ML20137E901
| ML20137E901 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 01/09/1986 |
| From: | Muller D Office of Nuclear Reactor Regulation |
| To: | City of Dalton, GA, Georgia Power Co, Municipal Electric Authority of Georgia, Oglethorpe Power Corp |
| Shared Package | |
| ML20137E904 | List: |
| References | |
| NPF-05-A-060, TAC 57643 NUDOCS 8601170347 | |
| Download: ML20137E901 (11) | |
Text
-
"o UNITED STATES
~,,
[
g NUCLEAR REGULATORY COMMISSION g
t WASHINGTON. D. C. 20555
- %...../
GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON, GEORGIA DOCKET NO. 50-366 EDWIN I. HATCH NUCLEAR PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 60 License No. NPF-5 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Georgia Power Company, et al.,
(the licensee) dated May 9, 1985 as supplemented August 30, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and-(ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to'the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No.-NPF-5 is hereby i
amended to read as follows:
i l
g)g P
~
l
. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 60, are
. hereby incorporated in the license.. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION
/ f 4C Daniel R. Muller, Director BWR Project Directorate #2 Division of BWR Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance: January 9, 1986 i
b i
l l
a i
t
ATTACHMENT TO LICENSE AMENDMENT NO. 60 FACILITY OPERATING LICENSE NO. NPF-5 DOCKET NO. 50-366 Replace the following pages of the Appendix "A" Technical Specifications with the attached pages. The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.
The corresponding overleaf pages are also provided to maintain document completeness.
Remove Insert 3/4 8-18 3/4 8-18 3/4 8-20 3/4 8-20 3/4 8-21 3/4 8-21 3/4 8-22 3/4 8-22 3/4 8-23 3/4 8-23 9
,I
~., ~
_%__.~_.____
.. _.~. _. _- _ _ _..
... _. ~. _ - -. _ _....__...
= = -
(,.
~ :
~.
ELECTRICAL POWER SYSTEMS A.C. CIRCUITS INSIDE PRIMARY ~ CONTAlf94ENT LIMITING CONDITIONS ~FOR OPERATION 3.8.2.5 The following A.C. circuits inside primary containment shall be i
de-energized *:
a.
Circuit Numbers 2, 4, 6, 8,.10, 12, 14, 40 and 42 in panel 2T51-S003, b.
Circuit Numbers 2, 4, 6, 8,10,12, 40 and 42 in panel 2T51-
- S004, I
c.
Circuit Numbers 26 and 32 in panel 2R25-S105, and d.
Compartment 1EL on MCC 2R24-S014.
I APPLICABILITY: CONDITIONS 1, 2 and 3.
i ACTION:
With any of the above required circuits energized, trip the associated circuit breaker (s) in the specified panel within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
SURVEILLANCE REQUIREMENTS 4.8.2.5 Each of the above required A.C. circuits shall be determined to be de-energized at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying that the associated circuit breakers in the specified panels are in the tripped condition.
l.
\\.
l
- Except during entry into the drywell.
t HATCH - UNIT 2 3/4 8-17
... j - __.. _..
4 EIJCrRICAL PNER SYSTEMS PRIMARY CNTAINEN? PENETIRTIN ONItcrOR OVEICURPEM PPOffCPIW DEVICPS LI!IrrIm CCfDITIN FOR CPEFATICN 3.8.2.6 All primary contairr:ent penetration conductor overcurrent pro-tective devices shown in Table 3.8.2.6-1 shall be OPEPAILE.
4 APP!lCARTT. TTY: CCt31TICNS 1, 2 and 3.
AcrIm:
With me ce more of the primary contairmen* penetration corductor over-current protective devices shown in Table 3.8.. 6-1 inoperable; a.
De-energir.e the circuit (s) by tripping the associated circuit breaker (s) within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and the provisions of rpecification 3.0.4 are not applicable, or 3
I b.
