Georg.a Pcwer Company 333 Paimont Awoue Attenta. Georgia 33#3 Te%choN 404 52G652C W Lng Adrew l
P:s! C"ca Bo? 4N5 l
ewa. ceg.a acace Georgia Power L T. Gucwa i
W G#N " N
- WW" l
Manayr NxWar EngnNr ng a,aGnem m ew w NED-85-751 1994N October 11, 1985 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief j
Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555 NRC 00CKETS 50-321, 50-366
[' '
EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 5
' OPERATING LICENSES DPR-57, NPF-5 s
OUTSTANDING SUBMITTALS LIST Gentibmen:
Attached is the latest update to which a written response is 'jof_ the listing of correspondence with NRR expected as originally identified in our letter of August 15, 1985.
The attachment is tabulated chronologically by Georgia Power Company's (GPC) submittal date.
GPC is ready - to discuss modifications to this status report and will promptly address any questions you,mightgave regarding these licensing issues.
GPC acknokledges and appreciates the recent NRC efforts to complete licensing ' action on our -submittals related to the _ thermal hydraulic stability
- issus, HCU low pressure alarm and ADS Timer ' Technical Specification, removal of the Equipment Qualification Deadline for Technical Specification 'and RCIC Instrumentation footnote. We respectfully request
~
your continued efforts to expedite those priority items submitted in support of the upcoming Unit 1 outage, as noted in the attachment.
If you have further questions, please contact this office at any time.
s Very truly yours, fr q =
L. T. Gucwa MJB/lc Attachment xc:
Mr. J. T. Beckham, Jr.
Mr. H. C. Hix, Jr.
Dr.3J N. Grace (NRC-Region II)
Senior Resident Inspector
()g\\
h t
8510280301 951011
~
4 PDR ADOCK 05000321 P
Page No.
1 10/11/85 OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC LLITER UNIT SUBJECT DATE O APPROVAL OF ITEM REQUIRED FOR UPCOMING OUTAGE C ITEM CLOSED SINCE LAST REPORT 01/26/77 321 ILRT CHANGES 08/30/77 321 ALLOW USE OF MODIFIED CRANE TO LIFT SPENT FUEL CA 10/03/78 321 CHANGE PSW, DIESEL REQUIREMENTS TO REFLECT SWING STATU D/G 1B 03/05/79 321 REMOVE REFERENCE TO OUTDATED VERSION OF APPENDIX 09/27/82 366 ENGINEERING ANALYSISBUILDING SETTLEMENT SU 04/15/83 321,366 GENERIC LETTER 82 REQUIREMENTS FOR EM CAPABILITY 06/15/83 321,366 LETTER 8-5137)DRYWELL PURGE AND VENT CHANGE (SEE 12/21/83 321,366 REQUIRE H202 ANALYZER CONTINUOUS OPERATION 04/23/84 366 ATWS RPT CLARIFICATIONS 09/05/84 366 PRIMARY CONTAINMENT ISOLATION OF PURGE AN 09/12/84 321 OPERABILITY DEFINITION 09/19/84 366 FEEDUATER NOZZLEFRACTURE MECHANICS ANALYSIS 10/01/84 321,366 C DELETE AERIAL REMOTE MONITORING FROM ETS 11/09/84 321,366 DIESEL GENERATOR SPECIFICATIONS 01/10/85 366 SYSTEM STAINLESS STEEL PIPEREQUEST TO RE 01/11/85 321 DEFINITION OF " CUMULATIVE DOWNTIME" P 01/17/85 321 HNP-1 PROPOSED FIRE PROTECTION TECHNICAL SPE MODIFICATION TO THE NUMBER AND LOCATION OF 02/15/85 366 C TECHNICAL SPECIFICATION CHANGE:
SYSTEM TIMER MASTER PARTS LIST N
Page No.
1 10/11/85 OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC LETTER UNIT SUBJECT DATE O APPROVAL OF ITEM REQUIRED FOR UPCOMING OUTAGE C ITEM CLOSED SINCE LAST REPORT 01/26/77 321 ILRT CHANGES 08/30/77 321 ALLOW USE OF MODIFIED CRANE TO LIFT SPENT FUEL CASK 10/03/78 321 CHANGE PSW, DIESEL REQUIREMENTS TO REFLECT SUING STATUS OF D/G 1B 03/05/79 321 REMOVE REFERENCE TO OUTDATED VERSION OF APPENDIX J 09/27/82 366 BUILDING SETTLEMENT SURVEILLANCE - SUBMIT RESULTS OF ENGINEERING ANALYSIS 04/15/83 321,366 GENERIC LETTER 82 REQUIREMENTS FOR EMERGENCY RESPONSE CAPABILITY 06/15/83 321,366 DRYWELL PURGE AND VENT CHANGES FOR 18" ISOLATION VALVES (SEE LETTER 8-5137) 12/21/83 321,366 REQUIRE H202 ANALYZER CONTINUOUS OPERATION AFTER LOCA ONLY 04/23/84 366 ATUS RPT CLARIFICATIONS 09/05/84 366 PRIMARY CONTAINMENT ISOLATION OF PURGE AND VENT ON HI RAD 09/12/84 321 OPERABILITY DEFINITION 09/19/84 366 PRACTURE MECHANICS ANALYSIS PER GENERIC LETTER 81 FEEDWATER NOZZLE 10/01/84 321,366 C DELETE AERIAL REMOTE MONITORING FROM ETS 11/09/84 321,366 DIESEL GENERATOR SPECIFICATIONS 01/10/85 366 REQUEST TO RESCIND CONFIRMATORY ORDER ON REACTOR COOLANT SYSTEM STAINLESS STEEL PIPE 01/11/85 321 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - DELETION OF DEFINITION OF " CUMULATIVE DOWNTIME" 01/17/85 321 HNP-1 PROPOSED FIRE PROTECTION TECHNICAL SPECIFICATIONS -
MODIFICATION TO THE NUMBER AND LOCATION OF FIRE DETECTORS 02/15/85 366 C TECHNICAL SPECIFICATION CHANGE:
HYDRAULIC CONTROL UNIT LOW l
PRESSURE ALARM SETPOINT AND AUTOMATIC DEPRESSURIZATION SYSTEM TIMER MASTER PARTS LIST NUMBER REVISION l
r
~
Page No.
