From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 8509190332
Download: ML20135G514 (2)


Text

. .

SEP 131985 Docket Nos. 50-277 50-278 Philadelphia Electric Company

ATTN: Mr. S. L. Daltroff Vice President Electric Production 2301 Market Street Philadelphia, Pennsylvania 19101 Gentlemen:

Subject: Combined Inspection Report Nos. 50-277/85-27; 50-278/85-25

Your letter dated August 28, 1985, in response to our letter dated July 29,

'

1985 has been reviewed.

Thank you for informing us of the corrective and preventive actions documented in your letter. These actions will be examined during a future inspection of your licensed program.

Your coopei . tion with us is appreciated.

Sincerely, Original si e d W 8 D

Thomas T. Martin, Director Division of Radiation Safet h

and Safeguards

'

cc w/cncl:

R. S. Fleischmann, Station Superintendent John S. Kemper, Vice President, Engineering and Research Troy B. Conner, Jr. , Esquire A. J. Pietrofitta, General Manager, Power Production Engineering, Atlantic Electric Eugene J..Bradley, Esquire, Assistant General Counsel (Without Report)

,

Raymond L. Hovis, Esquire Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania 8509190332 e50913 27 PDR ADOCK O G v,r alAL RECORD COPY RL PB 85-27/25 - 0001.0.0 ; .

09/10/85 1 Il a

-

- o Philadelphia Electric Co. -2-bec w/ encl:

Region I Docket Roon (with concurrences)-

Senivc Oper uun:, Giiice. (w/ W ^

Section Chief, DRP

,

I i / M RI:DRSS -FIjl S RI:DRSS g Bicehouse/KL. fgc ak Bellamy

'

9/ ./85 9/ 0/85 9/\"/85 0FFICIAL RECORD COPY RL PB 85-27/25 - 0002.0.0

^

09/10/85

.

--- s -

-_

  • *

,. .

'

.

. ,

l PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.191C1 swirtos t. oAttnorr **###

ause",'.UEoa August 28, 1985 Docket Nos. 50-277 50-278

- - Inspection Report Nos. 50-277/85-27 50-278/85-25 Mr. Thomas T. Martin, Director Division of Radiation Safety and Safeguards U.S. Nuclear Regulatory Commission ,

Region I 631 Park Avenue King of Prussia, PA 19406

Dear Mr. Martin:

Appendix A to your letter dated July 29, 1985 addresses activities which were identified by Inspection Report No. 50-277/85-27; 50-278/85-25 as possible violations with respect to Peach Bottom Atomic Power Station. Our response, along with -

actions taken, are discussed below.

..

Restatement of Violation:

"10 CFR 71.5 prohibits delivery of licensed material to a carrier for transport unless the licensee complies with applicable regulations of the Department of Transportation-in 49 CFR Parts 170-189."

"49 CFR 173.425(b)(1) requires shipments of low-specific activity materials be packaged in strong, tight packages so that there will be no leakage of radioactive material under conditions normdlly incident to transportation."

'

a

-

" Contrary to the above, on May 30, 1985, a drum containing low specific activity shipped by the licensee was received at Richland, Washington, and was not packaged in a strong, tight package. Specifically, licensee's drum No. S-146-85 was found to have a hole in it. "

This is a Severity Level III violation (Supplement V).

fp Mp.v y ~Q i siff V j

..

-._

. .

.

, .

,

Mr. Thomas August 28, 1985 Page 2 Admission of Alleaed Violation:

'

We agree that a puncture hole was discovered in drum No. S-146-85 at the Richland, Washington, site and that the drum originated at the Peach Bottom Atomic Power Station.

Reason for Alleged Violation:

Following notification, a Peach Bottom representative was sent to Richland, Washington, to investigate and review the details regarding this event with burial site personnel.

Our representative investigated and was informed that the shipment arrived at Richland, Washington, with all internal bracing intact. The puncture was located just above the mid-plane of the drum and was facing forward in the trailer.

A detailed inspection of the subject drum (S-146-85) also showed some deep dents below the lid-ring. We noted that some of the deep dents (which did not puncture the drum)

closely resembled the lid-ring bolting ears that stick out from this type drum in such a way that, if jammed against another drum, could have caused the same type tear or puncture. This damage could have been caused by a severe jar during transportation or other mishandling type problem after the truck left the Peach Bottom site.

