ML20137Z920

From kanterella
Jump to navigation Jump to search
Notification of 970522 Meeting W/Util in Burlington,Ks to Discuss SALP Results
ML20137Z920
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 04/22/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9704250144
Download: ML20137Z920 (5)


Text

1 pa "'% UNIT E D ST AT ES

,,--  % NUCLEAR REGULATORY COMMISSION

.y n

{ .g REGION IV S

D 'I4 ' 611 RYAN PL AZA DRIVE. SUITE 400

% AR LINGTON. TEXAS 760118064 APR 2 2 l997 NOTICE OF LICENSEE MEETING >

Name of Licensee: Wolf Creek Nuclear Operating Corporation-Name of Facility: Wolf Creek Generating Station Docket: 50-482- 1 Date and Time May 22. 1997 {

of Meeting: 9 a.m.-(CDT) i Locaticn of Meeting: Dwight D. Eisenhower Learning Center Burlington. Kansas Purpose of Meeting: Systematic Assessment of Licensee Performance (SALP) results NRC Attendees: E. Merschoff. Regional Administrator W. Bateman. Director. Project Directorate'IV-2.

Office.of Nuclear Reactor Regulation (NRR) l

.K. Brockman. Deputy Director. Division of-Reactor l

-Projects (DRP)  !

A. Howell. Director. Division of Reactor Safety i W. Johnson Chief. Project Branch Chief. DRP l C. Hackney. State Liaison Officer l J. Stone. Senior Project Manager. NRR  ;

J. F. Ringwald. Senior Resident Inspector._DRP '

J. Dixon-Herrity. Resident- Insr>ector. DRP B. Henderson. Public Affairs Officer Licensee Attendees: 0. Maynard. President and Chief Executive Officer R. Muench Vice President Engineering T. Garrett. Manager Design Engineer _ing N. Hoadley., Manager Su) port Engineering R. Flannigan, Manager iuclear Engineering G. Boyer. Acting Chief Administrative Officer C. Warren. Chief Operating Officer -

R. Simms. Manager System Engineering B. Mckinney. Plant Manager C. Younie. Manager Operations G. Moore. Manager Maintenance M. Blow. Superintendent Chemistry T. Conley. Superintendent Radiation Protection ,

f C. Fowler Manager Integrated Plant Scheduling J. Pippin. Manager Training (continued) /

h 9704250144 970422 F

PDR ADOCK 05000482 PDR llllllllllllllll i

-g e- a,-e,s- e , - , - y e-- -- - ,,e - g -e

I l

l l

Wo1f Creek Nuclear I Operating Corporation '

I W. Norton. Manager Performance Improvement and Assessment J. Johnson Superintendent Security J. Weeks. Manager Emergency Planning NOTE:

(1) This meeting is open to attendance by members of the general public.

(2) NRC personnel, not listed above, that desire to attend this meeting should notify W. D. Johnson at (817) 860-8148 by COB on May 16. 1997.

Approved B . v[M#dMeu

& Tp6 mas P. V4y y Director Division of Reactor Projects cc:

Otto L. Maynard. President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington. Kansas 66839 Chief Operating Officer Wolf Creek Nuclear Operating Corp.

P.O. Box 411 Burlington. Kansas 66839 Jay Silberg. Esq.

Shaw. Pittman. Potts & Trowbridge 2300 N Street. NW Washington. D.C. 20037 Supervisor Licensing Wolf Creek Nuclear Operating Corp.

P.O. Box 411 Burlington. Kansas 66839 Chief Engineer Utilities Division Kansas Corporation Commission 1500 SW Arrowhead Rd.

Topeka. Kansas 66604-4027 Office of the Governor State of Kansas Topeka Kansas 66612 m

z.

Wolf Creek Nuclear Operating Corporation Attorney General Judicial Center 301 S.W. 10th 2nd Floor Topeka. Kansas 66612-1597 County Clerk Coffey County Courthouse Burlington. Kansas 66839-1798 Public Health Physicist Division of Environment Kansas Department of Health '

and Environment Bureau of Air & Radiation Forbes Field Building 283 Topeka Kansas 66620 Mr. Frank Moussa Division of Emergency Preparedness 2800 SW Topeka Blvd Topeka, Kansas 66611-1287

I Wolf Creek Nuclear l Operating Corporation APR 2 21997 l

E-Mail To: FOR

( ) NRC Attendees l PMNS Mtg. Announcement Coordinator JKR E. L. Jordan. DEDO PAB H. L. Thompson. DEDR FJM F. J. Miraglia. A/D/NRR ACT A' C. Thadani. ADT/NRR RPZ R. P. Zimmerman ADP/NRR 0EMAIL J. Lieberman. D/0E LJC L. J. Chandler 0GC DMK1 D. M. Kunihiro. WCF0 GFS G. F. Sanborn. E0 MFH2 M. Hammond. PA0 KEP Ken Perkins. Director. WCF0 JAC1. CMS CJG RA Secretaries LAT. DLF. CAM 3 DRP Division CLG LMB. DXY DRS Division CLS1, NLH WSW DNMS Division LSO Linda Ousley cc:

DMB (IE 45)  :

OEDO RIV Coordinator (17G21) I Rece)tionist ORA rile  ;

RIV File DRP File i

To receive copy of po:ument, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:C:DRP/B l,r PA0 l M- RSLO lUrty D:DRP l _ l WDJohnson:df// BWHenderson CAHackney ' TPGwynn ia(lfl 4/ a 2 /97 4/ n /97 4/A A/97 4/ g//9Fv' 0FFICIAL RECORD COPY  :

\)

, 4, d

i Wolf Creek Nuclear Operating Corporation APR 2 21997 l

E-Mail To
FOR 5 NRC Attendees

( )

l PMNS Mtg. Announcement Coordinator-1 JKR E. L.-Jordan. DEDO PAB H. L. Thompson. DEDR

FJM F. J. Miraglia. A/D/NRR ACT A. C. Thadani. ADT/NRR RPZ R. P. Zimmerman. ADP/NRR l 0EMAIL J. Lieberman..D/0E l i LJC' L. J. Chandler. OGC DMK1 D. M. Kunihiro. WCF0 i

GFS G. F. Sanborn. EO MFH2 M. Hammond. PA0 KEP Ken Perkins. Director. WCF0 JAC1. CMS. CJG RA Secretaries LAT. DLF CAM 3- DRP Division CLG. LMB. DXY DRS Division CLSI. NLH WSW DNMS Division LSO Linda Ousley cc: )

DMB (IE 45)

OEDO RIV Coordinator (17G21)

Rece)tionist DRA ile filV File i DRP File  !

To receive copy of po:ument, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:C:DRP/B br PA0 l 64- RSLO l&tg D:DRP l . l

' TPGwynn \aif)

W0 Johnson:df// BWHenderson CAHackney 4/ a /97 4/ W/9Yv' 4/2 2 /97 4/ @ /97 0FFICIAL RECORD COPY \)

- .