- ML20137F003 + (04:43:14, 12 December 2024)
- ML20137F002 + (04:43:15, 12 December 2024)
- ML20137E998 + (04:43:15, 12 December 2024)
- B11659, Discusses Implementation of Mods Providing Equivalent Level of Protection Required by 10CFR50,App R.Non-outage Mods Implemented.Mods in Control Room Will Be Implemented During Next Refueling Outage for Safety Reasons + (04:47:36, 12 December 2024)
- 05000282/LER-1997-002-01, :on 970219,failed to Submit Relief Requests for Limited ISI Exams.Caused by Misinterpretation of 10CFR50.55a(g)(1).Prepared Procedure Restablishing Process to Identify,Quantify & Document ISI Exams + (04:47:39, 12 December 2024)
- ML20137E988 + (04:47:40, 12 December 2024)
- ML20137E987 + (04:47:41, 12 December 2024)
- PNO-III-85-071A, circuitry Mods to Plant Transformers Completed & Successfully Tested on 850819.Mods Instituted Due to Failure in Switching Mechanism in Auxiliary Main Station Transformer + (04:47:41, 12 December 2024)
- ML20137E983 + (04:47:42, 12 December 2024)
- ML20137E980 + (04:47:43, 12 December 2024)
- 05000251/LER-1985-023-01, :on 850824,discovered That Containment Isolation Valve CV-4-956A Not Tested on Quarterly Cycle,Per Tech Spec 3.3.3.Caused by Failure to Note Previous Testing Problems on Valve Clearance.Valve Tested + (04:47:45, 12 December 2024)
- ML20137E976 + (04:47:48, 12 December 2024)
- ML20137E972 + (04:47:54, 12 December 2024)
- ML20137E969 + (04:47:55, 12 December 2024)
- ML20137E970 + (04:47:55, 12 December 2024)
- ML20137E968 + (04:47:56, 12 December 2024)
- ML20137E967 + (04:47:57, 12 December 2024)
- ML20137E963 + (04:47:58, 12 December 2024)
- 05000362/LER-1985-030-01, :on 851208,fuel Handling Isolation Sys Train B Actuated When Noble Gas Airborne Radiation Monitor 3RE-7823B Spuriously Alarmed.Caused by Radiation Monitor Sensitivity to Random Electrical Noise + (04:48:00, 12 December 2024)
- ML20137E960 + (04:48:01, 12 December 2024)
- ML20137E957 + (04:48:02, 12 December 2024)
- ML20137E954 + (04:48:02, 12 December 2024)
- ML20137E953 + (04:48:03, 12 December 2024)
- ML20137E949 + (04:48:04, 12 December 2024)
- ML20137E947 + (04:48:06, 12 December 2024)
- 05000309/LER-1985-016, :on 851023,reactor Tripped Due to Low Steam Generator Level.Caused by Regulating Feedwater by Nonstd Method & Operator Error.Disc Seating Adjusted & Stem Locking Device Tightened + (04:48:08, 12 December 2024)
- ML20137E943 + (04:48:09, 12 December 2024)
- 05000237/LER-1985-044-04, :on 851213,discovered Power Cable to Diesel Generator 2/3 Cooling Water Pump Damaged & Generator 2 Tripped When Brought Offline.Caused by Use of Conduit as Support When Climbing Ladder + (04:48:11, 12 December 2024)
- ML20137E941 + (04:48:12, 12 December 2024)
- ML20137E938 + (04:48:14, 12 December 2024)
- IR 05000415/2006027 + (04:48:15, 12 December 2024)
- ML20137E933 + (04:48:16, 12 December 2024)
- ML20137E932 + (04:48:18, 12 December 2024)
- ML20137E923 + (04:48:19, 12 December 2024)
- ML20137E931 + (04:48:19, 12 December 2024)
- B11653, Submits Addl Info Re Methodology Used in Calculations of Drywell to Wetwell Vacuum Breaker Valve Dynamics in Response to Generic Ltr 83-08,per NRC Request.Further Calculations Found Vacuum Breakers Acceptable as Built + (04:48:26, 12 December 2024)
- 3F0397-15, Revises Completion Date for EOPs at Crystal River Unit 3 from 970331 to 970829.Completion of EOP Enhancements Required to Support Operating Crew Training + (04:48:27, 12 December 2024)
- ML20137E916 + (04:48:27, 12 December 2024)
- A03410, Suppls Response to IE Bulletin 83-07 Re Apparently Fraudulent Products Sold by Ray Miller,Inc.Six Fittings Acceptable Per ANSI B16.3 & B16.5 Stds.Access to Remaining Three Fittings Dangerous But Fittings Determined Acceptable + (04:48:28, 12 December 2024)
- ML20137E906 + (04:48:29, 12 December 2024)
- B11655, Advises That Proposed Change to Axial Offsite Limits Will Be Requested for Cycle 14 to Allow 3-loop Operation at All Times During Cycle.Vendor Evaluation Indicated 4-loop Axial Offset Limits Not Always Conservative + (04:48:29, 12 December 2024)
- 05000295/LER-1997-004-04, :on 970221,identified Failure to Start Pump in Required Time & Led to Declaring 1C Containment Spray Inoperable.Caused by Clogged Fuel Filter & Defective components.1C Containment Spray Pump Fuel Drained & Flushed + (04:48:31, 12 December 2024)
- ML20137E901 + (04:48:33, 12 December 2024)
- ML20137E893 + (04:48:34, 12 December 2024)
- ML20137E890 + (04:48:35, 12 December 2024)
- ML20137E888 + (04:48:36, 12 December 2024)
- ML20137E887 + (04:48:37, 12 December 2024)
- ML20137E882 + (04:48:41, 12 December 2024)
- 05000254/LER-1985-020-07, :on 851210,auto-start Signal Sent to Standby Gas Treatment Sys Due to Bypass of Fuel Pool Radiation Monitor 1A & Downscale Spike of Monitor 1B.Caused by Electronic Interference.Cable Rerouted + (04:48:45, 12 December 2024)
- ML20137E875 + (04:48:46, 12 December 2024)
- ML20137E873 + (04:48:47, 12 December 2024)