ML20135G493

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-245/85-22 & 50-336/85-27 on 850723-0903.No Violation Noted.Effectiveness Review of Controls to Assure NRC Personnel Have Immediate Unfettered Access to Facility Requested
ML20135G493
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 09/12/1985
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20135G494 List:
References
NUDOCS 8509190306
Download: ML20135G493 (2)


See also: IR 05000245/1985022

Text

.

,,

SEP 121985

Docket Nos. 50-245

50-336

Northeast Nuclear Energy Company

ATTN:

Mr. John F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

Post Office Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject:

Inspection 50-245/85-22; 50-336/85-27 (7/23/85 - 9/3/85)

This routine safety inspection was of operational and supporting activities at

Millstone Units 1 and 2.

Particular attention was directed to observation of power

operations.

No violations of NRC requirements were identified and no reply to this letter is

required.

We have noted that the recent relocation of your access administrative facilities

has been accompanied by some delays in the authorization of access of NRC personnel

to the site.

Please review the effectiveness of the controls you have in place

to assure that NRC personnel have immediate unfettered access to the facility.

We will address this matter further during routine inspections and site visits.

Your letter of July 22, 1985 concerning the pressurizer spray valve wiring error

at Millstone Unit 2 has been received and reviewed.

NRC follow-up on this matter

will be accomplished during routine inspections.

Your cooperation with us is appreciated.

Sincerely, ori,;ina Slaced sy

'

- $cM Y

/ ff

'

Edward C. Wenzinger, ChTti

,

  1. C Projects Branch No. 3

3

Division of Reactor Projects

Enclosure:

NRC Region I Report 50-245/85-22; 50-336/85-27

8509190306 850912

PDR

ADOCK 050

5

G

T 7 [ s\\n

i

.

Northeast Nuclear Energy Company

2

SEP 12 7985

l

cc w/ encl:

E.J. Mroczka, Vice President, Nuclear Operations

W.D. Romberg, Station Superintendent

D.0. Nordquist, Manager of Quality Assurance

R.T. Laudanat, Manager, Generation Facilities Licensing

Gerald Garfield, Esqui.re

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bcc w/ encl:

Region I Docket Room (with concurrences)

Director DRS

Director DRSS

DRP Section Chief

M. McBride, RI, Pilgrim Nuclear Station

J. Shea, LPM, NRR

D. Osborne, LPM, NRR

P. Swetland, SRI, Haddam Neck

T. Rebelowski, SRI, Millstone 3

D. M. Johnson, RI

D. Haverkamp, RI

W. Madden, RI (See Detail 9)

@

A

DRP:RI O

DRP:RI

bRF:RI

JSHEDLOSKY

ECMcCABE

CWENZINGER

W89/85

9l9

Q/

'/

%tu

/

OFFICIAL RECORD COPY

J