ML20137F052
| ML20137F052 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 08/20/1985 |
| From: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Jeffery Griffin ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20137F056 | List: |
| References | |
| NUDOCS 8508260135 | |
| Download: ML20137F052 (2) | |
See also: IR 05000313/1985021
Text
AUG 2 01985
.
In Reply Refer To:
Dockets:
50-313/85-21
50-368/85-22
Arkansas Power & Light Company
ATTN:
John M. Griffin,
Senior Vice President -
Energy Supply
P. O. Box 551
Little Rock, Arkansas 72203
' Gentlemen:
This refers to the inspection conducted by Messrs. W. D. Johnson
and P. H. Harrell of this office during the period July 1-31, 1985, of
activities authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas
Nuclear One, Units 1 and 2, and to the discussion of our findings with
Mr. J. M. Levine and other members of your staff at the conclusion of the
inspection.
Areas examined during the inspection included operational safety verification,
maintenance, surveillance, followup on previously identified items,
followup on licensee event reports, and postaccident sampling system
operability.
Within these areas, the inspection consisted of selective
examination of procedures and representative records, interviews with
personnel, and observations by the inspectors.
The-findings are documented in
the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
RIV:SR
-
RP8/p
RPB
fp$//6/85on;ap g HaFrel
LEMaVtin
EHJohnson
i
0Joh
f//4/85
///6/85
Q/ /85
%
h
8508260135 850020
ADOCK 05000313
G
'\\
-
.
_.
- _.
.
_
_.
.
_ . - - _ . _
_
. . .
_
.
Arkansas Power & Light Company
-2-
Should you have any questions concerning this inspection, we will be pleased
to' discuss them with you.
Sincerely,
,
Oridnd C'31?d BY
E. H. Johnscn
E. H. Johnson, Chief
Reactor Project Branch
Enclosures:
1.
Appendix A - Notice of Violation
-2.
Appendix B - NRC Inspection Report
50-313/85-21
50-368/85-22
cc w/ enclosures: J. M. Levine, General Manager
Arkansas Nuclear One
P. O. Box 608
Russellville, Arkansas 72801
Arkansas Radiation Control Program Director
b'cc to DMB (IE01)
Dcc distrib. by RIV:
- RPB
- Resident Inspector
R. D. Martin, RA
- EP&RPB
- Section Chief (RPB/B)
- D. Weiss, LFh8 (AR-2015)
- RIV File
R. Denise,'DRS&P
- MIS SYSTEM
- RSTS Operator
- w/766
.
h
- -
l'
[
'
l
l-
!
f
>
l
,
- . - . , ,
, , - . -
, _ , .
.-. - - - - - - - . _
.
. .
.
--
-
- - _ - . - , - - - . . - . _ .
-
-