Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138A216 + (01:18:36, 12 December 2024)
- B11887, Forwards Applications for 1986 Radwaste Transport Permits. Certificates of Liability Insurance & Fees Encl + (01:18:37, 12 December 2024)
- ML20138A211 + (01:18:37, 12 December 2024)
- PNO-V-85-067, on 851002,earthquake of Magnitude 5.0 on Richter Scale Occurred.Epicenter Located Approx 50 Miles North of Site.Event Minor,Not Felt by Site Personnel & Did Not Activate Recording Instruments + (01:18:38, 12 December 2024)
- ML20138A210 + (01:18:38, 12 December 2024)
- ML20138A208 + (01:18:39, 12 December 2024)
- ML20138A206 + (01:18:40, 12 December 2024)
- ML20138A207 + (01:18:40, 12 December 2024)
- ML20138A205 + (01:18:41, 12 December 2024)
- ML20138A204 + (01:18:42, 12 December 2024)
- ML20138A202 + (01:18:43, 12 December 2024)
- IR 05000416/1985043 + (01:18:44, 12 December 2024)
- ML20138A196 + (01:18:45, 12 December 2024)
- ML20138A197 + (01:18:45, 12 December 2024)
- 05000029/LER-1985-003, :on 851105,fuel Assemblies B-6961,B-688 & A-679 from Core Positions C-9,H-8 & K-5,respectively,found Damaged & W/Failed Fuel Rods.Caused by Core Baffle Spacer Flow Jetting.Cycle Xviii Fuel Assemblies Modified + (01:18:47, 12 December 2024)
- ML20138A193 + (01:18:48, 12 December 2024)
- ML20138A187 + (01:18:49, 12 December 2024)
- ML20138A188 + (01:18:49, 12 December 2024)
- ML20138A183 + (01:18:50, 12 December 2024)
- PY-CEI-NRR-0362, Forwards Ltr Authorizing Microfiching Encl NUS Proprietary Info Re Process Control Program for Radwaste Solidification, Procedure Change Requests & Revs to Process Control Programs.Proprietary Info Withheld + (01:18:50, 12 December 2024)
- ML20138A182 + (01:18:51, 12 December 2024)
- ML20138A178 + (01:18:52, 12 December 2024)
- ML20138A177 + (01:18:52, 12 December 2024)
- ML20138A176 + (01:18:53, 12 December 2024)
- NSD-NRC-97-5077, Forwards W Response to NRC RAI Re to AP600 Hydrogen Diffusion Flame Topic + (01:18:53, 12 December 2024)
- ML20138A173 + (01:18:54, 12 December 2024)
- ML20138A168 + (01:18:55, 12 December 2024)
- ML20138A167 + (01:18:55, 12 December 2024)
- ML20138A164 + (01:18:56, 12 December 2024)
- 05000414/LER-1997-003-01, :on 970217,component Cooling Sys Unavailability Was Caused by Failure of Breaker Charging Springs Motor Coils When Breaker Was Closed on 970125.Failed Breaker Was Replaced W/Refurbished Spare Breaker + (01:18:58, 12 December 2024)
- ML20138A160 + (01:18:59, 12 December 2024)
- ML20138A159 + (01:18:59, 12 December 2024)
- ML20138A157 + (01:19:00, 12 December 2024)
- ML20138A156 + (01:19:00, 12 December 2024)
- ML20138A155 + (01:19:01, 12 December 2024)
- ML20138A152 + (01:19:02, 12 December 2024)
- 05000331/LER-1985-044, :on 851105,RCIC Taken Out of Svc to Modify RCIC-to-vessel Inject Valve Circuitry.Repair Completed.On 851107,RCIC Tripped on Electrical Overspeed.Caused by Setpoint Drift on Overspeed Trip Monitor + (01:19:07, 12 December 2024)
- ML20138A146 + (01:19:08, 12 December 2024)
- ML20138A145 + (01:19:08, 12 December 2024)
- B11716, Forwards Reviews of Integrated Safety Assessment Program, Topics 2.17,2.21 & 2.24 Re Ventilation Duct Chase Plant Distribution Protection,Load Ctr Replacement of Oil Filled Breakers & Offsite Power Sys,Respectively + (01:19:09, 12 December 2024)
- ML20138A143 + (01:19:09, 12 December 2024)
- ML20138A140 + (01:19:13, 12 December 2024)
- ML20138A138 + (01:19:13, 12 December 2024)
- B11672, Forwards Revised Response to SER (NUREG-1031) Question 480.37 Re Asymmetric Pressure Loadings on Structures & Components Due to Postulated Pipe Ruptures,Including Results of Evaluation of Asymmetric Loadings on Pressurizer + (01:19:14, 12 December 2024)
- ML20138A134 + (01:19:14, 12 December 2024)
- ML20138A133 + (01:19:15, 12 December 2024)
- ML20138A132 + (01:19:16, 12 December 2024)
- ST-HL-AE-1373, Provides Addl Info Re Risk Mgt Program to Evaluate Design Changes in Form of Modified Preliminary Scoping Study,Per 850819 Commitment.Positive Displacement Charging Pump Incorporated in Program + (01:19:16, 12 December 2024)
- ML20138A128 + (01:19:18, 12 December 2024)
- ML20138A124 + (01:19:19, 12 December 2024)
- ML20138A120 + (01:19:20, 12 December 2024)