Forwards Determination of Costs for Review of Listed Topical Repts.Ofc of Resource Mgt Will Send Bill
ML20137Z913
Person / Time
Issue date: 12/05/1985
From: Miller W
NRC OFFICE OF ADMINISTRATION (ADM)
To: Klapproth J
GENERAL ELECTRIC CO.
References
NUDOCS 8512110445
Download: ML20137Z913 (3)


Text

, - - -

DISTRIBUTION w/ encl.:

. PDR Reg Records ,

'@? HBernard, SSPB  !

LSolander, PRAB CHarwood,-PRAB-RRakowski, RM/A ~

DEC 5 1985 MRodriguez,RM/A LFMS-SP Actual M/P LFMS Topical CJHolloway '

General Electric Company RMDiggs ATTN: Mr. J. F. Klappreth LFMS R/F

-Principal Licensing Engineer Nuclear Technologies and Fuel Division 175 Curtner Avenue

. San Jose. California 95125  :

' Gentlemen:-

Consistent with the requirements of 10 CFR 170.12(f) and 170.21.J. we i ro l have determined the completed reviewthe p(s)fessional staff hours of the topical report (s) listed andon contractual costs for the enclosed sheets. The Office of Resource Management has been notified to bill '

your Company for these completed. reviews. . When making payment, please make reference to the bill number. In those cases where your Company has made p y nt for some portion of the report review based on the Commission s periodic billing method, these payments are shown as a credit on the enclosure. '

Under the provisions of 10 CFR 170.21.J. fees are determined based on

$39 per professional staff hour for review time expended between filing i of the report and June 23.1984 (the ending period of the first full

week after the revised rule became effective on June 20.1984). From l - June 24.1984 through completion of the review, the professional staff ,

! . rate is $62 per hour. Where review cost exceeds $20.000 your Company l

1s billed for $20.000 because that is the maximum which can be charged under Part 170 for the review of a topical report or for each revision or amendment to an accepted topical report.

If you have other report reviews that have been completed or are under

, review, but are not on the enclosed sheets, they will be billed at a

" later date when cost data are available. Any questions relating to your bills should be directed to Mrs. Reba M. Diggs on 301/492-7225.

Sincerely, i-I -

l Orldnal slaned by,  ;

j Wm. O. Miller , i es1211o445 e51205 PDR TOPRP EfWQENE William 0. Miller. Director License Fee Management Staff A

(/ M r C- PDR Office of Administration l

Enclosure:

List of Reports '

i and Costs

(

~~*

\ __ _ .. - ._ _ _ _ _ _

l LFMS: DM LFMS:ADM i LJFStADM k . .CJ oway.. WOMiller. ... ...

IV. R. /. 85

.. . l. .b. . /.85. . 1.. / "/85 ..

!- . i. .

wac roau m omeowcu om OFFICIAL RECORD COPY -. - - . - . . . - _ . _ . -

T . . .

~ '

EELOSURE 1 A

LIST OF TOPICAL REPORTS AND REVIEW COSTS Company name and address: General Electric Company ATTH: !4r. J. F. Klapproth Principal Licensing Engineer fluclear Technologies and Fuel Division 175 Curtner Avenue San Jose, California 95125 NRC Report No. and Title Control No. Review Status Review Costs

1. Supplement I to NEDE-22290 - 56929 Completed 53,167*

" Safety Evaluation of General 6/12/85 Electric Hybrid 1 Control Rod Assembly for the BWR 4/5 C Lattice" submitted'2/20/85.

  • (53.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> x S62 = $3,317 less $150 application fee paid by Check No.

01337 dated 3/15/85)

2. Supplement 2 to NEDE-22290 - 56930 Completed . $1,524*

" Safety Evaluation of the 7/1/85 General Electric Advanced Longer Life Control Rod Assembly" submitted 2/20/85.

  • (27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> x S62 = $1,674 less $150 application fee paid by Check No.

01337 dated 3/15/85)

3. Addendum 1 to NE00-10466A - 57178 Completed $2,144*

" Power Generation Control 5/17/85 Complex Design Cri teria. . ."

  • (37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br /> x $62 = S2,294 less $150 application fee paid by Check No.

13232 dated 3/13/85).

4. NEDE-22148 " Extended Burnup 48568 Completed $11,347*

Evaluation Technology" submitted 8/13/85 6/25/82.

  • (520,000 less $8,653 previously billed on May 13,1985(00279)and paid. Total review cost was

$50,391 based on 27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> x $39; 149 hours0.00172 days <br />0.0414 hours <br />2.463624e-4 weeks <br />5.66945e-5 months <br /> x $62. and $40,100 in contractual costs).

TOTAL AMOUNT DUE: See page 2

~

~ '

~ ~'

, ENCLOSURE t-LIST OF TOPICAL REPORT REVISIONS AND REVIEW COSTS Company name and address: GE(2)

NRC Report No. and Title Control No. Review Status Review Costs

5. Amendment No. 10 to NED0-24011- 56516 Completed $19,850*

P-A GESTAR II, submitted 5/28/85 ,

11/30/84.

e ($20,000 less $150 application fee paid by Check No. 14500 dated 3/27/85. Total review cost was

$35,650 based on $62 x 220.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />

.and $21,979 in contractual costs).

1 I

TOTAL AMOUNT DUE: 538.032