Text
&
k" " h' %
,
j
UNITED STATES
"
f..
,y
NUCLEAR REGULATORY COMMISSION
5_
i
REGloN IV
p
611 RYAN PL AZA DRIVE, SulTE 400
,%,
d
AR LINGToN, T E X AS 76011 8064
- s.,*
6 7;
Donald F. Schnell, Senior Vice
President - Nuclear
Union Electric Company
P.O. Box 149
St. Louis, Missouri 63166
SUBJECT: NRC INSPECTION REPORT 50-483/96-12 AND NOTICE OF VIOLATION
Dear Mr. Schnell:
An NRC inspection was conducted November 4-8,1996, at your Callaway Plant reactor
f acility. The enclosed report presents the scope and results of that inspection.
Violations related to the failure of some of your radiation protection controls were
identified. A failure to barricade and post a high radiation area, and a failure to identify the
presence of radioactive contamination on items before they were unconditionally released
from the radiological controlled area were identified. These violations are cited in the
enclosed Notice of Violation (Notice) and the circumstances surrounding the violations are
described in detail in the enclosed report. Please note that you are required to respond to
this letter and should follow the instructions specified in the enclosed Notice when
preparing your response. The NRC will use your response, in part, to determine whether
further enforcement action is necessary to ensure compliance with regulatory
requirements.
Aside from these violations, the radiation protection program performed appropriately.
Good response was noted from the radiation protection personnel on November 5,1996,
when an event caused the sudden elevation of dose rates in some areas of the plant. Job
scheduling and sequencing in the reactor building, in preparation for the refueling outage,
were performed well.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
its enclosure (s), and your response will be placed in the NRC Public Document Room
(PDR). To the extent possible, your response should not include any personal privacy,
proprietary, or safeguards information so that it can be placed in the PDR without
redaction.
9612100099 961206
ADOCK 05000483
G
o'
- . w
Union Electric Company -
-2-
Shoi lo you have any questions concerning this inspection, we will be pleased to discuss
them with you.
.
Sincerely,
/c
"* w
c
'
homas P.
yn , Director
i
Division of Reactor Safety
i
Docket No.: 50-483
License No.: NPF-30
Enclosures:
2. NRC Inspection Report
50-483/96-12
cc w/ enclosures:
Professional Nuclear Consulting, Inc.
19041 Raines Drive
Derwood, Maryland 20855
Gerald Charnoff, Esq.
Thomas A. Baxter, Esq.
Shaw, Pittman, Potts & Trc,wbridge
2300 N. Street, N.W.
Washington, D.C. 20037
i
- H. D. Bono, Supervising Engineer
Site Licensing
Union Electric Company
P.O. Box 620
Fulton, Missouri 65251
G. L. Randolph, Vice President
Nuclear Operations
Union Electric Company
P.O. Box 620
Fulton, Missouri 65251
_
-
_ . _ . . _ _
_ . - -
-~
__
_ _..-_ - __.- _ _._ .._._...._ __. . - _ . . _ . _ _ _ _ . . _ _ .
- . . . _
- ,
i
,
IL
4
i
Union Electric Company
-3-
4
J
1
Manager - Electric Department
.
Missouri Public Service Commission
!
301 W. High
P.O. Box 360
$
Jefferson City, Missouri 65102
!
Ronald A. Kucera, Deputy Director
7
Department of Natural Resources
'
i
P.O. Box 176
Jefferson City, Missouri 65102
.
I
Neil S. Carns, President and
'
Chief Executive Officer
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
l
Burlington, Kansas 66839
4
i -
Dan 1. Bolef, President
}
Kay Drey, Representative
l
Board of Directors Coalition
i
for the Environment
{
6267 Delmar Boulevard
University City, Missouri 63130
l
Lee Fritz, Presiding Commissioner
Callaway County Court House
i
10 East Fif th Street
l
Fulton, Missouri 65151
l
Alan C. Passwater, Manager
l
Licensing and Fuels
j
Union Electric Company
P.O. Box 149
i
St. Louis, Missouri 63166
1
i
!
J. V. Laux, Manager
!
Quality Assurance
i
Union Electric Company
I
5
P.O. Box 620
,
Fulton, Missouri 65251
'
a
i
i
,
-
i
.5
1
,
-
-
. . . , .
--.
-
-
.
.
_
. _ _ _ . . . . _ . _ _ . . _ _ . . _ _ . . _ . . _ _ _ . _ _ . _
_ _ _ _ _ _ _ _ _ - . . _ _ .
_
_
, h
!
l.
'
i
!t
i
5
,
j
Union Electric Company
-4-
t
l
f
i
i
l
l
l
E-Mail report to D. Nelson (DJN)
{
l-
E-Mail report to NRR Event Tracking System (IPAS) .
t
g cc; tor:DMINlEU5EPb
b
i
!
bec distrib. by RIV:
1
L. J. Callan
Resident inspector
t
DRP Director
DRS-PSB
i
Branch Chief (C,.tP/B)
MIS System
l
Project Engineer (DRP/B)
RIV File
,
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
i
C. A. Hackney, ORA
!
l
DRS Al 96-G 4/W
l
~
I
i
-
I
.
I
l
'
!
l
l
l
i
4
i
!
,
1
,
l
i
l
.
?
l
1
.
\\
!
fl
DOCUMENT NAME:
To recolve copy of document, Indicate in box: "C" = Copy wthout enclosures "E" = Copy wth enclosures "N" = No copy
J
SPS:PSB
,E
C:PSB
lE
D:DRS
N
D:DRP
N
D:DRS
N
,
,
!'
LTRicketson:cigF)(d' 8,Murray b
TPGwynrg(/)
JEDyer/fy 4
TPGwynn I .
r
l
11M96
71/M96
11/'f96 '
%[9),
171()96
i fl
'
p{-
OFFICIAL RECORD COPY
~
1
100002
.
.
-
. _ . . . _ . . _ _ . - -
l
Union Electric Company
-4-
E-Mail report to D. Nelson (DJN)
E-Mail report to NRR Event Tracking System (IPAS)
bec to DMB (IE06)
bec distrib. by RIV:
L. J. Callan
Resident inspector
DRP Director
DRS-PSB
Branch Chief (DRP/B)
MIS System
Project Engineer (DRP/B)
RIV File
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
C. A. Hackney, ORA
DRS Al 96-G-1W
DOCUMENT NAME:
To receive copy of document, indicate in box: "c" = Copy wthout enclosures
"E" = Copy with enclosures "N" = No copy
SPS:PSB
f E, C:PSB
E
D:DRS
N
D:DRP
N
D:DRS
N
LTRicketson:6 8,Murray h
TPGwynrg(/)
JEDyer/fy 4
TPGwynn l
r
11b/96
/1/M96
11/'f96 '
1-tg[9),
111()96
\\ l'n
'
gV(.
OFFICIAL RECORD COPY
'