Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138B761 + (01:05:14, 12 December 2024)
- ML20138B760 + (01:05:15, 12 December 2024)
- ML20138B756 + (01:05:16, 12 December 2024)
- ML20138B757 + (01:05:16, 12 December 2024)
- 2CAN038607, Forwards Revised Schedule for Completion of Inadequate Core Cooling Sys Milestones (NUREG-0737,Item II.F.2). Qualification Program for in-containment Cabling & Connectors for Core Exit Thermocouples Currently Underway + (01:05:17, 12 December 2024)
- ML20138B753 + (01:05:18, 12 December 2024)
- ML20138B752 + (01:05:19, 12 December 2024)
- ML20138B750 + (01:05:19, 12 December 2024)
- IR 05000254/1985001 + (01:05:20, 12 December 2024)
- IR 05000440/1985064 + (01:05:21, 12 December 2024)
- ML20138B746 + (01:05:22, 12 December 2024)
- ML20138B742 + (01:05:23, 12 December 2024)
- ML20138B744 + (01:05:23, 12 December 2024)
- ML20138B739 + (01:05:24, 12 December 2024)
- 05000266/LER-1997-015, :on 970324,control Room Ventilation Sys Declared Inoperable Due to Failures of Backdraft Damper & Vent Duct Access Door.Backdraft Damper,Replaced + (01:05:26, 12 December 2024)
- 05000220/LER-1985-012, :on 850916,reactor Cleanup Sys Isolated Due to High Area Temp.Caused by Steam Leaking from Gland Packing on 1-inch Vent Valve from Cleanup Nonregenerative Hx.Leak Repaired + (01:05:29, 12 December 2024)
- ML20138B732 + (01:05:30, 12 December 2024)
- ML20138B730 + (01:05:30, 12 December 2024)
- ML20138B727 + (01:05:31, 12 December 2024)
- ML20138B729 + (01:05:31, 12 December 2024)
- ML20138B726 + (01:05:32, 12 December 2024)
- IR 05000315/1985039 + (01:05:33, 12 December 2024)
- 05000265/LER-1985-020-04, :on 850916,all High Level Pump Trip Switches Taken Out of Svc W/O Considering Tech Spec Requirements to Remove Broken Pencil Inside 3-ft Level Alarm Switch.Caused by Personnel Error + (01:05:35, 12 December 2024)
- ML20138B721 + (01:05:36, 12 December 2024)
- ML20138B720 + (01:05:37, 12 December 2024)
- 05000322/LER-1985-043, :on 850917,full Reactor Trip Occurred Due to Low Level Signal.Caused by Hydraulic Oscillation When Instrument Test Equipment Valved In.Procedures to Be Revised + (01:05:42, 12 December 2024)
- ML20138B718 + (01:05:43, 12 December 2024)
- ML20138B716 + (01:05:43, 12 December 2024)
- IR 05000440/1985058 + (01:05:45, 12 December 2024)
- B16401, Forwards non-proprietary & Proprietary Versions of Results of Initial Review of Licensed Operator Training Records,Per CAL 1-97-10.Proprietary Version Withheld Per 10CFR2.790 + (01:05:46, 12 December 2024)
- U-602728, Responds to NRC Ltrs Re Violations Noted in Insp Rept 50-461/96-15.Corrective Actions:Se Documenting That Manual Operation of Component Cooling Water Expansion Tank Was Not an Unreviewed Safety Question Was Approved on 961124 + (01:05:47, 12 December 2024)
- ML20138B711 + (01:05:47, 12 December 2024)
- ML20138B706 + (01:05:48, 12 December 2024)
- 05000366/LER-1997-003-02, :on 970328,excessive Leakage Identified on Secondary Bypass Valves Was Caused by Undersized Valve Operators & Inappropriate Valve & Operator Orientation. Re-routed Piping Containing Valves + (01:05:50, 12 December 2024)
- 05000366/LER-1997-002-02, :on 970325,grounded Jumper Caused Blown Fuse & Engineered Safety Features Actuations.Replaced Blown Fuse & Policies Contributing to Event Will Be Reviewed by 970601 + (01:05:52, 12 December 2024)
- ML20138B700 + (01:06:19, 12 December 2024)
- ML20138B699 + (01:06:20, 12 December 2024)
- IR 05000282/1985019 + (01:06:21, 12 December 2024)
- ML20138B695 + (01:06:22, 12 December 2024)
- ML20138B693 + (01:06:22, 12 December 2024)
- ML20138B692 + (01:06:24, 12 December 2024)
- ML20138B691 + (01:06:24, 12 December 2024)
- ML20138B689 + (01:06:25, 12 December 2024)
- ML20138B685 + (01:06:25, 12 December 2024)
- ML20138B682 + (01:06:26, 12 December 2024)
- ML20138B681 + (01:06:26, 12 December 2024)
- ML20138B680 + (01:06:27, 12 December 2024)
- HL-5372, Responds to NRC Re Violations Noted in Insp Repts 50-321/97-01 & 50-366/97-01.Corrective Actions:Rev to Procedures 34GO-OPS-065-1S & 34GO-OPS-065-2S Were Initiated & Weapon Discovered Returned to Secure Location + (01:06:28, 12 December 2024)
- ML20138B675 + (01:06:28, 12 December 2024)
- IR 05000346/1985039 + (01:06:37, 12 December 2024)
- ML20138B673 + (01:06:38, 12 December 2024)
- ML20138B671 + (01:06:38, 12 December 2024)