Monthly Operating Repts for Dec 1996 for Catawba Nuclear Station
ML20133M838
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 12/31/1996
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20133M802 List:
References
NUDOCS 9701230064
Download: ML20133M838 (10)


Text

.. .. .- - . . . . - .- -. . . - . . - --.-- . ~ . - - - . - . - - -

l OPERATIN6 DATA REPORT l DOCKET NO 50-413 DATE January 15. 1997 OPERATING STATUS COMPLETED BY R.A. Willines

TELEPHONE 704-382-5346
1. Unit Nase: Catawba 1
2. Reporting Period: Ce:eeber 1, 1996-December 31,1996
3. Licensed Thereal Power (Mt): 3411 l '4. Naseplate Rating (6ross MWe): .

!!058 Notes Hlaseplate Rating

5. Design Electrical Rating (Net MWe): 1145' .(Bross Wel calculated as ,
6. Maxieue Dependable Capacity (Bross We):  !!92 1450.000 MVA .90 poner  ;
7. Maxisco Dependable Capacity (Net MWe):  !!29 factor per Page lit,  ;

B. If Changes Occur in Capacity Ratings (! tees Number 3 Through 7) Since Last NURE6-0020.  !

l- Report. Give Reasons l I

, 9. fewer Level To Which Restricted, if Any (Net M e):- i l 10. Reason For Restrictions, If any l  ?

This Month Yr.-to-Date Cueulative

!!. Hours in Reporting Period 744.0 8784.0 100897.0

( 12. Nusber Of Hours Reactor Was Critical 693.4 5940.1 78233.8 i

'13. Reactor Reserve Shutdown Hours - - ' --0-- 1

16. Hours Generator On-Line 650.8 5809.1 76897.8 I
13. !! nit Reserve Shutdown Hours --0-- --0-- --0--

t 16. Gross Thereal Energy Generated (MWH) 2157917 18753202 250703461 I

17. Gross Electrical Energy Generated (W HI 772478 6716595 88619406
18. Net Ele:trical Energy Generated (MWH) 729401 6310277 83355364  :

( 19. Unit Service Factor 87.!, 66.1 76.2  ;

t 20. t! nit Availability Factor 87.5 66.1 76.2

' 21. Unit Capacity Fatter.(Using MDC Net) 86.8 63.6 73.0

22. Ur.it Capacity Factor (Using DER Net) 85.6 62.7 72.2 -
23. Unit Forced Outage Rate 12.5 4.2 7.9
24. Shutdoun Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None .

i

.25. If Shut Denn At End Cf Report Period. Estiested Date of Startups

26. Units In' Test Status (Prior to Cceaercial Operation): Forecast Achieved I

f INITIAL CRITICALITY

, INITIAL ELECTRICITY COMERCIAL OPERATION .

9701230064 970115

~

i l

i PDR ADOCK 05000413 [

R PDR l l

i

[

1 l

\

QPERAil E DATA REPORT I

DOCKET N0 50-413 UNIT Catad a 1 i DATE January 15. 1996 i

COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 -

l

! MONTH teceder 1996 l

l

- fjQ AVERABE DAILY POWER LEVEL gg AVERAGE DAILY PDWER LEVEL l (Me-Net) (We-Net) i

!  !!62 17 1166 f

i 2  !!?2 1B 1165 l L

3 1172 19 1165 4- 1172 20 1165 L- i

! 5- 1130 21 1164 i i

6 23 22 1168 i

7 0 23 . 1171. j 8 0 24  !!68-9' 146 23 1174 l = 10 1093 26 -1174

t. -

!!65  !!73 11 27 I!65 12 28 1170 f

13 1169 29 1166 14 1173 30 1094 '!

. 15 - 1167 31 102 e

i '16 1167 f k' f i

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-413 UNIT NAME Carawua 1 DATE v1/13/yi REPORT MONTH December 1996 COMPLETED BY x. a. n1111ame TELEPHONE (/ue)-auz-nseo __

(1) (2) (3) (4) (5)

R MET-E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 6 96 6 F 78.05 A 1 CB PUMPXX FAILED WELD ON REACTOR COOLANT PUMP "1D" #1 SEAL LEAKOFF LINE 18-P 96 9 F --

A --

CB VALVEX I STIGATE SPURIOUS ACTUATION OF S "1C" POWER OPERATED RELIEF V VE 7 96-12-30 F 15.12 B 1 IA XXXXXX SECONDARY SAFETY PROTECTIVE SYSTEM MAIN STEAM ISOLATION RELAY FAILED DURING SURVEILLANCE TESTING (1) (2) (3) (4)

