ML20135D733

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-285/96-15 on 961111-22.No Violations Noted
ML20135D733
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/06/1996
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Tira Patterson
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20135D735 List:
References
NUDOCS 9612100113
Download: ML20135D733 (4)


See also: IR 05000285/1996015

Text

~ ~ ~ . . . ~ , ~ - ,. - - ~ . . ., ~ -.. ~. - ... -----.,n . - .. .~ .-- .-

.

4

], . #" "' G t UNITED sT AVES

O,I

>

.A . t NUCLEAR REGULATORY COMMISSION

$ REGloN IV

S ?* ' E 611 RYAN PLAZA DRIVE, SUITE 400

$

9.....[

*#

ARLINGTON, TEXAS 760118064

'

i DEC - 61996

l

"

T. L. Patterson, Division Manager l

. Nuclear Operations

i Omaha Public Power District

,

'

Fort Calhoun Station FC-2-4 Adm. ,

P.O. Box 399, Hwy. 75 - North of Fort Calhoun l

Fort Calhoun, Nebraska 68023-0399

l

.

SUBJECT: NRC INSPECTION REPORT 50-285/96-15

-

Dear Mr. Patterson:

1

'

An NRC inspection was conducted November 11-22,1996, at your Fort Calhoun Station

reactor facility. The enclosed report presents the scope and results of tnat inspection.

!

The purpose of this inspection was primarily to evaluate effectiveness of the licensed

,

operator requalification program. The inspection used the annual licensed operator

! requalification examinations and extended control observations to assess licensed operator

i performance. The inspection also evaluated your operations training staff in the

development, administration, and evaluation of the biennial requalification examination.

Overall, we observed good licensed operator performance with regard to communication,
command and control, annunciator response, procedure usage, and self checking. Your

I operations training staff developed, administered, and evaluated the requalification ~

3

examinations professionally and accurately.

!

'

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosure will be placed in the NRC Public Document Room.

i

Should you have any questions concerning this inspection, we will be pleased to discuss

them with you.

Sincerely, j

% Sws l

,

g4-Mhomas P. Gwynn, Director

Division of Reactor Safety

, l

! Docket No.: 50-285 l

! License No.: DPR-40 i

! l

'

Enclosure:

NRC Inspection Report

'

50-285/96-15 ,

9612100113 961206

PDR ADOCK 05000285

G PDR

. _ ._

_ _ _ _ __

.

.

l Omaha Public Power District -2-

!

!

l cc w/ enclosure:

( Perry D. Robinson, Esq.

l Winston & Strawn

1400 L. Street, N.W.

Washington, D.C. 20005-3502

Jack Jensen, Chairman

Washington County Board of Supervisors

Blair, Nebraska 68008

I Cheryl Rogers, LLRW Program Manager

Environmental Protection Section

Nebraska Department of Health

301 Centennial Mall, South

P.O. Box 95007

Lincoln, Nebraska 68509-5007

James W. Chase, Manager

Fort Calhoun Station

P.O. Box 399

Fort Calhoun, Nebraska 68023

Fort Calhoun Station FC-2-4 Adm.

Joe Gasper, Training Manager

P.O. Box 399, Hwy 75-North of FC

Fort Calhoun, NE 68023-0399

i

i

i

!

f

.

,; .- .,

{.i .

Omaha Public Power District -3- i

i

E-Mail report to D. Nelson (DJN)  !

E-Mail report to NR8 veq racking System (IPAS) '

gbcc.to DMB (d%).- -a

bec distrib. by RIV: i

L. J. Callan DRS-PSB i

DRP Director MIS System

)

Branch Chief (DRP/B) RIV File j

Project Engineer (DRP/B) Leah Tremper (OC/LFDCB, MS: TWFN 9E10) )

Branch Chief (DRP/TSS)  !

Resident inspector

S. Richards (NRR/HOLB)

L. Hurley (DRS/OLB/OLA)

DOCUIAENT NAME: R:\_FC\FC615RP.REL To receive copy of document, indicate in box: "C" = Cepv

without erclosures "E" = Copy wah enclosures "N" = No copy

C RE:OPSA, C RE: OPS g ,C AC: OPS 4, D:DRP j

RIV:Rii:OB/f-

RLant:grC HBundtg- TMeaddw(p TOMet%rgom JEDyer F4 4

'

12h196 12/ $196 12/*196 / 12/ f/96' 12///96 }

D:DRS ,,j

TPGwynn M7%

" "

-

12/J /96

OFFICIAL RECORD COPY

100001

.- . _ _ _ . __ ._ _ _ . . . _ . __ . ..

.

.

Omaha Public Power District -3-

l

l E-Mail report to D. Nelson (DJN)

l

E-Mail report to NRR Event Tracking System (IPAS)

l

bec to DMB (IEO1)

bec distrib. by RIV:

L. J. Callan DRS-PSB

DRP Director MIS System

Branch Chief (DRP/B) RIV File

l Project Engineer (DRP/B) Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

l Branch Chief (DRP/TSS)

l Resident lospector

l S. Richards (NRR/HOLB)

l L. Hurley (DRS/OLB/OLA)

l

l

DOCUMENT NAME: R:\_FC\FC615RP.REL To receive copy of document, indicate in box: "c" = copy

without enclosures "E" = Copy wth enclosures "N" = No copy

RIV:RE:OB/fslC RE: OPS 4 C RE: opp A ,p AC: OPS /, . D:DRP

l RLant7fr# HBundp//s TMeaddw;(p TOMcK6rjojc JEDyer $4 4

'

126/96 12/s796 12/#96 / 12/f/96' 12///96

'

D:DRS , g

TPGwynn g7%

" V

12/J./96

OFFICIAL RECORD COPY

_