Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137F156 + (04:42:20, 12 December 2024)
- B16358, Forwards Addl Info on Selected Items of Work Previously Performed by Util,Correction to Slide Presentation & Resumes for Contractor Selection for ICAVP + (04:42:21, 12 December 2024)
- ML20137F148 + (04:42:22, 12 December 2024)
- ST-HL-AE-5602, Provides Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves + (04:42:22, 12 December 2024)
- ML20137F144 + (04:42:23, 12 December 2024)
- ML20137F142 + (04:42:24, 12 December 2024)
- ML20137F139 + (04:42:24, 12 December 2024)
- ML20137F138 + (04:42:25, 12 December 2024)
- PNO-II-97-019, on 970327,portable Filtration & Demineralization Unit from Chem-Nuclear Sys,Inc Missing Valve.Unknown How or Where Valve Dislodged.Nrc Region I & EPA Contacted + (04:42:26, 12 December 2024)
- ML20137F132 + (04:42:27, 12 December 2024)
- IR 05000621/2009024 + (04:42:28, 12 December 2024)
- ML20137F126 + (04:42:29, 12 December 2024)
- ML20137F130 + (04:42:29, 12 December 2024)
- ST-HL-AE-1563, Requests Approval of Graded Radiological Emergency Exercise Scheduled to Begin in Feb 1987.Detailed Planning Schedule, Including Emergency Preparedness Appraisal in Fall 1986, Will Be Updated If Date Approved + (04:42:30, 12 December 2024)
- ML20137F124 + (04:42:31, 12 December 2024)
- ML20137F119 + (04:42:32, 12 December 2024)
- U-600234, Submits Quarterly Update Re Const Schedule.Critical Path Schedule Analysis Indicates Limiting Sys Schedule for Leak Detection Sys,About 52 Days Behind.Scheduled Fuel Load Date Continues to Be 860103 + (04:42:33, 12 December 2024)
- ML20137F115 + (04:42:34, 12 December 2024)
- PY-CEI-NRR-0307, Forwards Addl Info Re Reg Guide 1.118 & Performance of Surveillance Testing,Per 850705 Request.Proposed Change to FSAR Table 1.8-1 Also Encl + (04:42:35, 12 December 2024)
- NG-97-0499, Informs,As Required by 10CFR50.74,of Change in Operator License Status.G Kaegi Terminated Employment W/Ies Utils & Therefore No Longer Requires License + (04:42:36, 12 December 2024)
- ML20137F104 + (04:42:37, 12 December 2024)
- 3F0397-10, Responds to NRC Re Violations Noted in Insp Rept 50-302/96-10.Corrective Actions:Effect of Lowering Fuel Assembly Upon Another Evaluated + (04:42:38, 12 December 2024)
- ML20137F097 + (04:42:39, 12 December 2024)
- ML20137F095 + (04:42:40, 12 December 2024)
- ML20137F092 + (04:42:41, 12 December 2024)
- ML20137F088 + (04:42:42, 12 December 2024)
- 05000317/LER-1997-002, :on 970220,misread TS Requirements Resulted in Inadequate Test.Caused by Lack of Strict Adherence to Wording of Plants TS Requirements.Edgs 1B,2A & 2B Were Successfully Tested & Returned to Svc + (04:42:46, 12 December 2024)
- ML20137F084 + (04:42:47, 12 December 2024)
- ST-HL-AE-5596, Rescinds Submitted Temporary Addendum Four to Physical Security Plan,Rev 7A.Temporary Addendum Four Described Measures Taken During Const Activities Associated with Intrusion Detection Sys Upgrade Project + (04:42:48, 12 December 2024)
- IR 05000313/1985021 + (04:42:51, 12 December 2024)
- ML20137F073 + (04:42:52, 12 December 2024)
- ML20137F068 + (04:42:53, 12 December 2024)
- ML20137F066 + (04:42:54, 12 December 2024)
- A05050, Submits Licensed Operator Requalification Program Status Rept.Summary of 850628 Requalification Training Meeting Rept 50-213/85-01 Was Provided to Document Commitments Listed + (04:42:55, 12 December 2024)
- 05000271/LER-1996-026, :on 961007,fire Barrier Penetration Seal Improperly Installed in 1979.Caused by Inadequate Design Implementation & Insp.Ts Compensatory Fire Watch in Place to Support Seal Repair Work + (04:42:59, 12 December 2024)
- ML20137F053 + (04:43:00, 12 December 2024)
- ML20137F052 + (04:43:01, 12 December 2024)
- PNO-IV-85-043, on 850820,util Achieved Criticality.Plant Had Been Shut Down Since 840910 to Replace Reactor Recirculation Piping.Licensee Has 19-day Power Ascension & Testing Period Before Resuming Commercial Operation + (04:43:02, 12 December 2024)
- ML20137F049 + (04:43:02, 12 December 2024)
- LR-N970188, Submits Suppl to Response to NRC Re Violations Noted in Insp Repts 50-354/96-03 & 50-354/96-06 Cas:Design & Licensing Basis Overview Training Course Being Developed & Will Be Available to Engineering Support Personnel + (04:43:03, 12 December 2024)
- ML20137F033 + (04:43:05, 12 December 2024)
- ML20137F031 + (04:43:06, 12 December 2024)
- ML20137F030 + (04:43:07, 12 December 2024)
- ML20137F028 + (04:43:08, 12 December 2024)
- ML20137F025 + (04:43:09, 12 December 2024)
- ML20137F016 + (04:43:11, 12 December 2024)
- B11643, Forwards Info Re Control Room Halon Fire Suppression Sys,In Response to 850715 Request.Total Flooding of Halon Sys Will Be Installed in Facility Control Room During Next Refueling Outage,Per 10CFR50.48 Schedule + (04:43:12, 12 December 2024)
- ML20137F003 + (04:43:14, 12 December 2024)
- ML20137F002 + (04:43:15, 12 December 2024)
- ML20137E998 + (04:43:15, 12 December 2024)
- B11659, Discusses Implementation of Mods Providing Equivalent Level of Protection Required by 10CFR50,App R.Non-outage Mods Implemented.Mods in Control Room Will Be Implemented During Next Refueling Outage for Safety Reasons + (04:47:36, 12 December 2024)