F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent W Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulato n Restriction 4-Other (Explain) File ( N G-0161)

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain) a

~

~

DOCKET: 50-413 UNIT: Catawba 1 Date: 01/15/97 l

NARRATIVE

SUMMARY

f MONTH: December,1996 i Catawba Unit I began the month of December operating at 100% full power. On 12/05/96 at 2005 the unit j began reducing power to permit inspection of the lower containment in a effort to identify source of  ;

primary leakage of-0.5 gpm. On 12/06/96 at 0500 the unit was taken off-line due to failed weld on reactor coolant pump "lD" #1 seal leak-off line. The unit was placed on-line 12/09/96 at i104. During power  !

escalation, the unit held at 16% power from 1309 to 1444 to investigate a spurious actuation of steam i generator "lC" power operated relief valve. The unit returned to 100% full power on 12/10/96 at 0910 and operated at or near 100% full power until 12/30/96 at 2129 when the unit began reducing power and l was taken off-line at 2332 due to secondary safety protective system main steam isolation relay failed I

, during surveillance testing. On 12/31/96 at 1440 the unit was placed on-line. The unit returned to l approximately 78% full power by 12/31/96 at 2400.

l l l l

l l

Prepared by: R. A. Williams i

Telephone: (704)- 382-5346 i

)

l l

l l

. \

, i MONTHLY REFUELING INFORMATION REOUEST

1. Facility name: Catawba. Unit 1 I
2. Scheduled next refueling shutdown: November 1997

. 3. Scheduled restart following refueling: January 1998 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF f ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 [

THROUGH 6 WILL NO LONGFM BE MAINTAINED IN THIS REPORT.  !

l

4. Will refueling or resumption of operation thereafter require a technical specification change or f

otherlicense amendment?  ;

i Ifyes, what will these be? I If no, has reload design and core configuration been reviewed by Safety Review Committee ,

regarding unreviewed safety questions?

l

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or i performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: L9),

l (b) in the spent fuel pool: 622  !

8. Present licensed fuel pool capacity: L4J11 -  !

Size of requested or planned increase: ._--  !

9. Projected date oflast refueling which can be accommodated by present license capacity:

Scotember 2QQ9 .

i t

DUKE POWER COMPANY DATE: January 15.1997 '

i Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 i 1

I i

l j

r i

l l

l OFERATINS DATA REPORT

! DOCKET ND 50-414 l DATE January 15. 1997 OPEPATING STATUS COMftETED BY R.A. Willians l TELEPHONE 704-382-5346

1. Unit Nase: Catawba 2
2. Reporting Feriod: Deceaber 1,1996-Decesber 31,1996 l
3. Licensed Thersal Power (MWt): 3411 l
4. Naseplate Rating (Stoss MWe): 1305e Notes iNaseplate Rating
5. Design Electrical Rating (Net MWel: 1145 (Bross MWe) calculated as
6. Marisus Dependable Capacity (Stoss NWe): 1192 1450.000 MVA x .90 powr
7. Manisus Dependable Capacity (Net MWe):  !!29 factor per Page lii,
8. If Changes Occur in Capacity Ratings (!tess Number 3 Through 7) Since Last NURE6-0020. ,

Report. Give Reasons; j l

9. Power Level To Which Restricted, if Any (Net MWe):  ;
10. Reason for Restrictions, If anyt '

i This Month Yr.-to-Date Cumulative

!!. Hours In Reporting Period 744.0 8784.0 90913.0

12. Nuster Of Hours Reactor Was Critical 610.2 8202.9 72369.1
13. Reacter Reserve Shutdown Hears - --0-- - 16. Hours Generator On-Line 569.6 8108.5 71246.2
15. Unit Reserve Shutdown Hours --0-- --0-- --0--
16. Bross Thereal Energy Generated (MWH) 1903563 27295538 230712076
17. Srcss Electrical Energy Generated (MWH) 674985 9744266 81848633 -
18. Net Electrical Energy Generated (MWH) 635230 9233635 77145892
19. Unit Service Facter 76.6 92.3 78.4
20. Unit Availability Fatter 76.6 92.3 78.4
21. Unit Capacity Factor (Using MDC Net) 75.6 93.1 75.0
22. Unit Capacity Factor (Using DER Net) 74.6 91.8 74.1
23. Unit Forced Outage Rate 23.4 7.7 8.8
26. Shutdcan Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueline - March 22. 1997 - 40 days

