ML20137E887
| ML20137E887 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 12/18/1985 |
| From: | Grimsley D NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Ryan M AFFILIATION NOT ASSIGNED |
| Shared Package | |
| ML20136F031 | List: |
| References | |
| FOIA-85-663 NUDOCS 8601170344 | |
| Download: ML20137E887 (3) | |
Text
,
7 bib-og, o,
UNITED STATES 8
o NUCLEAR REGULATORY COMMISSION 3
- j WASHINGTON, D. C. 20555
%,,,,,+
OEC 18 Gl!
Ms. Margaret L. Ryan, Chief Editor Inside NRC 1120 Vermont Avenue, NW, Suite 1200 IN RESPONSE REFER Washington, DC 20005 TO F01A-85-663
Dear Ms. Ryan:
This is the final response to your letter dated September 27, 1985, in which you requested, pursuant to the Freedom of Information Act (FOIA), all record.s
, generated by the NRC and Florida Power & Light Company in any meetings held during the past year regarding development of " integrated living schedules" for Turkey Point 3 and 4.
A copy of the document listed on the enclosed Appendix B is already available in the NRC Public Document Room (PDR) located at 1717 H Street, NW, Washington, DC 20555.
Copies of the 8 documents listed on the enclosed Appendix C are being placed in the NRC POR. The documents will be filed in PDR folder F0!A-85-663 under your name.
Sincerely,
?%o Y se/a2 Donnie H. Grimsley, Director Division of Rules and Records Office of Administration
Enclosures:
As stated p% 11[ g 851218 RYANB5 g pm t
...;,,.,,o-4 ~. s
?
Re:
F01A-85-663-APPENDIX.B i
1.
07/24/84 Letter to H. -L. Thompson, ~ Jr., from J. W. Williams, FP&L response to NRC re: completion of Enclosure 2 to Generic Letter 85-07,. Implementation of Integrated. Schedules-for Plant Modifications - ANO 8506280114 - PDR - ADOCK.-
50/250 P.
1
}-
4 t
s 1
" ~
.g.
e 9
s D
f I
a
,v."
V.-
g
_ 7 Re:
F01A-85-663-APPENDIX C 1.
06/18/84 Memo to S. A. Varga from D. G. Mcdonald; Forthcoming Meeting with FP&L re:
(1 page) grated scheduling for Turkey Point Units inte 3 and 4.
2.
06/18/84 Memo to NRR Sr. Mgt. from D. G. Mcdonald; Daily Highlight -
Florida. Power and Light Co.
(1 page)-
3.
07/02/84 Summary by D. G. Mcdonald nf Meeting' Held on June.22,1984, to discuss integrated living schedules.
(3 pages) 4.
06/27/85 Memo to S. Varga from D. G. Mcdonald; Forthcoming) Meeting,
w/FP&L re:
integrated living schedules. (1 page 5.
08/13/85 Note to F. J. Miraglia from J. A. Zwolinski; FPL Integrated Living Schedule Conference.
(1 page) 6.
08/29/85 Letter to H. L. Thompson from J. W. Williams; NRC Participation in Integrated Living Schedule Meeting.
(2 page)-
7.
10/08/85 Summary by D. G. Mcdonald of Meeting. Held on 7/25/85 to discuss Integrated Living Schedules. '(8 pages) 8.
Undated Draft Notification of Agenda of FPL. industry ' meeting on the integrated living schedule.
(3 pages) i G
1 5
m.
J Suste 1200
...x.
- c.. :..s n-r,, n..
,s,,
1120 Ver mont Ave. NW
,,ulvtston oJ ;9.es & A o C o a c.S W a *,h i n g t o n.
D.C.
20005 G--1Ce o - a d ~ t n 1, t A t 19 "
2'/ 'Se O t. I cr8S i.d.
Nuc ea<
R.,cu,enory Onern 3 $31 on W4-f62oc?96, D.C.
2 2.t;53'4 l
D9a- =. cei too.
I 4; n q,p o tog "n.p9com (*
- I r.
ormq!;on ACt, I f d o eje r t tnat you 9IVe me alI C OC J""k*5
- ? 9 ^ 9 ^ 4 t 9 0 Oy \\NC an'
- I O"Id4 D otve e D L.lont CO.
In ti e d1SCUSSionS l
I
""P C cuated the ** e s t y94" 41mse at ceveloOlng integrateo
living Schedules 4.y e= **.;nyqy 49 t n e - ? c,* q
~4
"~ y.* 0 C um? n t $ Sft O 'J l d inCIuce meetinQ minutes,
.q
- 2. <. 9 r a.3 <-. <. 3 a..g.g g g c= g g j.y e q *iqie at qeedcuarter $ Qo in an NRC r'eo100 or at a
'J t 1 I 1 t V** ? C C U U 1 t '2
"'*-1*""'. 45 t'e I I C5 OPQ00?4I5 and CQunterOP000SGIS fOr the T C ' ? ? 'J ' f f.
1 1
I ^ 9 0 J 9 s *. toet Y O *J 'r S t v e tne M 0 f' m 4I Ye0 Since I GM afi GCCredited member Of t*4 7'*991.
I
'9?v
- 0 " T 9. f' c to V99P f*eSOOn5e and thank VOU for Your assistance.
31 C 9 *"f v,
i r
OF fMFOffeiAT90N
/
A ( REQUEST i
~s~
.;-le- -c ue-g_fg_( g3
+t
+,sn I^?109
- N. 4.. C.
r I-1 i
t b
l l
h
=
f
.l
- P,
,, ~
g Atf M-4 V w.
L
[r new 'o,,
i UNITED STATES 8
. NUCLEAR REGULATORY COMMISSION o
7, t
WASMNGTON, D. C. 20665
%*****/
June 18, 1984 Docket No. 50-250 and 50-251 MEMORANDUM FOR:
Steven A. Varga, CH ef Operating Reactors oranch #1 Division of Licensing FROM:
Daniel G. Mcdonald, Jr., Project Manager Operating Reactors Branch #1 Div.ision of Licensing
SUBJECT:
FORTHCOMING MEETING'WITH FLORIDA POWER AND LIGHT _" ~
~
COMPANY REAGARDING INTEGRATED SCHEDULING FOR TURKEY P0 INT UNITS 3 AND 4 DATE & TIME:
Friday, June 22, 1984 9:00 a.m.
LOCATION:
P-422 Phillips Building Bethesda, MD PURPOSE:
To discuss considerations and methodoligies for prioritizing, integrating and developing schedules for new and existing requirements.
PARTICIPANTS:
NRC:
S. Varga, D. Mcdonald,-D. Vassallo and'J. Hannon FP&L: J. Burford, et. al.
?=
Daniel G. Mcdonald, Jr., Project Manager Operating Reactors Branch #1 Division of Licensing 9
.v.
.