Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137Z978 + (01:20:36, 12 December 2024)
- ML20137Z979 + (01:20:36, 12 December 2024)
- ML20137Z975 + (01:20:37, 12 December 2024)
- 05000277/LER-1997-001-03, :on 970318,TS Violation Due to non-conservative Average Power Range Monitor Flow Bias Scram Setpoints for Single Loop Operation.Procedural Enhancements to Ensure That Single Loop Flow Conditions,Accommodated + (01:20:38, 12 December 2024)
- ML20137Z972 + (01:20:39, 12 December 2024)
- ML20137Z970 + (01:20:40, 12 December 2024)
- ML20137Z971 + (01:20:40, 12 December 2024)
- ML20137Z967 + (01:20:41, 12 December 2024)
- ML20137Z961 + (01:20:42, 12 December 2024)
- ML20137Z964 + (01:20:42, 12 December 2024)
- ML20137Z959 + (01:20:43, 12 December 2024)
- ML20137Z956 + (01:20:44, 12 December 2024)
- IR 05000443/1985035 + (01:20:47, 12 December 2024)
- ML20137Z954 + (01:20:48, 12 December 2024)
- IR 05000456/1985032 + (01:21:11, 12 December 2024)
- ML20137Z952 + (01:21:11, 12 December 2024)
- ML20137Z950 + (01:21:12, 12 December 2024)
- ML20137Z948 + (01:21:13, 12 December 2024)
- ML20137Z946 + (01:21:14, 12 December 2024)
- ML20137Z944 + (01:21:14, 12 December 2024)
- IR 05000443/1986008 + (01:21:15, 12 December 2024)
- ML20137Z941 + (01:21:16, 12 December 2024)
- ML20137Z940 + (01:21:17, 12 December 2024)
- ST-HL-AE-5631, Responds to NRC Re Violations Noted in Insp Rept 50-499/97-10.Corrective Actions:Measurements of Airborne Radioactivity & Surface Contamination Performed During Next Entry Into SG Bowls for Removal of Nozzle Dams + (01:21:18, 12 December 2024)
- ML20137Z939 + (01:21:18, 12 December 2024)
- ML20137Z935 + (01:21:19, 12 December 2024)
- IR 05000624/2009006 + (01:21:20, 12 December 2024)
- ML20137Z934 + (01:21:20, 12 December 2024)
- ML20137Z931 + (01:21:21, 12 December 2024)
- PY-CEI-NRR-0344, Advises That Proof & Review Tech Specs Reviewed.Resolution of Concerns W/Administrative Issues Expected Prior to Issuance of Final Draft Tech Specs.Ltr Will Be Submitted 30 Days Prior to Fuel Load Rquesting OL + (01:21:21, 12 December 2024)
- ML20137Z926 + (01:21:22, 12 December 2024)
- ML20137Z924 + (01:21:24, 12 December 2024)
- ML20137Z925 + (01:21:24, 12 December 2024)
- ML20137Z921 + (01:21:25, 12 December 2024)
- ML20137Z923 + (01:21:25, 12 December 2024)
- ML20137Z920 + (01:21:26, 12 December 2024)
- ML20137Z918 + (01:21:26, 12 December 2024)
- ML20137Z916 + (01:21:27, 12 December 2024)
- ML20137Z917 + (01:21:27, 12 December 2024)
- ML20137Z913 + (01:21:28, 12 December 2024)
- ML20137Z912 + (01:21:29, 12 December 2024)
- W3P86-1044, Documents Addl Confirmatory Info Re Depressurization Capability W/Degraded Auxiliary Pressurizer Spray. Depressurization Measured During Test Substantially Higher than Rate Assumed in FSAR Analysis + (01:21:29, 12 December 2024)
- ML20137Z909 + (01:21:30, 12 December 2024)
- 05000334/LER-1997-006, :on 970322,failure to Test Solid State Protection Sys Logic IAW TS Caused by Procedural Deficiencies.Performed Surveillance Testing on 970324 + (01:21:31, 12 December 2024)
- CLI-85-08, Forwards FEMA Status Rept on Special Proceeding Decision CLI-85-08,containing Schedule of Unresolved Emergency Preparedness Deficiencies.Resolution of Issues in Cooperation W/State & Local Govts Requested + (01:21:32, 12 December 2024)
- ML20137Z904 + (01:21:33, 12 December 2024)
- ML20137Z903 + (01:21:34, 12 December 2024)
- IR 05000423/1986006 + (01:21:36, 12 December 2024)
- ML20137Z900 + (01:21:36, 12 December 2024)
- ML20137Z899 + (01:21:38, 12 December 2024)
- 05000334/LER-1997-007, :on 970322,failure to Test Control Room Emergency Bottled Air Pressurization Subsystem IAW TS Was Caused by Inadequate Coordination,Communication & Procedures.Discharge Trip Valves Tested + (01:21:40, 12 December 2024)