Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20135J034 + (06:40:12, 12 December 2024)
- ML20135J033 + (06:40:13, 12 December 2024)
- 05000316/LER-1985-019-01, :on 850821,determined That Seismic Qualification of Governors for turbine-driven Auxiliary Feed Pumps Inadequate for Approx 4 Yrs.Cause Not Stated.Governors as Installed Meet Current Seismic Requirements + (06:40:15, 12 December 2024)
- ML20135J031 + (06:40:16, 12 December 2024)
- B11703, Amended Final Potential Significant Deficiency Rept SD-70 Re Failure of nonmotor-operated curtain-type Fire Dampers to Close Under Flow Conditions.Initially Reported on 850116. Damper Closure Springs Being Replaced + (06:40:17, 12 December 2024)
- A05126, Forwards Revised Effluent Release Figures for Effluent & Waste Disposal Rept... for 1982,1983 & 1984,per Hartfield 850807 Request.Dilution Water Vol Revised to Indicate Total Water Vol.Revs Do Not Change Liquid Release Doses + (06:40:17, 12 December 2024)
- ML20135J026 + (06:40:18, 12 December 2024)
- ML20135J027 + (06:40:18, 12 December 2024)
- TXX-4540, Requests Exemption by 851030 from Schedular Requirements for Full Participation in Emergency Preparedness Exercise,Per 10CFR50,App E,Section Iv,Paragraph F.1.State of Tx to FEMA Re Dec 1983 & Nov 1984 Exercises Encl.Fee Paid + (06:40:20, 12 December 2024)
- ML20135J023 + (06:40:21, 12 December 2024)
- ML20135J022 + (06:40:22, 12 December 2024)
- 05000316/LER-1985-018-01, :on 850820,ESF Actuation Occurred.Caused by Opening of Reactor Trip Breakers During Instrumentation Checks.Surveillance Test Procedure Thp 4030 STP.180 Revised + (06:40:23, 12 December 2024)
- ML20135J020 + (06:40:24, 12 December 2024)
- ML20135J017 + (06:40:25, 12 December 2024)
- ML20135J015 + (06:40:26, 12 December 2024)
- 05000302/LER-1985-015, :on 850820,automatic Reactor Trip Occurred Due to Severed Drain Line for Main Turbine High Pressure Crossover Line.Caused by Fatigue Failure of Socket Weld Due to Fabrication Defect.Weld Repaired + (06:40:27, 12 December 2024)
- ML20135J013 + (06:40:31, 12 December 2024)
- ML20135J012 + (06:40:32, 12 December 2024)
- 05000333/LER-1985-023, :on 850905,emergency Diesel Generators a & C Inadvertently Started.Caused by Operator Error.Operators Counseled on Necessity for Completing Procedural Step Before Starting Next Step + (06:40:34, 12 December 2024)
- ML20135J010 + (06:40:35, 12 December 2024)
- 05000304/LER-1985-005-01, :on 850806,discovered Svc Bus Undervoltage Start of Auxiliary Feedwater Pump Not Periodically Tested & Relays Which Start Pumps on lo-lo Steam Generator Level Not Tested for Three Steam Generators + (06:40:37, 12 December 2024)
- ML20135J007 + (06:40:38, 12 December 2024)
- ML20135J004 + (06:40:39, 12 December 2024)
- ML20135J003 + (06:40:40, 12 December 2024)
- 05000395/LER-1985-024, :on 850820 & 24,reactor Trips Occurred from 100% & 10% Power,Respectively.Caused by Low RCS Flow & Conservative Intermediate Range Setpoints.Precautions Added to Maint Procedures + (06:40:41, 12 December 2024)
- ML20135J000 + (06:40:43, 12 December 2024)
- ML20135H995 + (06:40:44, 12 December 2024)
- ML20135H996 + (06:40:44, 12 December 2024)
- L-85-355, Responds to NRC Re Violations Noted in Insp Repts 50-250/85-23 & 50-251/85-23.Corrective Actions:Spent Fuel Pit Piping Surveillance Frequency Increased & Procedures Revised.Requests That NRC Mitigate Increased Civil Penalty + (06:40:45, 12 December 2024)
- ML20135H994 + (06:40:45, 12 December 2024)
- W3P85-2634, Forwards Phase I Heavy Loads Evaluation for Auxiliary Containment Pedestal Crane & Control Environ Drive Mechanism Cooling Ducts.Criteria of NUREG-0612,Section 5.1.1 Satisfied + (06:40:46, 12 December 2024)
- B11619, Application for Amend to License SNM-1950,allowing Storage & Use of Listed Detectors,Sources & Surveillance Capsules at Millstone Unit 3 Site + (06:40:47, 12 December 2024)
- ML20135H990 + (06:40:48, 12 December 2024)
- TXX-4544, Discusses Implementation of Plans to Meet Requirements of Generic Ltr 84-16 Re Qualification & Training of Operators. Experienced Shift Supervisors Will Be Used to Enhance on-shift Experience,Per Sser 6 (NUREG-0797) + (06:40:49, 12 December 2024)
- ML20135H988 + (06:40:50, 12 December 2024)
- ML20135H985 + (06:40:51, 12 December 2024)
- ML20135H986 + (06:40:51, 12 December 2024)
- ML20135H984 + (06:40:52, 12 December 2024)
- ML20135H983 + (06:40:53, 12 December 2024)
- ML20135H982 + (06:40:54, 12 December 2024)
- 05000316/LER-1985-021-01, :on 850822 & 23,discovered That Several Instrumentation Channel Functional Tests Not Performed as Required.Cause Not Stated.Testing Conducted + (06:40:56, 12 December 2024)
- 05000316/LER-1985-020-01, :on 850822,during Surveillance Testing, safety-related Fire Damper Found Inoperable.Cause Not Determined.Damper Repaired,Tested & Returned to Svc on 850823 + (06:40:58, 12 December 2024)
- ML20135H976 + (06:40:59, 12 December 2024)
- ML20135H968 + (06:41:02, 12 December 2024)
- ML20135H962 + (06:41:03, 12 December 2024)
- 05000336/LER-1985-013-01, :on 850822,charging Pump C Removed from Svc Due to Packing Leaks.Caused by High Internal Stresses Causing Cracks to Initiate at Subsurface Inclusions.Pump Replaced + (06:41:04, 12 December 2024)
- ML20135H955 + (06:41:06, 12 December 2024)
- ST-HL-AE-1329, Forwards Amend 51 to FSAR for South Texas Project,Units 1 & 2,incorporating Revised Section 15.6.5 Re double-ended Cold Leg Guillotine Break LOCA Analysis & Revs to Chapter 13 Concerning Organization & Training + (06:41:06, 12 December 2024)
- ML20135H954 + (06:41:07, 12 December 2024)
- ML20135H951 + (06:41:08, 12 December 2024)
- ML20135H949 + (06:41:09, 12 December 2024)