25. If Shut Down At End Of Report Period. Estiaated Date of Startup:
26. Units In Test Status (Prior to Ccasercial Operation): Forecast Achieved i

l INITIAL CRITICALITY j INITIAL ELECTRICITY COMMERCIAt. OPERATION I

_. . _ . _ . _ . _ . . _ . . . _ _ . . _ . _ _ . _ . . . .._,_._m--. _ . . . _ . . .....-.. ~ . _ _ . _ . _ . . _ ,

t

(

r i

OPERAi!N6 DATA REPORT l

DOCKET NO 50-414 i 121T Catamba 2 .

DATE January 15. 1996 COMPLETED BY R.A. Williacs

' TELEPHONE 704-382-5346-MONTH December. 1996 l

QA.}, ' AVERAGE DAILY POWER LEVEL QAl AVERA6E DAILY POWER LEVEL (MWe-Net) (Inle-Neti I

1 1156- 17 0

] '

2- 1166 IB 0 3 1165 19 0 )

4 1165 20 0 5 1163 21 0 l 6 1156 22 - 308 7 1155 23 1137 9 1157 24 1157 9 1156 25 1165'  ;

10 1161 26 1164 11 1157 27 1163 12 1155 28  !!61 l 13 1160 29 1156 14 920 30 1156 15 0 31 1148

16 0 i

I

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-414 UNIT NAME CATAWi$A Z DATE ul/1d/w/

REPORT MONTH December 1996 COMPLETED BY x. A. williams j TELEPHONE ( / us ) .s ez -d.se d

] (1) (2) (3) (4) (5)

R MET-4 E HOD 4'

T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE I

3 96-12-14 F 174.37 A 1 CF PUMPXX RESIDUAL HEAT REMOVAL PUMP OPERABILITY CONCERNS DUE TO LEAKAGE

, ON UNSEATED CHECK VALVE 2

9-P 96-12-22 F --

A --

HB XXXXXX HOLD AT 15% POWER PENDING MAIN

FEEDWATER NOZZLE SWAP 1

4 10-P 96-12-22 S --

B --

HA TURBIN MAIN TURBINE STOP VALVE MOVEMENT TEST t

(1) (2) (3) (4)

F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent W Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER

D-Regulatory Restriction , ,

4-Other (Explain) File (NUREG-0161))

E-@erator Training & License Examination .

F-Administrative (5)

, Exhibit I - Same Source G-Operator H-O her Error (Explain) (Explain)

J a

i

_ _ _ _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ v

_ m ._- . . _ _ _ _ _ _ _

I DOCKET: 50-414 ,

J UNIT: Catawba 2 Date: 01/15/97 )

NARRATIVE

SUMMARY

MONTH: December,1996  :

Catawba Unit 2 began the month of December operating at 100% full power. "Ihe unit operated at or near 100% full power until 12/14/96 at 1350, when the unit began decreasing power and was taken off-line at {

2347 due to residual heat removal pump operability concems due to leakage on unseated check valves. The unit was placed on-line 12/22/96 at 0608. During power escalation, the unit held at 15% power from 0630 i to 1205 pending main feedwater nozzle swap. The unit held at 52% power from 1530 to 1622 due to main turbine stop valve movement test. The unit returned to 100% full power on 12/23/% at 0720, and operated at or near 100% full power the remainder of the month.

Prepared by: R. A. Williams Telephone: (704)- 382-5346

_ . . ~ _ - - . - ~ . . . - . - - - . . . ... . .- - .- . . - - - . - ~ . - . . - . . . . - . - . - ..--

d t

i ,

l l

MONTHLY REFUELING INFORMATION REOUEST I

l

1. Facility name: Catawba. Unit 2 .l

'2. Scheduled next refueling shutdown: March 1997 l~ ,

3. Scheduled restart following refueling: May 1997 i THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.

l

6. Important licensing considerations (new or difTerent design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).  ;

l l 7. Number of Fuct assemblies (a) 9 in the core: J93 (b) in the spent fuel pool: J.24

8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: -_
9. Projected date oflast refueling which can be accommodated by present license capacity:

Scotember 20jlj, J

' DUKE POWER COMPANY DATE: January 15.1997  ;

Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 ,

I l

.-