Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133M892 + (12:29:11, 12 December 2024)
- ML20133M891 + (12:29:12, 12 December 2024)
- ML20133M885 + (12:29:13, 12 December 2024)
- ML20133M889 + (12:29:13, 12 December 2024)
- ML20133M884 + (12:29:14, 12 December 2024)
- IR 05000155/1985011 + (12:29:15, 12 December 2024)
- ML20133M881 + (12:29:16, 12 December 2024)
- ML20133M879 + (12:29:16, 12 December 2024)
- ML20133M878 + (12:29:17, 12 December 2024)
- U-600211, Requests NRC Concurrence to Terminate Overinsp Program for HVAC Duct & Duct Supports.Technical Justification & Util Answers to NRC Questions & Comments Per Encl + (12:29:18, 12 December 2024)
- ML20133M874 + (12:29:19, 12 December 2024)
- ML20133M873 + (12:29:19, 12 December 2024)
- ST-HL-AE-1304, Final Deficiency Rept Re Inadequate Flow Protection of Category I Structures.Initially Reported on 841220.Design Changes Include Installation of Watertight Door for Lower Elevation of Turbine Generator & Check Valves + (12:29:20, 12 December 2024)
- ML20133M866 + (12:29:21, 12 December 2024)
- ML20133M867 + (12:29:21, 12 December 2024)
- ML20133M863 + (12:29:22, 12 December 2024)
- U-600268, Forwards Justification for Not Fireproofing Div 2 Switchgear Ducts Per Safe Shutdown Analysis.Adequate Justification Provided to Eliminate Need for Affected Duct Fire Wrap + (12:29:23, 12 December 2024)
- ML20133M854 + (12:29:24, 12 December 2024)
- ML20133M853 + (12:29:25, 12 December 2024)
- ML20133M851 + (12:29:25, 12 December 2024)
- ML20133M848 + (12:29:26, 12 December 2024)
- ML20133M842 + (12:29:27, 12 December 2024)
- ML20133M844 + (12:29:27, 12 December 2024)
- ML20133M841 + (12:29:28, 12 December 2024)
- ML20133M840 + (12:29:29, 12 December 2024)
- IR 05000310/2005027 + (12:29:36, 12 December 2024)
- IR 05000298/1985010 + (12:29:37, 12 December 2024)
- ML20133M838 + (12:29:37, 12 December 2024)
- ML20133M833 + (12:29:38, 12 December 2024)
- ML20133M832 + (12:29:39, 12 December 2024)
- 05000325/LER-1985-016-01, :on 850923,nonquantifiable Leakage Noted in Primary Containment Isolation Valves 6 1-E11-F020A,B, 1-E21-F001A,B & 1-E21-F031B.Caused by Faulty Seats,Jackings & Discs.Valves Repaired & Returned to Svc + (12:29:41, 12 December 2024)
- ML20133M827 + (12:29:42, 12 December 2024)
- ML20133M824 + (12:29:43, 12 December 2024)
- ML20133M818 + (12:29:44, 12 December 2024)
- IR 05000482/1985017 + (12:29:44, 12 December 2024)
- ML20133M817 + (12:29:45, 12 December 2024)
- A05046, Responds to NRC Re Allegation Program.Corrective actions:full-time Consultant Hired to Aid in Establishing Effective Onsite Facility,Designated as Quality Concern Ofc, Where Allegations Can Be Expressed + (12:29:46, 12 December 2024)
- ML20133M815 + (12:29:46, 12 December 2024)
- ML20133M807 + (12:29:48, 12 December 2024)
- ML20133M804 + (12:29:49, 12 December 2024)
- ML20133M805 + (12:29:49, 12 December 2024)
- ML20133M799 + (12:29:50, 12 December 2024)
- ML20133M790 + (12:29:51, 12 December 2024)
- 3F0197-06, Forwards Response to Five Questions Generated by Contractor, Inel,During Review of & Relief Request 95-050, Rev 1 Which Incorporates Addl Info Associated W/Inel Questions,Per 10CFR50.55a(g)(5)(ii) + (12:29:52, 12 December 2024)
- ML20133M786 + (12:29:53, 12 December 2024)
- ML20133M784 + (12:29:53, 12 December 2024)
- IR 05000155/1985013 + (12:29:54, 12 December 2024)
- ML20133M777 + (12:29:55, 12 December 2024)
- ML20133M771 + (12:29:56, 12 December 2024)
- ML20133M769 + (12:29:57, 12 December 2024)
- ML20133M768 + (12:29:58, 12 December 2024)