Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20135G588 + (06:49:33, 12 December 2024)
- ML20135G586 + (06:49:34, 12 December 2024)
- ML20135G585 + (06:49:35, 12 December 2024)
- ML20135G584 + (06:49:35, 12 December 2024)
- ML20135G583 + (06:49:36, 12 December 2024)
- U-600247, Radiological Environ Monitoring Rept,Preoperational Stage, 1984 + (06:49:37, 12 December 2024)
- ML20135G581 + (06:49:38, 12 December 2024)
- ML20135G579 + (06:49:39, 12 December 2024)
- IR 05000317/1985015 + (06:49:47, 12 December 2024)
- ML20135G577 + (06:49:48, 12 December 2024)
- ML20135G575 + (06:49:49, 12 December 2024)
- ML20135G574 + (06:49:49, 12 December 2024)
- ML20135G572 + (06:49:50, 12 December 2024)
- 05000395/LER-1985-022, :on 850824,reactor Trip Occurred on Steam Generator a lo-lo Level.Caused by Requirement to Maintain Min Values of Feedwater Flow & Temp During Startup.Feedwater & Condensate Sys Evaluation Program Initiated + (06:49:53, 12 December 2024)
- ML20135G566 + (06:49:54, 12 December 2024)
- PY-CEI-NRR-0336, Clarifies & Resolves NRC Concerns Re Design for LOCA-related Hydrodynamic Loads (SER Open Item 9).Draft Acceptance Criteria for Mods to Pool Dynamic Load Design, Info Re Submerged Drag Loads & Proposed Revs to FSAR Encl + (06:49:55, 12 December 2024)
- ML20135G564 + (06:49:55, 12 December 2024)
- PNO-V-85-058, on 850912,unusual Event Declared After Main Turbine Tripped During Load Rejection Test.Low Voltage Tripped Reactor Coolant Pumps.Overcooling RCS Caused Decrease in Safety Injection Setpoint + (06:49:56, 12 December 2024)
- ML20135G560 + (06:49:57, 12 December 2024)
- PNO-V-85-057A, on 850912,turbine Trip/Reactor Trip Occurred Due to Fire in Main Turbine Exciter Encl.Fire Caused by Electrical Arcing Between Generator Exciter Bus Bars Due to Carbon Buildup from Exciter Brushes + (06:49:58, 12 December 2024)
- ML20135G559 + (06:49:58, 12 December 2024)
- ML20135G555 + (06:49:59, 12 December 2024)
- ML20135G556 + (06:49:59, 12 December 2024)
- 05000302/LER-1985-013, :on 850815,unit Experienced Inadvertent Partial Actuation of Emergency Feedwater Initiation & Control Sys. Caused by Unplanned Shutting of Main Steam Valve MSV-159 in Response to Steam Leak on Valve VI + (06:50:01, 12 December 2024)
- ML20135G552 + (06:50:02, 12 December 2024)
- ST-HL-AE-1358, Submits Rept of Progress of Entrainment & Impingement During Cooling Reservoir Filling Operation,Per Fes.Pumping During Second Quarter 1985 Consisted of Sporadic Pumping on 850621, 24,25 & 26.No Data Collected During Limited Pumping + (06:50:03, 12 December 2024)
- ML20135G549 + (06:50:04, 12 December 2024)
- PY-CEI-NRR-0342, Forwards Comments & Clarifications on Fire Protection Portion of Apr 1985 Sser 6 for Incorporation Into Next Sser & Withdraws Deviation Request 14 Re Lack of Detection in Fire Area ICC-638/654 + (06:50:04, 12 December 2024)
- ML20135G541 + (06:50:05, 12 December 2024)
- B11707, Responds to NRC Re Violations Noted in Insp Rept 50-423/85-22.Corrective Actions:All S&W Field QC Radiographic Film Interpreters Reinstructed to Evaluate & Documents Any & All Conditions Noted on Film + (06:50:06, 12 December 2024)
- ML20135G534 + (06:50:10, 12 December 2024)
- PNO-II-85-088, on 850910,reactor Manually Tripped from 100% Power.Caused by Excessive Vibration in Reactor Coolant Pump & Loose Parts Monitor Alarm in Same Cooling Loop.Unit in Cold Shutdown for Investigation of Problem & Repairs + (06:50:11, 12 December 2024)
- B11699, Forwards Integrated Safety Assessment Program,Topic No 1.05, Ventilation Sys Mods & Summaries of Public Safety Impact Model Project Analyses,Per 850731 Request + (06:50:12, 12 December 2024)
- IR 05000309/1985016 + (06:50:14, 12 December 2024)
- B11704, Responds to NRC Re Noncompliance Noted in Insp Repts 50-245/85-16 & 50-336/85-22.Corrective Actions:Flow Meters Returned to Vendor for Calibr.Form IC 2436B-1 Now Reflects Flow Meters Calibr & Date for Recalibr + (06:50:15, 12 December 2024)
- PNO-I-85-066A, on 850911,licensee Implemented Maint/Test Procedure to Identify Cause of 850907 Fire in CRD Power Distribution Panels.Fire Caused by Overload of Rods on Auxiliary Power Supply,Causing Excessive Dc Current + (06:50:15, 12 December 2024)
- ML20135G523 + (06:50:16, 12 December 2024)
- ML20135G521 + (06:50:17, 12 December 2024)
- ML20135G518 + (06:50:18, 12 December 2024)
- ML20135G519 + (06:50:18, 12 December 2024)
- IR 05000277/1985027 + (06:50:20, 12 December 2024)
- ML20135G512 + (06:50:20, 12 December 2024)
- ML20135G510 + (06:50:21, 12 December 2024)
- ML20135G508 + (06:50:22, 12 December 2024)
- ML20135G509 + (06:50:22, 12 December 2024)
- ML20135G505 + (06:50:26, 12 December 2024)
- IR 05000245/1985022 + (06:50:30, 12 December 2024)
- ML20135G498 + (06:50:31, 12 December 2024)
- PNO-II-85-089, on 850911,leak in Excess of Tech Specs Discovered in Reactor Coolant Loop Bypass Valve.Cause Not Stated.Valve Backseated & Leakage Reduced.Evaluation & Repairs Performed + (06:50:31, 12 December 2024)
- ML20135G495 + (06:50:32, 12 December 2024)
- ML20135G493 + (06:50:33, 12 December 2024)
- ML20135G492 + (06:50:33, 12 December 2024)