ML20138B766
| ML20138B766 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 03/20/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Pilant J NEBRASKA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20138B771 | List: |
| References | |
| NUDOCS 8603250155 | |
| Download: ML20138B766 (2) | |
See also: IR 05000298/1985023
Text
.
.
MAR 2 01906
In Reply Refer To:
Docket:
50-298/85-23
Nebraska Public Power District
ATTN:
J. M. Pilant, Manager, Technical
Staf f-Nuclear Power Group
P. O. Box 499
Columbus, Nebraska 68601
Gentlemen:
This refers to the inspection conducted by James A. F. Kelly and Ronald A.
Caldwell of this office during the period July 29 through August 2 and
August 12-16, 1985, of activities authorized by NRC Operating License DPR-46
for Cooper Nuclear Station, and to the discussion of our findings with
Mr. P. V. Thomason, and other members of your staff at the conclusion of the
inspection.
Areas examined during the inspection related to the effectiveness of the
physical security program. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the inspectors.
These findings are documented
in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
The violations reported in paragraphs 4, 5, 6,
and 8 of the enclosed inspection report were discussed with you at an
enforcement conference held in the Region IV office in Arlington, Texas, on
December 17, 1985.
Any enforcement action resulting from this inspection will
be forwarded to you under separate cover.
There are two areas of concern identified in the enclosed report as unresolved
items pending further review by Region IV management.
These items may be the
subject of separate enforcement actions.
The material enclosed herewith contains Safeguards Information as defined by
10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited
by Section 147 of the Atomic Energy Act of 1954, as amended.
Therefore, the
material, with the exception of the report cover page which is an inspection
summary, will not be placed in the Public Document Room.
,
EW50TI200hTAUG
S!8:~CJA2DS IE"01'J3IO:7.
UPOU STEARATI'J 7 DIS
W (n; IS LYa XI M M J 2 3.
[
_.
f/ ['
j
MV:PSS
PSS
C:EP&
g
D:
S&S
C:RPS
C:RPB
E0
g//gartJPJqu(A
JAK 11y;ap
RACa
ell
LYand
$$/86}/GagliardoDAPowersJ /q /86
L
RLB
don .
9
3/i(/86
ggp/86
1/
86
A/g/86
/86
8
fy
I
esosasoies8j;o8$be
l
ADOCK O
G
N%
s
.
Nebraska Public Power District
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
8WTainaf stened tm
W. C. HAl.L"
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosure:
Appendix - NRC Inspection Report
50-298/85-23
cc w/ summary page only:
Paul V. Thomason Division Manager
of Nuclear Operations
Cooper Nuclear Station
P.O. Box 98
Brownville, Nebraska 68321
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bcc: Copy of entire report maintained in RIV Security File and sent to:
G. McCorkle, NMSS
J. Gibson, SSPD/NRR
IE File
Resident Inspector (w/766)
R. Martin
Security Inspector
Chief, EPSPS
D. Powers, E0
bcc: RIV - Letter and Inspection Summary only w/766:
RPB
D. Weiss, LFMB (AR-2015)
.
Section Chief (RPSA)
MIS
R&SPB
RIV File
RSTS Operator
/DMBIE-04RIV - Letter and Inspection Summary only w/out 766:
cc:
R. L. Bangart, DRS&S
E. H. Johnson, DRS&P
2BfCLOSua:B CONTAINS
gyspump5 Iyramp.TI0ti.
Upos REF1% TION THIS
PAGEIsIs00erm& tad.