Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138B841 + (01:04:28, 12 December 2024)
- ML20138B840 + (01:04:28, 12 December 2024)
- ML20138B836 + (01:04:29, 12 December 2024)
- ML20138B834 + (01:04:30, 12 December 2024)
- ML20138B833 + (01:04:30, 12 December 2024)
- ML20138B831 + (01:04:31, 12 December 2024)
- 05000213/LER-1985-013, :on 850916,licensee Discovered Rod Misalignment Power Peaking Penalty Not Imposed on Fuel Cycle Design & Safety Analysis.Caused by Inadequacy of Design Requirements. Allowable Axial Offset Limit Reduced + (01:04:33, 12 December 2024)
- NSD-NRC-97-5081, Forwards Proprietary Presentation Matl from 970312 Meeting W/Staff Re Long Term Cooling.Proprietary Encl Withheld,Per 10CFR2.790.Nonproprietary Presentation Also Encl + (01:04:34, 12 December 2024)
- ML20138B826 + (01:04:35, 12 December 2024)
- 05000454/LER-1997-014, :on 960903,failure to Comply W/Design Basis Due to Degradation of Boraflex in Sf Racks Was Identified.Review of SFP Criticality Analysis & Addl Controls & Reviews of Externally Generated Calculations Established + (01:04:37, 12 December 2024)
- ML20138B822 + (01:04:38, 12 December 2024)
- ML20138B821 + (01:04:38, 12 December 2024)
- ML20138B820 + (01:04:39, 12 December 2024)
- AECM-86-0078, Withdraws 851011 Application for Amend to License NPF-29 Re Installation of Air Receiver Pressure Indication. Requirements of License Condition 2.c.(33)g Will Be Fulfilled Prior to Startup from First Refueling + (01:04:40, 12 December 2024)
- ML20138B818 + (01:04:40, 12 December 2024)
- ML20138B814 + (01:04:41, 12 December 2024)
- ML20138B813 + (01:04:42, 12 December 2024)
- NSD-NRC-97-5085, Submits Westinghouse Responses to NRC Questions & Comments Re AP600 Ts,For SSAR + (01:04:45, 12 December 2024)
- ML20138B809 + (01:04:48, 12 December 2024)
- 05000369/LER-1997-003-02, :on 970326,both Trains of Control Room Ventilation Sys Inoperable Due to Isolated Air Intake Valves.Radiation Monitor Will Be Evaluated to Determine If Changes Are Needed in Design or Maint + (01:04:50, 12 December 2024)
- ML20138B806 + (01:04:51, 12 December 2024)
- HL-5355, Informs That Review of Mods to Logic Circuits for Rps,Dg Loading Shedding & Load Sequencing & Actuation Logic for ECCS Was Completed on 970331,per GL 96-01 + (01:04:52, 12 December 2024)
- ML20138B805 + (01:04:52, 12 December 2024)
- ML20138B801 + (01:04:53, 12 December 2024)
- 05000293/LER-1997-008, :on 970312,setpoint of Target Rock Relief Valve Pilot Assembly Was Out of Tolerance During Testing,Due to Setpoint Drift.Valve Was Disassembled,Inspected & Reworked by Target Rock Corp Personnel + (01:04:55, 12 December 2024)
- ML20138B798 + (01:04:56, 12 December 2024)
- ML20138B793 + (01:04:57, 12 December 2024)
- ML20138B795 + (01:04:57, 12 December 2024)
- ML20138B792 + (01:04:58, 12 December 2024)
- ML20138B790 + (01:04:59, 12 December 2024)
- ML20138B791 + (01:04:59, 12 December 2024)
- ML20138B787 + (01:05:00, 12 December 2024)
- ML20138B786 + (01:05:01, 12 December 2024)
- ML20138B784 + (01:05:02, 12 December 2024)
- ML20138B783 + (01:05:03, 12 December 2024)
- IR 05000352/1985035 + (01:05:07, 12 December 2024)
- IR 05000298/1985023 + (01:05:08, 12 December 2024)
- ML20138B777 + (01:05:08, 12 December 2024)
- ML20138B774 + (01:05:09, 12 December 2024)
- ML20138B772 + (01:05:09, 12 December 2024)
- ML20138B769 + (01:05:10, 12 December 2024)
- ML20138B766 + (01:05:10, 12 December 2024)
- 05000245/LER-1997-015-01, :on 970321,inadvertent Actuation of Group Six Containment Isolation Identified Due to Noise Spike Generated from Maint Activities.Bypass Containment Hrrm to Preclude Inadvertent High Radiation Alarms & Actuations + (01:05:12, 12 December 2024)
- PNO-III-86-025A, ultrasonic Testing Identified Cracks in Shafts of Two Pumps.Cracks Suspected in Two Other Pump Shafts.Replacement of Four Reactor Coolant Pump Shafts Will Delay Startup Until mid-Oct 1986 + (01:05:13, 12 December 2024)
- ML20138B761 + (01:05:14, 12 December 2024)
- ML20138B760 + (01:05:15, 12 December 2024)
- ML20138B756 + (01:05:16, 12 December 2024)
- ML20138B757 + (01:05:16, 12 December 2024)
- 2CAN038607, Forwards Revised Schedule for Completion of Inadequate Core Cooling Sys Milestones (NUREG-0737,Item II.F.2). Qualification Program for in-containment Cabling & Connectors for Core Exit Thermocouples Currently Underway + (01:05:17, 12 December 2024)
- ML20138B753 + (01:05:18, 12 December 2024)
- ML20138B752 + (01:05:19, 12 December 2024)
- ML20138B750 + (01:05:19, 12 December 2024)