2 10/11/85 OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC LETTER UNIT SUBJECT DATE 03/11/85 321,366 C REMOVAL OF 6/30/82 EQUIPMENT QUALIFICATION DEADLINE FROM TECHNICAL SPECIFICATIONS 05/06/85 321,366 PROPOSED MODIFICATIONS AND SCHEDULE FOR REACTOR WATER LEVEL INSTRUMENTATION IMPROVEMENTS - GENERIC LETTER 84-23 05/09/85 366 REQUEST FOR TECHNICAL SPECIFICATION RELIEF - OVERCURRENT PROTECTION FOR CONTAINMENT PENETRATIONS 05/13/85 321,366 REQUEST FOR ADDITIONAL INFORMATION - SEIS!!IC SPECTRA BROADENING 05/20/85 321 CHANGE TO TECHNICAL SPECIFICATIONS - DELETE REPORTING REQUIREMENTS FOR PRIMARY COOLANT AND SECONDARY CONTAINMENT LEAK RATE 06/03/85 321,366 REQUEST FOR ADDITIONAL INFORMATION GENERIC LETTER 83 SALEM EVENT - SCRAM BREAKER FAILURE 06/24/85 321 EDITORIAL CHANGE TO THE TECHNICAL SPECIFICATIONS TO CORRECT A TYPOGRAPHICAL ERROR
- HPCI SURVEILLANCE 06/25/85 321,366 INSERVICE TESTING - INSERVICE INSPECTION PROGRAMS UPDATE 07/18/85 321 O REQUEST FOR CODE RELIEF ON 10 YEAR INSERVICE INSPECTION REQUIREMENTS 07/19/85 321,366 O SCHEDULE FOR SUBMITTAL FOR PLAN OF ANTICIPATED TRANSIENTS WITHOUT SCRAM MODIFICATIONS FOR NON-SAFETY RELATED EQUIPMENT 07/24/85 321 0 CHANGE TO TECHNICAL SPECIFICATIONS - ANALOG TRIP TRANSMITTER SYSTEM 07/26/85 321 REQUEST TO REVISE TECHNICAL SPECIFICATIONS - ADD SPECIFICATION AND TABLE ADDRESSING COMPONENT CYCLIC AND TRANSIENT LIMITS 08/01/85 321 O REQUEST FOR TECHNICAL SPECIFICATION RELIEF - 10 YEAR REQUIREMENTS INSERVICE INSPECTION 08/02/85 366 REQUEST TO REVISE TECHNICAL SPECIFICATIONS - HYDROGEN RECOMBINER HEATER INTEGRITY TEST SPECIFICATION 08/02/85 321 C RESOLUTION OF CORE THERMAL HYDRAULIC STABILITY ISSUE 08/20/85 321,366 PROPOSED SURVEILLANCE TECHNICAL SPECIFICATIONS FOR FAST l
ACTING DAMPERS FOR PROTECTION OF SGTS - POCR 85-15 i
l
a Page No.
3 10/11/85 OUTSTA!! DING LICENSING ISSUES WIT!i SUBMITTAL AT NRC LETTER UNIT SUBJECT DATE 08/20/85 321 O PROPOSED Cl!ANGES TO THE TECHNICAL SPECIFICATIONS FOR IIIGil RADIATION ISOLATION OF PURGE AND VENT VALVES - DOCR 85-20 08/22/85 321 O REQUEST FOR APPROVAL OF ANOTIIER CYCLE WITH CORE SPRAY SPARGER CLAMP 08/23/85 321,366 O CliANGE TO TECHNICAL SPECIFICATIONS - DRYWELL PNEUMATIC ISOLATION VALVES - (DOCR 84-29R1, 85-21) 08/23/85 321 O PROPOSED CHANGES FOR TECHNICAL SPECIFICATION - ADS LOGIC -
DOCR 85-19 08/30/85 366 C EllERGENCY TECHNICAL SPECIFICATION RELIEF REQUEST - RCIC INSTRUMENTATION FOOTNOTE INTERPRETATION - DOCR 85-26 09/13/85 321,366 REQUEST TO REVISE TECifNICAL SPECIFICATIONS - SCRAfl DISCIIARGE VOLUME VENT AND DRAIN VALVE CLOSURE TIME l