Be in at least HOT SHUPD0tti within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in CID hTrDIN within the folicwing 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
l SURWTTIMCE REQUIPDTNFS 4.8.2.6.1 All primary containment penetration conductor. overcurrent pro-tective devices shown in Table 3.8.2.6-1 shall be derenstrated CPEPABLE:
a.
At least once per 19 conths:
l l
1.
Per at least crie 4 KV reactor recirculation purp circuit, su& that both recirculation pump circuits are demonstrated OPEBRILE at least once per 36 months, by performance of; (a) : A CHNGU!L CALIBRATICN of the associated ~ protective relays, and (b) An integrated system functional test' whi d includes simlated autcentic actuation of the system and i
verifying that and relay and associated circuit' l
. breakers and control circuits function as designed.
l 2.
~ Pbr sn1 M case circuit breakers, by performance of a functional test of at least one circuit breaker of each type,.
l
- such that all circuit breakers of _ each type - are demoistrated '
CPERNLE at least once per N x 18 months, where ' N is the number of circuit breakers of each. type. 'the - functional test specified by' l-i shall-consist of injecting a current input ~ as l
NEMA ~ AE!2-1980 to the circuit breaker; and verifying -that the circuit breaker functions as designed.
Should any circuit breaker. fail to function as' designed, all other circuit breakers of that type shall be tested.
19 ant - tw1T 2 I
3/4 8-18 Amendment I:o. 60 s
l y
p r
,.,.._,.._ ~. _. _....
,.o
. n n.
.r..----_
/
i ELECTitICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) b.
At least once per 60 months by subjecting each circuit breaker to an tuspection and preventive maintenance in accordance with procedures prepared in conjunction with its manufacturer's recommendations.
4.8.2.6.2 Circuit breakers associated with inoperable overcurrent pro-tective devices shall be verifted to be tripped at least once per 7 days.
s e
e 9
J i
e I
4 E
e a
C e 6 I
l e
e w
=
6 h
3/4 8-19 HATCH - UNIT 2~
_ t I
6
_f___.,
TABLE 3.8.2.6-1 PRIMMN CCNTAIMENT PENErlRTIOT CCNDUCTOR O,TJCURRENT PROTECTIVE EVICES DWICE FU1BER SYSTEN/CO@CNENT AND IDCATIOtI*
PCMTED a.
Type 1:
1.
4KV CKr. BKR.
10 SEP A DRIVE tDrOR 2R22-S001, FR.5 2B31-S001A 2.
4KV CKr. EKR.
PG SEP A PG P forOR 2R22-5008, FR.2 2B31-<D01A 3.
tG SEP B DRIVE PEOR 2R22-S002, FR.2 2B31 -9001B 4.
4KV CKr. BFK.
!G SEP B PtW MarOP 2R22-5009, FR.2 2B31-C001B b.
Type 2:
1.
600 VIC, !CB, T.M.
DFWELI, COCLIb1G LNIT 2R24-S012, Coter. 2IL 2T47-B009B 2.
600 VAC, FCB, T.M.
DFWEIL CCXLDU INIT 2R24-S012, CO Pr. 2DR 2T47-B009B 3.
600 VIC, !CB, T.M..
DRYWFIL COCLDU LNIT 2R24-S012, COPP. 3EL 2T47-B008B 4.
600 VAC, !CD, T.M.
DFWEIL COCLING UNIT 2R24-5012, COMPT. 3FR 2T47-B008B 5.
600 VAC, ICB, T.M.
LWWEIL MYMG LEIT 2R24-SOll, Cater.1DL 2T47-EDOBA 6.
600 VAC, FCB, T.M.
DFT*'EIL COCLDE INIT 2R24-90ll, CO Fr. 1DR 2T47-B008A 7.
600 VAC, ICB, T.M.
DRDE[L C0 CLING INIT 2R24-S0ll, CO Fr. 20AR 2T47-B009A 8.
600 VAC, SCB, T.M.
DRDEIL C0(LDU INIT 2R24-S0ll, COFr. 20D 2T47-B009A
- M.C.B. - mi% case circuit breaker.
