ML20138B729
| ML20138B729 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 03/19/1986 |
| From: | Carey J DUQUESNE LIGHT CO. |
| To: | Harold Denton, Tam P Office of Nuclear Reactor Regulation |
| References | |
| 2NRC-6-024, 2NRC-6-24, TAC-62916, NUDOCS 8603250142 | |
| Download: ML20138B729 (3) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _.
J
'Af f4
[sh~s 45 Nuclear Construction Division (41 ) 92 960 e
41 87229
%Dinson aza. Building 2. Suite 210 Mr. Harold R. Denton Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Mr. Peter Tam, Project Manager Division of DWR Licensing - A Office of Nuclear Reactor Regulation S UBJECT:
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Power Systems Branch Confirmatory Site Visit Gentlemen:
On February 12 and 13,1986 your staff conducted a site visit for the purpose of verifying information necessary to close various Power Systems Branch con-firmatory items.
The visit resulted in four follow-up items for DLC and one for NRR.
Proposed DLC responses were discussed informally on March 12, 1986 with the reviewer.
Please refer to Attachment I which provides responses to two of the issues which your staff has indentified.
DUQUESNE LIGHT COMPANY By J~9.Lfarey
/
Vice President GLB/jdw NR/PSBV/GLB Attachment cc:
Mr. G. Walton, NRC Resident Inspector (w/a)
INP0 Records Center (w/a)
NRC Document Control Desk (w/a)
Mr. S. Rhow kf k P
sed
^
S
United States Nuclear Regulatory Commission Mr. Harold R. Denton Power Systems Branch Confirmatory Site Visit Page 3 COMMONWEALTH OF PENNSYLVANIA SS:
COUNTY OF BEAVER On this
/ //L day of
//lfp/[/
/
, before me, a Notary Public in and for said Commonwealth and County, personally appeared J.
J.
Carey, who being duly sworn, deposed and said that (1) he is Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his knowledge.
J aja #) tra u
~
Notary Public SHEILA h. FAITOGE. 60TARY PUKlC SMif PiliGPORT 8000. BEAVYt COUNTY MY COMMISSION EIPIRES OCT. 23.1989 y,+er. Penrrsviv eh Associati3n of Nota:'ts
I 8
l j
POWER SYSTEMS BRANCH CONFIRMATORY SITE VIST I
ATTACHMENT 1
]
ISSUE N0.1 Based upon observations during the visit, the reviewer questioned the accuracy of the response to question 430.28.
The response to this question has subsequently reviewed and the following inaccura-cies were found:
i 1.
The " Battery Charger Disconnect Open" ala'rm is said to be provided in the main control room, but no annunciator win-dow is identified as such.
2.
Tha "DC System Ground" alarm was not included in the system design.
j To resolve these inconsistencies, DLC plans to:
1.
Revise the response to question 430.28 to indicate the
^
" Battery Charger Disconnect Open" alarm is part of the "DC Bus Trouble" alarm which is already provided in the control i
j room.
2.
Provide a "DC System Ground" alarm which is indicated in the control room.
ISSUE NO. 2 I
The reviewer questioned whether the FSAR provides a complete list of diesel generator trips which are bypassed on a safety signal. A subsequent review of FSAR 8.3.1.1.15 has shown that the FSAR must be revised.
The following trips are not bypassed when the diesel j
generator receives an emergency start signal:
i l
Generator current differential 1
Generator overexcitation Engine overspeed j
Back-up phase fault detection (torque controlled) j The " Generator Overexcitation" and "Back-up Phase Fault Detection" 1
trips use redundant logic in order to cause a tr:p.
The FSAR will be revised to incorporate this information.