Forwards Insp Rept 50-298/85-19 on 850610-14 & Notice of Violation
ML20137F132
Person / Time
Site: Cooper 
Issue date: 08/21/1985
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20137F135 List:
References
NUDOCS 8508260156
Download: ML20137F132 (2)


See also: IR 05000298/1985019

Text

_

..

.

..

.

h

2

.

,

.'

gG 211386

>-

l

In Reply Refer To:

l

Docket:

50-298/85-19

!

a

<

!

Nebraska Public Power District

[

ATTN:

J. M. Pflant, Manager, Technical

f

Staff-Nuclear Power Group

P. O. Box 499

l -

Columbus, Nebraska 68601

Gentlemen:

j '

This refers to the inspection conducted by Mr. J. R. Boardman of this office

i

during the period June 10-14, 1985, of activities authorized by NRC Operating

License DPR-46 for Cooper Nuclear Station, and to the discussion of our findings

with Mr. P. Thomason and other members of your staff at the conclusion of the

inspection.

Areas examined during the inspection included document control and quality

assurance and quality control administrative program.

Within these areas, the

inspection consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the inspector.

These

findings are documented in the' enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements.

Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Your response should be based on the specifics contained in the Notice of

Violation enclosed with this letter.

One unresolved item is identified in paragraph 2 of the enclosed inspection

report.

The response directed by this letter and the accompanying Notice is not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

RSB/0S

C:EPS N RPB/A

RPB

jp Jg/IS/85

1/IG/85

$/l /85

y&/85

oardman

JBair

JPJa o

EHJohnson

[ i

RSB/ES h

RElreldd

0508260156 abos21

ADOCK oSO h9g

i

g //5'/85

PDH

e o

I

l

1

_

_ _ _ _ - - _ - - - -

_

_

.

-2-

Should you have any questions concerning this inspection, we will be pleased

'

to discuss them with you.

Sincerely,

orter' F--d By

E. li.

.cn

-

E. H. Johnson, Chief

Reactor Project Branch

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

S0-298/85-19

cc w/ enclosures:

Paul V. Thomason, Division Manager

of Nuclear Operations

Cooper Nuclear Station

-P. O. Box 98

Brownville, Nebraska 68321

Kansas Radiation Control. Program Director

Nebraska Radiation Control Program Director

i-

bcc to DM8 (IE01)

bcc distrib. by RIV:

i'

  • RPB

.

R..P. Denise, DRSP

  • Resident Inspector

R. D. Martin, RA

  • Section Chief (RPB/A)
  • D. Weiss, LFMB (AR-2015

l

, EP&RPB

  • J.

Boardman, RSB/0S

~

.

  • MIS System

'*RIV File

  • RSTS Operator

1

,

  • w/766

,