Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137V924 + (01:54:39, 12 December 2024)
- 3F1085-01, Revises Commitment Re Qualifications & Duties of Shift Technical Advisor (Sta).Sta Training Will Be Performed Per NUREG-0737,Item I.A.1.1 & Tech Specs,As Specified within Ltr.Refs Applicable to STA Issue Listed + (01:54:40, 12 December 2024)
- ML20137V920 + (01:54:41, 12 December 2024)
- ML20137V915 + (01:54:42, 12 December 2024)
- ML20137V916 + (01:54:42, 12 December 2024)
- ML20137V914 + (01:54:43, 12 December 2024)
- ML20137V912 + (01:54:44, 12 December 2024)
- ML20137V908 + (01:54:45, 12 December 2024)
- ML20137V907 + (01:54:45, 12 December 2024)
- ML20137V906 + (01:54:46, 12 December 2024)
- ML20137V904 + (01:54:46, 12 December 2024)
- ML20137V903 + (01:54:47, 12 December 2024)
- ML20137V897 + (01:54:48, 12 December 2024)
- IR 05000333/1985022 + (01:54:55, 12 December 2024)
- IR 05000263/1997004 + (01:54:57, 12 December 2024)
- ML20137V888 + (01:54:57, 12 December 2024)
- ML20137V877 + (01:54:59, 12 December 2024)
- ML20137V878 + (01:54:59, 12 December 2024)
- ML20137V873 + (01:55:00, 12 December 2024)
- U-600354, Submits Justification for Using nonfire-tested Sealant Matl in Conduit Penetrations Through Drywell Wall.Twelve Penetrations Identified Where Specified Sealant Cannot Be Installed Due to High Viscosity & Amount of Cable Fill + (01:55:01, 12 December 2024)
- ML20137V866 + (01:55:02, 12 December 2024)
- ML20137V869 + (01:55:02, 12 December 2024)
- ML20137V865 + (01:55:03, 12 December 2024)
- RBG-21852, Informs That Rept Describing Methods Used to Establish GE-supplied Trip Setpoints & Allowable Values for Protection Sys Channels Assumed to Operate in FSAR Transient & Accident Analyses Will Be Provided Prior to Startup + (01:55:03, 12 December 2024)
- ML20137V862 + (01:55:04, 12 December 2024)
- ML20137V859 + (01:55:05, 12 December 2024)
- ML20137V854 + (01:55:06, 12 December 2024)
- ML20137V852 + (01:55:07, 12 December 2024)
- U-600275, Forwards marked-up Proof & Review Tech Specs,Per 850904 Request,Indicating Typos & Corrections to Info Submitted in 840928 & s + (01:55:08, 12 December 2024)
- ML20137V840 + (01:55:14, 12 December 2024)
- ML20137V843 + (01:55:14, 12 December 2024)
- IR 05000267/1985023 + (01:55:15, 12 December 2024)
- NLS8500277, Responds to NRC Re Violations Noted in Insp Rept 50-298/85-21.Corrective Actions:Grade 8 SAE Bolts & Nuts Replaced W/Sa 193 Bolts & SA 194 Nuts & Engineering Evaluation Performed Re Torus Drain Flanged Connection + (01:55:16, 12 December 2024)
- ML20137V835 + (01:55:17, 12 December 2024)
- ML20137V834 + (01:55:17, 12 December 2024)
- ML20137V829 + (01:55:18, 12 December 2024)
- IR 05000298/1985021 + (01:55:19, 12 December 2024)
- ML20137V825 + (01:55:20, 12 December 2024)
- ML20137V823 + (01:55:21, 12 December 2024)
- ML20137V824 + (01:55:21, 12 December 2024)
- ML20137V822 + (01:55:22, 12 December 2024)
- ML20137V820 + (01:55:23, 12 December 2024)
- U-602721, Forwards Util Plan to Address Concerns W/Low & Medium Voltage Circuit Breakers at Facility + (01:55:24, 12 December 2024)
- ML20137V817 + (01:55:24, 12 December 2024)
- ML20137V815 + (01:55:25, 12 December 2024)
- ML20137V814 + (01:55:26, 12 December 2024)
- ML20137V812 + (01:55:27, 12 December 2024)
- TXX-9706, Submits Response to Violations Noted in Insp Repts 50-445/97-04 & 50-446/97-04.Corrective Actions:Change Initiated to Emergency Plan Procedure to Revise Site Evacuation Instructions to Be Consistent W/Emergency Plan + (01:55:28, 12 December 2024)
- 05000315/LER-1985-006, :on 850206,auxiliary Bldg Access Control Ventilation Duct Fire Damper Found Closed.Damper Designed as safety-related But Misidentified as nonsafety-related.Damper Reset + (01:55:30, 12 December 2024)
- ML20137V804 + (01:55:31, 12 December 2024)
- BSEP-97-0060, Forwards Supplemental Info Re GL 92-01, Reactor Vessel Structural Integrity. Evaluation Rept on Reactor Vessel, Also Encl + (01:55:32, 12 December 2024)