M.O. - magnetic only T.M..- thermal magnetic turca - tmIT 2
[3/48-20 Amendment No. 60
.f
=,
L
-__;l
[
-- - = - - - -
-e: -
}.
~
TAILE 3.8.2.6-1 (Continued)
PRIMPRf CCNTADMNr PENEFIRTICE C21DUCTOR OVEPCURPFNr PPorECTIVE DFXICES DEVICE tu!BER SYSTEN/CONONENT AND IOCATION*
PCHEPED c.
Type 3:
1.
600 VAC, FCB, T.H.
PH:IIC. Pili) MOTOR HEATER 2R24-E014, CC Wr. 5E 2B31-0001B 2.
600 VAC, PCB, T.M.
REPCIOR PECIPC. Plf4' MOTOR 2R24-SO13, COPPr. SB HEATER 2B31-C001A d.
Type 4:
1.
120 VAC, FCB, T.M.
CApirs BHEB05bOl AND 2R25-S102, CKr.10 BHEB00F02 2.
120 VAC, FCB, T.fi.
CFTS, ICE 700tol A11D 2R25-SIOl, CKr.10
.BGE708t02 e.
Type 5:
1.
600 VAC, FCB, M.O.
DmHELL EQUIP. DR. SUMP 2R24-S014, CCN T. 2A DISCH. MOV 2Gil-EOl8 2.
600 VAC, fCB, !!.O.
DMHELL EDUIP. DFAIN SUMP 2R24-S014, C@ Fr. 6C RECIFC. MOV 2Gil-E015 3.
600 VAC, FCB, M.O.
FCIC SJRLIFE II:P/&PD 2R24-S012B, COFT 4A -
600 VAC, FCB, M.O.
PHR HEAD SPPAY ISGATICN 2R24-S0ll, Cowr. 9A POV. 2 Ell-E022 y
5.
600 VAC, FCB, M.O.
IIPCI STEAM LINE INBOARD 2R24-S011A, CCNT. 4A ISOfATION MOV. 2E41-FOO2 6.
600 VAC, PCB, M.O.
RHCU INBQhRD ISCKATION 2R24-9011, CON T. 14C POV. 2G31-FOOL t
7.
600 VACi ICB. M.O.
MAIN STEAM LDE DFAIN 2R24-90ll, COMPr. ISB MOV. 2B21-EOl6
- M.C.B. - molded case circuit breaker
~
M.O. - magnetic only.
T.M. - thermal magnetic 1000I - UNrr 2 3/4 8-21 Amendment No. fp, 60 s
l TAK E 3.8.2.6-1 (Continued)-
PRIMAIY CCNTAIPNENT PDETRATICN CONDUC'IOR CVEFCUPJUNT PICTECEIVE DEVICES DEVICE NtNBER SYSPDt/CCt@CNENT Al?D IOCNTION*
POWEFFD c.
Type 6:
1.
600 VAC, }CB, M.O.
IOOP 'A' PG@ SUCTION 2R24-S018A, CCHPr. 2A MOV 2B31-F023A 2.
600 VAC, FCB, M.O.
IOCU ' A' PGP DISCH.-
2R24-S018A, 00FPr. 2B MOV 2B31-F031A 3.
600 VAC, FCB, M.O.
IOCP 'B' PGP SUCTICN 2R24-S018B, COMPT. 3A MOV 2B31-E023B 4.
600 VIC, FCB, M.O.
I/G 'B' PGP DISCH.
2R24-S018B, CCNPT. 3B MOV 2B31-E031B 5.
600 VAC, FCB, H.O.
DRDEII. FOUIP. DIRIN 2R24-9014, CatPr.1B PG@ B 2Gil-0006B 6.
600 VAC, ICB, M.O.
DRYhTLL EIDOR DPAIN SGP 2R24-5014, CO?r. 7D PG@ 'B' 2Gil-C001B 7.
600 VAC, BCB, M.O.
DRYWEII EIDOR DPAIN SGP j
2R24-3013, CCtPr. 4A Puf 1A 2Gil-C001A 8.
