Forwards Determination of Costs for Review of Listed Topical Repts.Ofc of Resource Mgt Will Send Bill
ML20137Z926
Person / Time
Issue date: 12/05/1985
From: Miller W
NRC OFFICE OF ADMINISTRATION (ADM)
To: Rahe E
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
References
NUDOCS 8512110449
Download: ML20137Z926 (3)


Text

._ ______ _____ - . - _______ _

  • DISTRIBUTION w/ encl.:

POR

  1. Reg Records HBernard. SSPB LSolander, PRAB CHarwood. PRAB RRakowski,RM/A MRodriguez, RM/A DEC 5 1985 LFMS SP Actual M/P LFMS Topical CJHolloway Westinghouse Electric Corporation 9(p ATTH: Mr. E. P. Rahe. Jr.

Manager. Nuclear Safety Dept.

Box 355 Pittsburgh, PA 15230 Gentlemen:

Consistent with the requirments of 10 CFR 170.12(f) and 170.21.J. we have determined the professional staff hours and contractual costs for the completed review (s) of the topical report (s) listed on the enclosed sheets. The Office of Resource Management has been notified to bill your Corporation for these completed reviews. When making payment, please make reference to the bill number. In those cases where your Corporation has made payment for some portion of the report review based on the Comnission's periodic billing method, these payments are shown as a credit on the enclosure.

Under the provisions of 10 CFR 170.21.J. fees are detemined based on

$39 per professional staff hour for review time expended between filing of the report and June 23.1984 (the ending period of the first full week after the revised rule became effective on June 20.1984). From June 24. 1984 through completion of the review. the professional staff rate is $62 per hour. Where review cost exceeds $20,000. your Corporation is billed for $20.000 because that is the maximum which can be charged under Part 170 for the review of a topical report or for each revision or amendment to an accepted topical report.

If you have other report reviews that have been completed or are under review, but are not on the enclosed sheets, they will bo billed at a later date when cost data are available. Any questions relating to your bills should be directed to Mrs. Reba H. Diggs on 301/492-7225.

Sincerely.

DMnal Slaned by 0512110449 051205 h. 4 ma gDR TOPRP a wh William O. Hiller. Director Licenso Fee Management Staff Office of Administration

,f'

Enclosure:

f

(

List of Reports and Costs

$\

~

sg .LFH J i. LFMS:ADM l j ~ ~~> > R 981jp CJil way WOMiller i l 11/ 2 /85 lij/'/85 lifL; /85 j {' I 55 "M om"5nm OFFICI AL HCCORC1 COPY

ENCLOSURE 1 LIST OF TOPICAL REPORT REVISIONS AND REVIEW COSTS Company name and address: Westinghouse Electric Corporation ATTN: Mr. E. P. Rahe, Jr.

Manager, Nuclear Safety Dept.

Box 355 Pittsburgh, PA 15230 NRC Report No. and Title Control No. Review Status Review Costs

1. Addendum 1 to WCAP-9561 - BART-A1: 56643 Completed $3,198*

A Computer Code for the Best 3/1/85 Estimate Analysis of Reflood Transients" submitted 12/12/84.

  • (54 hours6.25e-4 days <br />0.015 hours <br />8.928571e-5 weeks <br />2.0547e-5 months <br /> x $62 = $3,348 less

$150 application fee paid by -

Check No. 541019)

2. WCAP-10054(P) " Westinghouse 49326 Completed $14.267*

Small Break ECCS Evaluation 5/21/85 Model Using the Notrump Code" submitted 12/22/82.

o($20,000less$5,733previously I assessed under Bill No. D0288 in May 1985. Total review cost was $53,449 based on 147 hours0.0017 days <br />0.0408 hours <br />2.430556e-4 weeks <br />5.59335e-5 months <br /> x

$39; 318 hours0.00368 days <br />0.0883 hours <br />5.257936e-4 weeks <br />1.20999e-4 months <br /> x $62 and $28,000 in contractual cost)

3. WCAP 10079(P) "Notrump Nodal 49129 Completed $14.228*

Transient small Break and General 5/23/85 i Network Code" submitted 12/12/82 0 ($20,000 less $5.772 previously assessed under Bill No. 00288 in May 1985. Total review cost $27.012 based on 148 hours0.00171 days <br />0.0411 hours <br />2.44709e-4 weeks <br />5.6314e-5 months <br /> x $39; 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> x$62and$20,000incontract. costs) .

L

4. WCAP-10271 " Evaluation of Sur- 49$45 Compfeted $20,000*

veillance frequencies and Out-of- 2/21/85 Service Times for Reactor Pro-tection..." submitted 2/3/83.

l * (Actual review cost was $101,737.50 based on 1068.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> x $39; 243 l hours x $62 and $45,000 in ron-

" '}'

l TOTAL AMOUNT DUE: $(seepage 2)

DCLOSEI 1 0

LIST OF TOPICAL REPORT REvlS10NS AND REVIEW COSTS ~

)

Company name and address: WEC(2)

-NRC Report No. and_ Title Control No. Review Status Review Costs

5. WCAP-10444 " Vantage 5 Fuel 55082 Completed $20.000*

Assembly" submitted 12/30/83. 7/85 o (Actual review cost was $79,374 based on 627 hours0.00726 days <br />0.174 hours <br />0.00104 weeks <br />2.385735e-4 months <br /> at $62 and

$40.500 in contractual costs).

l l

l TOTAL Ai40VNT DUE. $71,693 l