ML20137F132
| ML20137F132 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 08/21/1985 |
| From: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Pilant J NEBRASKA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20137F135 | List: |
| References | |
| NUDOCS 8508260156 | |
| Download: ML20137F132 (2) | |
See also: IR 05000298/1985019
Text
_
..
.
..
.
h
2
.
,
.'
gG 211386
>-
l
In Reply Refer To:
l
Docket:
50-298/85-19
!
a
<
!
Nebraska Public Power District
[
ATTN:
J. M. Pflant, Manager, Technical
f
Staff-Nuclear Power Group
P. O. Box 499
l -
Columbus, Nebraska 68601
Gentlemen:
j '
This refers to the inspection conducted by Mr. J. R. Boardman of this office
i
during the period June 10-14, 1985, of activities authorized by NRC Operating
License DPR-46 for Cooper Nuclear Station, and to the discussion of our findings
with Mr. P. Thomason and other members of your staff at the conclusion of the
inspection.
Areas examined during the inspection included document control and quality
assurance and quality control administrative program.
Within these areas, the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the inspector.
These
findings are documented in the' enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Your response should be based on the specifics contained in the Notice of
Violation enclosed with this letter.
One unresolved item is identified in paragraph 2 of the enclosed inspection
report.
The response directed by this letter and the accompanying Notice is not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
RSB/0S
C:EPS N RPB/A
RPB
jp Jg/IS/85
1/IG/85
$/l /85
y&/85
oardman
JBair
JPJa o
EHJohnson
[ i
RSB/ES h
RElreldd
0508260156 abos21
ADOCK oSO h9g
i
g //5'/85
PDH
e o
I
l
1
_
_ _ _ _ - - _ - - - -
_
_
.
-2-
Should you have any questions concerning this inspection, we will be pleased
'
to discuss them with you.
Sincerely,
orter' F--d By
E. li.
- .cn
-
E. H. Johnson, Chief
Reactor Project Branch
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
S0-298/85-19
cc w/ enclosures:
Paul V. Thomason, Division Manager
of Nuclear Operations
Cooper Nuclear Station
-P. O. Box 98
Brownville, Nebraska 68321
Kansas Radiation Control. Program Director
Nebraska Radiation Control Program Director
i-
bcc to DM8 (IE01)
bcc distrib. by RIV:
i'
- RPB
.
R..P. Denise, DRSP
- Resident Inspector
R. D. Martin, RA
- Section Chief (RPB/A)
- D. Weiss, LFMB (AR-2015
l
, EP&RPB
- J.
Boardman, RSB/0S
~
.
- MIS System
'*RIV File
- RSTS Operator
1
,
- w/766
,