600 VAC, PCB, M.O.
' DE'YNEIL FDUIP. DERIN SG@
2R24-S013, CCrFr. 43
- PWF A 2Gil-0006A 9.
600 VAC, FCB, M.O.
DRDEIL C0 CLING IRIIT 2R24-S012, CObPr. 18B 2T47-B007B
- 10. 600 VAC, PCB, M.O.
DRfWEIL COCLItG UNIT 2R24-S012, CO Fr. 19A 2T47-C001B
~
l
- 11. 600 VAC, FCB, M.O.
IER SHUPD0hN COCLI!U 2R24-50ll, Cater. 6C ISO. POV 2 Ell-EOO9
- 12. 600 VAC, ICB, M.O.
DRDEIL COCIJ15 INIT l
2R24-S0ll, Cater.18A 2T47-B007A
- 13. 600 VAC, }CB, M.O.
DRDECL CCXLING RETUPN 2R24-S0ll, 00tfT.18C AIR FAN 2T47-CD01A.
i
- M.C.B. - molded case circuit breaker M.O. - magnetic only I
T.M.' - thermal magnetic
,/
l roucs - UNrr 2 3/48-22 Amendment No. #5, 60 4
a
t TABLE 3.8.2.6-1 (Cbntinued)
PRIMME CCNTADNENr PDETFATION CXNDUCTOR OVEICUPSEhT PPOTECFIVE DEVICES DEVICE NLEBER SYSPD4/CCPPO4ENT AND IOCATICE*
PCMERED c.
Type 7:
1.
208 VAC, FCB, M.O.
DFYWILL QG2iICAL afP PUtP 2F24-5013, CCFPr. llD 2Gil-<101 -
2.
208 VAC, PCB, M.O.
DRYWILL RETUPN AIR FAN 2R24-5012, COtFr. 23C 2r47-C002B 3.
208 VAC, f CB, M.O.
DRYWELL COCLING IETUPN 2H24-90ll, COffr. 22C AIR FAN 2T47-0002A
- M.C.B. - molded case circuit breaker.
M.O. - magnetic only T.M. - thermal magnetic f
t l
=
i l
HATOI - UNIT 2 3/4 8-23 Amendment No. 46, 60 b
l
_ -- w w m
ELECTRICAL-POWER SYSTEMS 3/4.8.2 ONSITE POWER DISTRIBUTION SYSTEMS
.l' ELECTRIC PONER t10NITORING FOR REACTOR PROTECTION SYSTEM LIMITING CONDITION FOR OPERATION 3.'8.2.7 The power monitoring system forl a RPS MG set or the Alternate Source shall be OPERABLE if in service.
APPLICABILITY:
At all times.
9 ACTION:
'f With the power monitoring system for a -RPS MG set or the Alternate Source inoperable, restore the inoperable power monitoring system to 0PERA8LE status within 30 minutes or remove the RPS MG set or Alternate Source associated with the inoperable power monitoring system from service.
>s j
One channel of a power monitoring system may be inoperable, as necessary
- (
for test or maintenance, not to exceed 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> per month.
. l SURVEILLANCE REOUIREMENTS I
4.8.2.7 The above specified RPS power monitoring system instrumentation shall f
be determined OPERABLE:
a.
At least once per 6 months by performing a FUNCTIONAL TEST;
- i and L
b.
At least once per operating cycle by demonstrating the OPERABILITY of over-voltage, under-voltage and under-frequency protective
.l instrumentation by performance of a CHANNEL CALIBRATION including simulated automatic actuation of the protective relays, tripping I
logic and output circuit breakers and verifying the following l
setpoints.
1.
Over-voltage 5,132 VAC, l
2.
Under-voltage 1108 VAC, with time delay relay set to zero*,
and 3.
Under-frequency 1 57 Hz.
- Pending NRC approval of different value.
N.-
HATCH - UNIT 2 3/4 8-24 Amendment No. 23 N-J i
s.
l.
xe
.s..e.