ML20137V907

From kanterella
Jump to navigation Jump to search
Discusses Database,Providing Framework That Will Allow Utils Access to up-to-date Correlations to Support Steam Generator Tube Alternate Repair Criteria
ML20137V907
Person / Time
Issue date: 04/10/1997
From: Sheron B
NRC (Affiliation Not Assigned)
To: Modeen D
NUCLEAR ENERGY INSTITUTE (FORMERLY NUCLEAR MGMT &
References
NUDOCS 9704170448
Download: ML20137V907 (5)


Text

. . . . . . . . -- .- -

casa p/

g y"'

j UNITED STATES NUCLEAR REGULATORY COMMISSION I J 2 WASHINGTON. D.C. 20666 4 001 1

    • g / -

April 10, 1997 l

Mr. David Modeen Manager, Engineering Nuclear Energy Institute 17761 Street, NW Suite 400 Washington, DC 20006-3708 Dea b This letter is in reference to a proposed protocol for the Electric Power Research Institute (EPRI)

Steam Generator Degradation Specific Management (SGDSM) Database. The database is intended to provide a framework that will allow utilities access to up to-date correlations to l support steam generator tube alternate repair criteria. The NRC has received and corapleted a review of a revised SGDSM Database protocol provided by letter dated January 15,1597. The updated protocol included in the letter incorporated comments provided by the staff via a setter to you dated September 24,1996, and discussions held during a meeting held on November 6, 1996. The staff has concluded that the overall protocol appears acceptable with the exception  ;

of one item.

item 5 of the protocol establishes guidelines for making judgements as to when a shift in a correlation is deemed to be significant and non-conservative. These criteria for the burst and leakage correlations are associated with potential changes in the voltage at the structural limit of 1.4 times main steam line break differential pressure and the leak rate at the largest repair limit, respectively. The NRC staff requests that the industry submit an assessment supporting the technical bases for this item of the protocol. The assessment should demonstrate the effects of shifts in the correlations equal to the limits established in item 5 on, for example, the

, conditional burst probability and leak rate calculations. The staff will make a determination on the acceptability of item 5 pending its review of the assessment. _ ,

Based on the staff's review of the proposed SGDSM i Mabase protocol, it has concluded that the protocol is acceptable with the exception of item 5. The staff notes that acceptance of the protocofat this time is based on the low likelihood of a significant non-conservative shift in the correlations in the near term. Therefore, we request that you provide the bases for supporting item 5'for staff review within 90 days. Per the SGDSM Protocol, the staff would anticipate the annual update of the burst and leakage correlations as soon as possible. If, however, delays are expected in the implementation of the protocol, please inform the staff as g pFoSG p p 6 g,ePRI 4

9704170448 970410 g b e $2 " 9 PDR REVGP ERGNUMRC  ;

PDR y 3. } tJc I

.  % NRf' RLE CENTER COPY  !

- . . - - - - .- = -- . . . . - . . . - . - . - , .

l 4 .

l -

David Modoen to when the first update to the database will occur. If you have any questions, please call rne at (301) 415-2722. l l

Sincerely, NS!GNEDEy j Brian W. Sheron, Director Division of Engineering Office of Nuclear Reactor Regulation i

l 1 Distribution:

PDR EMCB RF h DE RF Central Files I AThadani KKarwoski i EMurphy JTsao CBeardslee l SCoffin

. DOCUMENT NAME: G:\ RUSH \SGDMSPRO. DOC i

'See Previous Concurrence j T. h. . , .e me. e wn.nt, mee m o wm: c - coey wahout mt.cewn.nt/.new.w. r - Copy with .tt. chm.nt/.ncio.ur. N* - No copy OFFICE 'DE:EMCB lE 'DE:EMCB 'DE:EMCB l 'DE:DD

, NAME PJRush EJSullivan JStrosnider GClainas DATE 03/ 97 03/12/97 03/25/97 r. 03/31/97 umunummume mum mummmmmmmmmmmemuur num unummmmmmmuumum unna OFFICE DE: (

NAME BWtWon DATE 04//g97 OFFICIAL RECOF,D COPY 4

4 h

I

  • . j Mr. David Modeen 2 Distribution:

PDR EMCB RF DE RF Central Files )

AThadani  !

KKarwoski EMurphy JTsao CBeardslee SCoffin DOCUMENT NAME: G:\ RUSH \SGDMSPRO. DOC "See Previous Concurrence To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E' = Copy with attachment / enclosure "N" = No copy OFFICE DE:EMCB" lE DE:EMCB* DE:EMCB Aj) Df/QD l l NAME PJRush EJSullivan JStrosnidey / GM6ainas DATE 03/12/97 03/12/97 03/25/97 /3, 3/3A > $3/7//97 OFFICE DE:D j NAME BWSheron DATE 03/ /97 OFFICIAL RECORD COPY

f0 p,.m ARA i

d David Modeon ,

, to when the first update to the database will occur. If you have any questions, please call me '

at (301) 415-2722. ,

Sincerely, 4

MS!GNEDBY

r Brian W. Sheron, Director .

i Division of, Engineering' -

, Office of Nuclear Reactor Regulation , .

I s i ,

l Distribution: .

PDR

EMCB RF i DF RF_ ,

l TCaintral Fil@

j A"hadani i KKarwoski '

j

EMurphy ,

JTsao )

CBeardslee SCoffin
DOCUMENT NAME
G:\ RUSH \SGDMSPRO. DOC l

'See Previous Concurrence Ta resolve e espy of this deewment,ladcate in the box: "C" = Copy wkhout ettachment/ enclosure "E* = Copy with ettachment/ enclosure "N" = No copy

} OFFICE 'DE:EMCB lE 'DE:EMCB l *DE:EMCB 'DE:DD l NAME PJRush EJSullivan JStrosnider GCLainas DATE 03 97 03/12/97 03/25/97 03/31/97 umummmmmmmuma summ mummmmmmmmmmmme usum mammmmmmmMdm,ide,o s ammu numummummmmmmmm .

OFFICE DE: [

NAME BWtM on DATE 04//g97 OFFICIAL RECOF D COPY i

2 Mr. Alex Marion Distribution:

PDR EMCB RF DE RF Central Files AThadani KKarwoski EMurphy JTsao CBeardslee SCoffin DOCUMENT NAME: G:\ RUSH \SGDMSPRO. DOC To receive a copy of thle document, indicate in the box: "C" = Copy without attachment / enclosure "E" - Copy with attachment / enclosure "N* = No copy OFFICE DE:EMCB E DE:EMCB DE:EMCB C DE:DD l NAME PJRush M EJSullivan fjd JStrosnider GClainas DATE 03//2/97' 03/l1/97 L) 03/ 197 03/ /97 OFFICE DE:D NAME BWSheron DATE 03/ /97 OFFICIAL RECORD COPY l

,