Investigation at the Peach Bottom site included inspection of the lifting and handling devices, the capping tool, a review of our loading and integrity inspection procedures, and interviews with the crews involved in the loading operation of this trailer. This investigation disclosed that for this particular shipment, each shipping container was clearly and thoroughly inspected for integrity as well as other requirements such as correct placarding, shipping papers, labeling and radiation measurements. No puncture holes were identified during the inspection and loading operation.

Our exhaustive investigation of this event has not identified a scenario Which could cause the puncture. No evidence has been found Which would indicate that the puncture occurred before the drums were loaded on the trailer.

.

.

.. - . ._ -.

'~ _ _ _ _.

  • *

'

,

., .-

Mr. Thomas August 28, 1985 Page 3 Significance of Violation:

The significance of the puncture hole was minimal because the drum which was punctured contained oils with low specific activity that had been solidified with concrete forming a monolithic free standing block inside the drum. l The drum was used as the casting form for solidification.

The intent of 49 CFR 173.425(b)(1), which requires strong, tight packages, is to avoid leakage during transportation.

,

'

The type of drum which was used as the shipping container met the criteria for integrity and leakage. This type drum has been the standard in the industry for many years and in the past has been used almost exclusively for packaging of hazardous and radioactive waste for transportation. They

l are designed to be tight and strong and have had extensive generic testing of their design in orderThey to meet strict were purposely Department of Transportation criteria.

used by Philadelphia Electric Company because 'of their strength and leak tightness during transportation.

The material in the drum remained monolithic and the contents remained in the drum even though the container integrity was breached, thereby meeting the intent of the regulations for avoidance of, leakage.

Corrective Actions Taken to Avoid Future Noncompliance Immediately after the alleged violation was reported, Philadelphia Electric Company sent Peach Bottom personnel to the burial site in Washington State to investigate the incident. Also, as a precautionary step, a loaded truck ready for shipment from Peach Bottom was unloaded, inspected, and reloaded to verify integrity of the shipment.

! The site personnel responsible for handling radioactive waste were reminded of the importance of thorough inspection of -all shipments for. integrity along with To ensure careful and strict compliance with procedures.

continued emphasis on 'the importance of proper handling, i

' instructions have been issued to the labor support

! contractor to provide instructions to personnel assigned to the loading operations. Further, we increased controls in

this area by revising the truck loading procedure and the  !

procedure which. controls solidification, packaging, and inspection of liquid and materials in preparation for l

shipment . The revision to the' truck loading procedure now includes precautionary statements which will nbt allow theor fork lift operator to use one container to push another, allow the fork lift tongs to touch another container. The responsibility of the QC inspectors has been increased to

. h

-

. .

.

.

Mr. Thomas August 28, 1985 Page 4 ensure that the integrity of the drums is not compromised during the loading of the truck.

Additionally, in order to reduce the likelihood of dents caused by lid-ring bolting ears contacting neighboring drums during the shipment, the truck loading procedures will be revised to orient drums on the truck with the lid-ring bolting ears protruding into the space between adjacent drums. A QC inspection of the loaded truck will check this orientation. This revised procedure will be implemented by September 30, 1985.

Date When Full Compliance Will Be Achieved:

The state of Washington, following informal negotiations and telephone discussions with the Peach Bottom site involving the incident and our site procedures, reinstated Permit #5625 effective June 17, 1985 authorizing Philadelphia Electric Company to use the commercial low-level radioactive waste disposal site at Richland.

Philadelphia Electric recognizes that contiaued authorization to transport and dispose of waste depends on strict adherence to procedures used for compliance to DOT /NRC regulations, Philadelphia Electric intends to maintain such compliance by strict adherence to these procedures, regulations, and inspections.

Philadelphia Electric Company believes that full compliance to regulations has been provided. All corrective action associated with this event will be achieved by September 30, 1985.

Should you have any questions or require additional in formation, please do not hesitate to contact us.

.

Very truly yours,

.

,

. . . -

DPH:vdw cc: Dr. T. E. Murley, Administrator, Region I, USNRC *

,

T. P. Johnson, Resident Site Inspector -