SEP 12 E
Docket / License: 50-317/DPR-53
50-318/DPR-69
Baltimore Gas and Electric Company
ATTN:
Mr. A. E. Lundvall, Jr.
Vice President, Supply
P. O. Box 1475
Baltimore, Maryland 21203
Gentlemen:
Subject:
NRC Inspection Nos. 50-317/85-15. 50-318/85-13
This transmits the June 18 - August 15, 1985, resident inspection findings by
Messrs. T. Foley and D. Trimble at the Calvert Cliffs Nuclear Power Plant, Lusby,
Maryland. Those findings were based on observation of activities, interviews,
independent measurements, and document reviews, and have been discussed with
Mr. Russell of your staff.
Within the scope of this inspection, no violations were observed.
This report includes observations of licensee performance in response to occur-
rences which rendered a Main Steam Isolation Valve inoperable and the subsequent
test program which ensued to determine the cause of the valve's inoperability.
Your performance with respect to this issue was in consonance with NRC's philosophy
of determining the " root cause" of equipment failure.
These observations may be
reflected as positive attributes of licensee performance as part of the Systematic
Assessment of Licensee Performance (SALP) process.
Your cooperation with us is appreciated.
Sincerely, DiC21 Signed Byr;
fod
-
'
Edward C. Wenzinger, C ief
Projects Branch No. 3
Division of Reactor Projects
Enclosure: NRC Report 50-317/85-15, 50-318/85-13
(
d/
8509190430 850912
E
ADOCK 05000317
ee
O
sgg
.
.
,
.
Baltimore Gas and Electric Company
2
SEP 121985
cc w/ encl:
R. M. Douglass, Manager, Quality Assurance
L. B. Russell, Plant Superintendent
Thomas Magette, Administrator, Nuclear Evaluations
R. C. L. Olson, Principal Engineer
J. A. Tiernan, Manager, Nuclear Power
R. E. Denton, General Supervisor, Training and Technical Services
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Maryland (2)
bcc w/ encl:
Region I Docket Room (with concurrences)
DRP Section Chief
M. McBride, RI, Pilgrim
D. Jaffe, LPM, NRR
Y
RgRP
RI:DJ
R
P
E!s
oley
er
an in er
8/27/85
sl9lgg
]
'
0F ICIAL RECORD COPY
..
..