Requests Listed Info Re Vital Area Analysis by 851001 for Regulatory Effectiveness Review,To Evaluate Overall Effectiveness of Safeguards Program & to Determine If Existing Safeguards Yield Adequate Protection
ML20135G509
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 09/13/1985
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hukill H
GENERAL PUBLIC UTILITIES CORP.
References
NUDOCS 8509190327
Download: ML20135G509 (4)


Text

r o .

SEP 131985 Docket No: 50-289 GPU Nuclear Corporation ATTN: Mr. H. D. Hukill Vice President and Director of TMI-1 -

P. O. Box 480 Middletown, Pennsylvania 17057 Gentlemen:

Subject:

Safeguards Regulatory Effectiveness Review at the Three Mile Island Unit 1 Nuclear Power Station The NRC's Office of Nuclear Material Safety and Safeguards (NMSS) is in the process of conducting a Regulatory Effectiveness Review (RER) at operating nuclear power plants. The Three Mile Island Unit 1 Power Station is scheduled for such a review during the week of February 3-7, 1986.

The purposes of the RER are to evaluate the overall effectiveness of the safeguards program and to determine whether existing safeguards regulations yield the level of protection intended by NRC. The RER supports the NRC's quality assurance program for safeguards, as it applies to both the Three Mile Island Unit 1 security systems and the NRC's regulations. The RER will complement but will be independent of the licensing and inspection functions.

Specific details regarding the conduct of the RER, including identification of the team members, will be provided to you at a later date.

So that NMSS can prepare for the RER at the Three Mile Island Unit 1 Nuclear Power Station, you are requested to provide the information identified on the enclosed list directly to Mr. Robert Dube, Chief, Safeguards Evaluation Section, of that office by October 1, 1985. If.you have any questions regarding this request, please contact R. R. Meimig of my staff at (215) 337-5255.

The response directed by this letter is not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation with us in this matter is appreciated.

Sincerely, original signed by:

~

8509190327 850913 PDR ADOCK 05000209 Thomas T. Martin, Director F PDR Division of Radiation Safety and Safeguards En' closure: As stated 0FFICIAL RECORD COPY Q (,

p A

l < -

GPU Nuclear Corporation 2 SEP 131985 cc: (w/ encl)

R. J. Toole, Operations and Maintenance Director, TMI-1 C. W. Smyth, Manager, TMI-1 Licensing R. J. McGoey, Manager, PWR Licensing G. F. Trowbridge, Esquire Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania bec: (w/ encl)

Region I Docket Room (with concurrences)

W. D. Travers, Deputy Program Director, TMI Program Office J. Goldberg, OELD:HQ John Thoma, PM, NRR Section Chief, DRP Robert Dube, NMSS S RI RSS R M.tRSS :DRSS Sm th Ke g .Joyner artin Ol' 9/4/85 9/[/85 9/1/85 0FFICIAL RECORD COPY 9//2,/85 t% ,

- - - - - ,,- , , _ _ . . - ,, _,-.,,--m., , ., , ., . ,.. ,

  • - ' "I e .... .-

. (

' ~ i ENCLOSURE THREE MILE ISLAND - UNIT 1 DRAWING LIST EDR VITAL AREA ANALYSIS 4

1. Equipment Layout Drawings

!

  • Figure 1-2 Reactor and auxiliary buildings - basement floor (FS AR Fig. No. )
  • Figure 1-3 Reactor auxiliary and fuel handling buildings -

ground floor (FSAR Fig. No.) ,

  • Figure 1-4 Reactor auxiliary and fuel handling buildings -

plan view (FSAR Fig. No.)

  • Figure 1-5 Operating floor, reactor and fuel handling buildings (FS AR Fig. No.) '
  • Figure 1-7 Auxiliary and fuel handling buildings Section C-C

. (FSAR Fig. No.) ,

  • Figure 1-8 Auxiliary and fuel handling buildings Sections D-D &

E-E (FSAR Fig. No.)

  • Figure 1-9 Auxiliary building Sections H-H & J-J (FSAR Fig. No.)
  • Figure 1-10 Intermediate building - basement floor (FSAR Fig. No.) ,
  • Figure 1-11 Intermediate building - cezzanine floor (FSAR Fig. No.)
  • Figure 1-12 Control Room Tower (FSAR Fig. No.)
  • Figure 1-15 Intake screen house and pump house (FSAR Fig. No.)

I 2. Piping and Instrument Diagrams C-302-011 Main Steam - Unit #1 C-302-610 Nuclear Services Closed Cycle Cooling Water - Unit 1 C-307-712 Reactor Building Spray - Unit 1 C-302-011 Main Steam C-302-650 Reactor coolant system -

C-302-711 Core flooding ,

C-302-081 Feed water

' ~

C-302-6'O Nuclear services closed cycle cooling water C-302-645- Decay heat closed cycle cooling water C-302-202 River water system C-302-640 Decay heat removal - Unit 1 C-302-661 Make-up & purification l

C-302-660 Make-up & purification i

i

, s . e j . ..

Three Mile Island Drawing List for Vital Area Analysis Page 2

3. Electrical One Line Diagrams 4

E-206-051 Electrical one line diagram - 250/125V DC S4ST E-206-022 Electrical one line and relay diagram 4160 V. Engd.

safeguards switchgear E-206-032 Electrical one line and relay diagram - Engd. safeguards, 4

screen house, reactor building H. & V. 480V switchgear E-206-031 Electrical one line and relay diagram - turbine and service H. & V., turbine, reactor, auxiliary and F.B.H. & V., 480V, switchgear E-206-031 Electrical main one line and relay diagram

4. Miscellaneous Drawings
  • Figure 1 Plot Plan Three Mile Island - Unit 1 (FSAR Figure No.)

!

  • Need equivalent engineering drawings for the FSAR figure numbers lisced above, i

l 1

s i

l e

?

,___~.4 . _ . , _ . _ , _ ,

5