Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20135D775 + (07:19:10, 12 December 2024)
- ML20135D773 + (07:19:10, 12 December 2024)
- ML20135D772 + (07:19:11, 12 December 2024)
- ML20135D771 + (07:19:12, 12 December 2024)
- IR 05000458/1985034 + (07:19:13, 12 December 2024)
- ML20135D769 + (07:19:13, 12 December 2024)
- IR 05000720/2008016 + (07:19:14, 12 December 2024)
- ML20135D766 + (07:19:15, 12 December 2024)
- ML20135D758 + (07:19:16, 12 December 2024)
- ST-HL-AE-5597, Annual Personnel Exposure Rept + (07:19:16, 12 December 2024)
- ML20135D756 + (07:19:17, 12 December 2024)
- ML20135D754 + (07:19:18, 12 December 2024)
- ML20135D753 + (07:19:19, 12 December 2024)
- 05000302/LER-1985-010, :on 850808,grab Samples Not Taken Upon Entry Into Mode 4.Caused by Personnel Error.Scheduling Procedures Will Be Changed to Improve Tracking of Action Statements + (07:19:21, 12 December 2024)
- ML20135D751 + (07:19:22, 12 December 2024)
- IR 05000285/1996015 + (07:19:23, 12 December 2024)
- ML20135D749 + (07:19:24, 12 December 2024)
- IR 05000483/1996012 + (07:19:26, 12 December 2024)
- ML20135D742 + (07:19:27, 12 December 2024)
- ML20135D734 + (07:19:28, 12 December 2024)
- ML20135D739 + (07:19:28, 12 December 2024)
- ML20135D733 + (07:19:29, 12 December 2024)
- ML20135D731 + (07:19:29, 12 December 2024)
- ML20135D730 + (07:19:30, 12 December 2024)
- ML20135D728 + (07:19:31, 12 December 2024)
- ML20135D723 + (07:19:32, 12 December 2024)
- ML20135D714 + (07:19:33, 12 December 2024)
- ML20135D715 + (07:19:33, 12 December 2024)
- PNO-III-96-072, on 961203 & 06,total of Approx 48,000 Ci Co-60 Shipped by Chem-Nuclear,Inc from Advanced Medical Sys to Barnwell,Sc for Disposal.For Entire Project,Total Mrem Was Approx 3,200 Millirems + (07:19:34, 12 December 2024)
- ML20135D709 + (07:19:35, 12 December 2024)
- ML20135D705 + (07:19:36, 12 December 2024)
- ML20135D703 + (07:19:37, 12 December 2024)
- ML20135D702 + (07:19:38, 12 December 2024)
- ML20135D701 + (07:19:39, 12 December 2024)
- 05000370/LER-1985-018, :on 850624,reactor Tripped Due to Steam Generator 2C Low Level.Caused by Solenoid Valve Failure. Valve & Piping Replaced.Pipe Hangers Inspected.Rupture Restraint Modified.Welds Will Be Replaced + (07:19:42, 12 December 2024)
- ML20135D694 + (07:19:43, 12 December 2024)
- ML20135D692 + (07:19:44, 12 December 2024)
- ML20135D691 + (07:19:45, 12 December 2024)
- ML20135D689 + (07:19:46, 12 December 2024)
- ML20135D685 + (07:19:46, 12 December 2024)
- ML20135D683 + (07:19:47, 12 December 2024)
- ML20135D682 + (07:19:48, 12 December 2024)
- ML20135D678 + (07:19:49, 12 December 2024)
- 05000423/LER-1996-044-01, :on 961108,qualification of Containment Sys Noted Following Design Basis Accident.Determined That Fwa Sys Was Not Rated at Containment Design Temp of 280 Degrees. Design Review of Fwa Sys Will Be Performed Prior to Entry + (07:19:50, 12 December 2024)
- ML20135D676 + (07:19:52, 12 December 2024)
- ML20135D671 + (07:19:53, 12 December 2024)
- ML20135D669 + (07:19:54, 12 December 2024)
- 05000423/LER-1996-044, Forwards LER 96-044-00,documenting Condition That Was Determined at Millstone Unit 3,on 961108.Commitments,encl + (07:19:55, 12 December 2024)
- ML20135D661 + (07:19:55, 12 December 2024)
- PNO-I-96-087, on 961206,reactor Was Manually Scramed Due to EHC Oil Leak at Turbine Control Valve 2.Licensee Implemented One Wk Maint Outage to Repair EHC Pressure Switch & Several Other Balance of Plant & Drywell Items + (07:19:56, 12 December 2024)
- ML20135D658 + (07:19:57, 12 December 2024)