEW OF READINESS REVIEW MODULE NO.1 - REINFORCED CONCRETE STRUCTURES We have completed an initial review of the first Vogtle readiness review module and it now seems appropriate to reiterate a general comment on the readiness review program concept which we discussed at the March 25, 1985 meeting in Region II on the subject module. There are many benefits of a well-structured, sys-tematic, readiness review program for determining the operational readiness of the plant, personnel, and programs. We believe a key and necessary ingredient of the readiness review program is the direct involvement of line management and personnel in reviewing and attesting to the acceptability and readiness of their respective areas of responsibility. This review process would generally include all levels of line management up to and including the project general manager.

The Georgia Power Company letter of October 3,1984, from Mr. R. E. Conway to Mr. J. P. O'Reilly, NRC, identified numerous licensee self-assessments factored into the readiness review program, to include the final determination of accepta-bility of each readiness review module by you.

If you recall, we discussed at the meeting the role of and the knowledge of your line management and staff in determining acceptability and readiness of the plant, personnel, and programs.

One of the Georgia Power Company staff mentioned at the meeting that there were numerous interviews and questions asked of the line management and staff during the preparation of the module. In my review of the module, we did not see where these interviews, questions, self-assessments, and final determinations of acceptability by line management for the Vogtle plant were documented or re-ferenced in the module. We believe these reviews by the line management are significant and important enough to be addressed in future modules.

The in-creased review and participation by line management in the recently submitted module entitled " Initial Test Program" is a step in the right direction.

We are pleased to see the progress you are making in implementing the Vogtle Readiness Review Program.

Please feel free to contact us if you have any questions or concerns on this letter or the program in general.

Sincerely, Cb 8D00070637 B50522 PDR ADOCK 050004P4 J. Nelson Grace pon A

Regional Administrator t0 cc:

(See page 2)

IEo /

MAY 221985 Georgia Power Company 2

cc:

R. E. Conway, Senior Vice President Nuclear Power D. O. Foster, Vice President and General Manager Vogtle Project H. H. Gregory, III, General Manager, Vogtle Nuclear Construction G. Bockhold, Jr., Vogtle Plant Manager L. T. Gucwa, Chief Nuclear Engineer Ruble A. Thomas, Vice President-Licensing Vogtle Project Ed Groover, Quality Assurance Site Manager C. W. Hayes, QA Manager J. T. Beckham, Vice President

& General Manager - Operations J. A. Bailey, Project Licensing Manager George F. Trowbridge, Esq.

Shaw, Pittman, Potts and Trowbridge Bruce W. Churchill, Esq.

Shaw, Pittman, Potts and Trowbridge Ernest L. Blake, Jr., Esq.

Shaw, Pittman, Potts and Trowbridge James E. Joiner, Troutman, Sanders, Lockerman and Ashmore James G. Ledbetter, Commissioner Department of Human Resources Charles H. Badger, Office of Planning and Budget, Management Review Division Deppish Kirkland, III, Counsel Office of the Consumer's Utility Council Douglas C. Teper, Georgians Against Nuclear Energy Laurie Fowler, Legal Environmental Assistance Foundation Tim Johnson, Executive Director Educational Campaign for a Prosperous Georgia Morton B. Margulies, Esq., Chairman Administrative Judge, Atomic Safety and Licensing Board Panel Dr. Oscar H. Paris, Administrative Judge Atomic Safety and Licensing Board Panel Gustave A. Linenberger, Jr., Administrative Judge, Atomic Safety and Licensing Board Panel bec: (See page 3)

i i

MAY 221985 l

Georgia Power Company 3

l bec:

E. J. Reis, ELD M. V. Sinkule. RII W. M. Hill, IE M. A. Miller, NRR W. E. Brach EDO NRC Resident Inspector Document Control Desk State of Georgia L

(

[

l l

l I

l l

RE i

4$4 i

wnew s/:Hss p

g h

f (4k l

I 6

l MSinkule VBrownlee RWalker 1shinski 5/([/85 5/f/85 5/Jo/85 5/Je/85 l

l t

i l

-