ML20137E887

From kanterella
Jump to navigation Jump to search
Final Response to 850927 FOIA Request for All Records Generated by NRC or Util in Any Meetings During Past Yr Re Development of Integrated Living Schedules.Forwards App C Documents.Apps B & C Documents Also Available in PDR
ML20137E887
Person / Time
Site: Turkey Point  
Issue date: 12/18/1985
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Ryan M
AFFILIATION NOT ASSIGNED
Shared Package
ML20136F031 List:
References
FOIA-85-663 NUDOCS 8601170344
Download: ML20137E887 (3)


Text

,

7 bib-og, o,

UNITED STATES 8

o NUCLEAR REGULATORY COMMISSION 3

j WASHINGTON, D. C. 20555

%,,,,,+

OEC 18 Gl!

Ms. Margaret L. Ryan, Chief Editor Inside NRC 1120 Vermont Avenue, NW, Suite 1200 IN RESPONSE REFER Washington, DC 20005 TO F01A-85-663

Dear Ms. Ryan:

This is the final response to your letter dated September 27, 1985, in which you requested, pursuant to the Freedom of Information Act (FOIA), all record.s

, generated by the NRC and Florida Power & Light Company in any meetings held during the past year regarding development of " integrated living schedules" for Turkey Point 3 and 4.

A copy of the document listed on the enclosed Appendix B is already available in the NRC Public Document Room (PDR) located at 1717 H Street, NW, Washington, DC 20555.

Copies of the 8 documents listed on the enclosed Appendix C are being placed in the NRC POR. The documents will be filed in PDR folder F0!A-85-663 under your name.

Sincerely,

?%o Y se/a2 Donnie H. Grimsley, Director Division of Rules and Records Office of Administration

Enclosures:

As stated p% 11[ g 851218 RYANB5 g pm t

...;,,.,,o-4 ~. s

?

Re:

F01A-85-663-APPENDIX.B i

1.

07/24/84 Letter to H. -L. Thompson, ~ Jr., from J. W. Williams, FP&L response to NRC re: completion of Enclosure 2 to Generic Letter 85-07,. Implementation of Integrated. Schedules-for Plant Modifications - ANO 8506280114 - PDR - ADOCK.-

50/250 P.

1

}-

4 t

s 1

" ~

.g.

e 9

s D

f I

a

,v."

V.-

g

_ 7 Re:

F01A-85-663-APPENDIX C 1.

06/18/84 Memo to S. A. Varga from D. G. Mcdonald; Forthcoming Meeting with FP&L re:

(1 page) grated scheduling for Turkey Point Units inte 3 and 4.

2.

06/18/84 Memo to NRR Sr. Mgt. from D. G. Mcdonald; Daily Highlight -

Florida. Power and Light Co.

(1 page)-

3.

07/02/84 Summary by D. G. Mcdonald nf Meeting' Held on June.22,1984, to discuss integrated living schedules.

(3 pages) 4.

06/27/85 Memo to S. Varga from D. G. Mcdonald; Forthcoming) Meeting,

w/FP&L re:

integrated living schedules. (1 page 5.

08/13/85 Note to F. J. Miraglia from J. A. Zwolinski; FPL Integrated Living Schedule Conference.

(1 page) 6.

08/29/85 Letter to H. L. Thompson from J. W. Williams; NRC Participation in Integrated Living Schedule Meeting.

(2 page)-

7.

10/08/85 Summary by D. G. Mcdonald of Meeting. Held on 7/25/85 to discuss Integrated Living Schedules. '(8 pages) 8.

Undated Draft Notification of Agenda of FPL. industry ' meeting on the integrated living schedule.

(3 pages) i G

1 5

m.

J Suste 1200

...x.

c.. :..s n-r,, n..

,s,,

1120 Ver mont Ave. NW

,,ulvtston oJ ;9.es & A o C o a c.S W a *,h i n g t o n.

D.C.

20005 G--1Ce o - a d ~ t n 1, t A t 19 "

2'/ 'Se O t. I cr8S i.d.

Nuc ea<

R.,cu,enory Onern 3 $31 on W4-f62oc?96, D.C.

2 2.t;53'4 l

D9a- =. cei too.

I 4; n q,p o tog "n.p9com (*

  • I r.

ormq!;on ACt, I f d o eje r t tnat you 9IVe me alI C OC J""k*5

  • ? 9 ^ 9 ^ 4 t 9 0 Oy \\NC an'
  1. I O"Id4 D otve e D L.lont CO.

In ti e d1SCUSSionS l

I

""P C cuated the ** e s t y94" 41mse at ceveloOlng integrateo

living Schedules 4.y e= **.;nyqy 49 t n e - ? c,* q

~4

"~ y.* 0 C um? n t $ Sft O 'J l d inCIuce meetinQ minutes,

.q

  • 2. <. 9 r a.3 <-. <. 3 a..g.g g g c= g g j.y e q *iqie at qeedcuarter $ Qo in an NRC r'eo100 or at a

'J t 1 I 1 t V** ? C C U U 1 t '2

"'*-1*""'. 45 t'e I I C5 OPQ00?4I5 and CQunterOP000SGIS fOr the T C ' ? ? 'J ' f f.

1 1

I ^ 9 0 J 9 s *. toet Y O *J 'r S t v e tne M 0 f' m 4I Ye0 Since I GM afi GCCredited member Of t*4 7'*991.

I

'9?v

  1. 0 " T 9. f' c to V99P f*eSOOn5e and thank VOU for Your assistance.

31 C 9 *"f v,

i r

OF fMFOffeiAT90N

/

A ( REQUEST i

~s~

.;-le- -c ue-g_fg_( g3

+t

+,sn I^?109

  • N. 4.. C.

r I-1 i

t b

l l

h

=

f

.l

  • P,

,, ~

g Atf M-4 V w.

L

[r new 'o,,

i UNITED STATES 8

. NUCLEAR REGULATORY COMMISSION o

7, t

WASMNGTON, D. C. 20665

%*****/

June 18, 1984 Docket No. 50-250 and 50-251 MEMORANDUM FOR:

Steven A. Varga, CH ef Operating Reactors oranch #1 Division of Licensing FROM:

Daniel G. Mcdonald, Jr., Project Manager Operating Reactors Branch #1 Div.ision of Licensing

SUBJECT:

FORTHCOMING MEETING'WITH FLORIDA POWER AND LIGHT _" ~

~

COMPANY REAGARDING INTEGRATED SCHEDULING FOR TURKEY P0 INT UNITS 3 AND 4 DATE & TIME:

Friday, June 22, 1984 9:00 a.m.

LOCATION:

P-422 Phillips Building Bethesda, MD PURPOSE:

To discuss considerations and methodoligies for prioritizing, integrating and developing schedules for new and existing requirements.

PARTICIPANTS:

NRC:

S. Varga, D. Mcdonald,-D. Vassallo and'J. Hannon FP&L: J. Burford, et. al.

?=

Daniel G. Mcdonald, Jr., Project Manager Operating Reactors Branch #1 Division of Licensing 9

.v.

.