ML20138B750
| ML20138B750 | |
| Person / Time | |
|---|---|
| Site: | 05200003 |
| Issue date: | 04/24/1997 |
| From: | Huffman W NRC (Affiliation Not Assigned) |
| To: | Liparulo N WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
| References | |
| NUDOCS 9704290261 | |
| Download: ML20138B750 (4) | |
Text
.
April 24, 1997 Mr. Nicholas J. Liparulo, Manager Nuclear Safety and Regulatory Analysis-Nuclear and. Advanced. Technology Division j
Westinghouse Electric Corporation P.O. Box 355-n Pittsburgh, Pennsylvania 15230 l
SUBJECT:
EDITORIAL COMMENTS ON THE AP600 HUMAN FACTORS ENGINEERING DOCUMENTA-TION l
Dear Mr. Liparulo:
The staff has noted some editorial type inconsistencies, omissions,'or mis-placed information in Chapter 18 of the AP600 Standard Safety Analysis Report
-and related WCAPs on Human Factors Engineering. This information is provided as an enclosure to this letter for correction.
If you have any questions regarding this matter, you can contact me at l
(301) 415-1141.
i Sincerely, j
original signed by:
o William C. Huffman, Project Manager 4--
Standardization Project Directorate F
Division of Reactor Program Management Office of Nuclear Reactor Regulation i
Docket No.52-003 2
Enclosure:
As stated cc w/ enclosure:
[
See next page j
I DISTRIBUTION:
Docket-File PDST R/F TMartin PUBLIC MSlosson TRQuay i
TKenyon BHuffman JSebrosky m
4'
-DJackson JMoore, 0-15 B18 WDean, 0-17 G21 V
V l
)
ACRS (11)
BBoger, 0-9 E4 CThomas, 0-9 H15 JBongarra, 0-9 HIS
.9000dl i
l n
,,.em.4 i.i
.MT Ii,1rT.,,y [ '
no.neio DOCUMENT NAME: ' A: EDIT-HF.C
/
. w.
r - c.,y van.ii w nii.noi n. no
,y 4
0FFICE PM:PDST:DRPM l
BC:HHRE :,DRCH [g D:PDST:DRPM-l l
NAME-WCHuffmantsgsk y-- CThomis'
' T,9 Quay 1TN '
DATE-044y/97-
- ' 04/:M/97-04/24/97 9704290261 970424
~ i.
i PDR-ADOCK 05200003 4
i E
PDR i
i
Mr. Nicholas J. Liparulo Docket No.52-003 Westinghouse Electric Corporation AP600 i
cc: Mr. B. A. McIntyre Mr. Ronald Simard, Director Advanced Plant Safety & Licensing Advanced Reactor Programs i
Westinghouse Electric Corporation Nuclear Energy Institute Energy Systems Business Unit 1776 Eye Street, N.W.
P.O. Box 355 Suite 300 Pittsburgh, PA 15230 Washington, DC 20006-3706 Ms. Cindy L. Haag Ms. Lynn Connor Advanced Plant Safety & Licensing Doc-Search Associates Westinghouse Electric Corporation Post Office Box 34 Energy Systems Business Unit Cabin John, MD 20818 Box 355 Pittsburgh, PA 15230 Mr. James E. Quinn, Projects Manager LMR and SBWR Programs Mr. M. D. Beaumont GE Nuclear Energy Nuclear and Advanced Technology Division 175 Curtner Avenue, M/C 165 Westinghouse Electric Corporation San Jose, CA 95125 One Montrose Metro 11921 Rockville Pike Mr. Robert H. Buchholz Suite 350 GE Nuclear Energy Rockville, MD 20852 175 Curtner Avenue, MC-781 San Jose, CA 95125 Mr. Sterling Franks U.S. Department of Energy Barton Z. Cowan, Esq.
NE-50 Eckert Seamans Cherin & Mellott 19901 Germantown Road 600 Grant Street 42nd Floor Germantown, MD 20874 Pittsburgh, PA 15219 Mr. S. M. Modro Mr. Ed Rodwell, Manager Nuclear Systems Analysis Technologies PWR Design Certification i
Lockheed Idaho Technologies Company Electric Power Research Institute Post Office Box 1625 3412 Hillview Avenue Idaho Falls, ID 83415 Palo Alto, CA 94303 Mr. Frank A. Ross Mr. Charles Thompson, Nuclear Engineer U.S. Departmer.t of Energy, NE-42 AP600 Certification Office of LWR Safety and Technology NE-50 19901 Germantown Road 19901 Germantown Road Germantown, MD 20874 Germantown, MD 20874
~
Comments on Chapter 18 (Human Factors Engine 6 ring)
AP600 SSAR, Revision 11 and Related 6, CAPS 1.
p.18.1.2-- omission. There should be a reference to minimum inventory for the RSW in addition to the MCR.
2.
p.18.1-4-- omission. Same as fl.
3.
p.18.2-1-- inconsistency.
" Human Factors Engineering Design Team" and (later, on p. 18.2-4) "HSI Design Team".
4.
p.18-2-12-- inconsistency.
" Plant instrumentation and controls system (PI&CS) vs " instrumentation and control systems..." on p 18.2-21 (fig. 18.2-2).
j 5.
p.18.2-19-- How does the statement in 18.2.6 relate to this section of the SSAR7 COL must cover more than merely being responsible for its location. COL must be responsible for carrying out the HFE Program and post-certification review responsibilities of the design.
6.
p.18.4-2-- omission. COL item. Westinghouse should be providing results of FAA to COL e.g., any " mandated" requirements re:
automation should be i
made krown to COL.
j 7.
p.18.8-1-- inconsistency. HSI coverage states that HSI covers operation and control centers (MCR; TSC; RSW; OSC; local control, stations and associated workstations for each center). This is inconsistent with descriptions that are on pages 18.2-4, and 18.2.1-3.
8.
p.18.8-17-- inconsistency.
Reference to figure 6.4.1 and workstations.
Nothing on the figure identifies either the supervisor's workstation or reactor operator workstations A and B.
9.
p.18.8-18-- Where (on figure 6.4-1) is the " dedicated safety panel?
l 10.
p.18.ll-1-- inconsistency.
Between title (and the level of review) and the first sentence that describes a " plan".
i 11.
p.18.ll-1-- inconsistency.
" human system interface design test program" vs " human systems interface design test program" vs " human system interface test program".
12.
p.18.ll-1-- inconsistency. Text (p. 18.11-1) refers to figure 18.11-1 as
" test program" vs " human systems interface design test program" vs " human L
system interface test program"
- 13. WCAP-14651, Rev.1-- inconsistency. Title is " Implementation Plan".
Page 1-1 refers to the " integration / implementation plan".
l Enclosure 4
e 14. WCAP-14701-- inconsistency. Reference, p.8-1, of the WCAP to the WCAP-14396, Rev. O, is incorrect. WCAP-14396 is at Rev. 2, currently.
- 15. WCAP-14701--- p.1-2, Figure 1, is the same figure as 18.8-2 but, it now has a different title. See also, description on p. 18.8-5 of the test program.
- 16. WCAP-14701--inconsistency. Page 1-2, Figure 5, title, is inconsistent with figure 18.8-3, p.18.8-30.
- 17. WCAP-14401 (Rev. 2)-- p.1-1.
Potential inconsistency between " final plant HFE design verification" (terminology) and "HFE design verifica-tion" (terminology may need changing).
i s
i J
i i
1
-