Forwards Insp Rept 50-298/85-23 on 850729-0802 & 12-16. Violations Discussed at 851217 Enforcement Conference in Region Iv.Enforcement Action Will Be Forwarded Under Separate Cover
ML20138B766
Person / Time
Site: Cooper Entergy icon.png
Issue date: 03/20/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20138B771 List:
References
NUDOCS 8603250155
Download: ML20138B766 (2)


See also: IR 05000298/1985023

Text

.

.

MAR 2 01906

In Reply Refer To:

Docket: 50-298/85-23

Nebraska Public Power District

ATTN: J. M. Pilant, Manager, Technical

Staf f-Nuclear Power Group

P. O. Box 499

Columbus, Nebraska 68601

Gentlemen:

This refers to the inspection conducted by James A. F. Kelly and Ronald A.

Caldwell of this office during the period July 29 through August 2 and

August 12-16, 1985, of activities authorized by NRC Operating License DPR-46

for Cooper Nuclear Station, and to the discussion of our findings with

Mr. P. V. Thomason, and other members of your staff at the conclusion of the

inspection.

Areas examined during the inspection related to the effectiveness of the

physical security program. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews with

personnel, and observations by the inspectors. These findings are documented

in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. The violations reported in paragraphs 4, 5, 6,

and 8 of the enclosed inspection report were discussed with you at an

enforcement conference held in the Region IV office in Arlington, Texas, on

December 17, 1985. Any enforcement action resulting from this inspection will

be forwarded to you under separate cover.

There are two areas of concern identified in the enclosed report as unresolved

items pending further review by Region IV management. These items may be the

subject of separate enforcement actions.

The material enclosed herewith contains Safeguards Information as defined by

10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited

by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the

material, with the exception of the report cover page which is an inspection

,

summary, will not be placed in the Public Document Room.

EW50TI200hTAUG

S!8:~CJA2DS IE"01'J3IO:7.

UPOU STEARATI'J 7 DIS

W (n; IS LYa XI M M J 2 3.

[ j _. f / ['

MV:PSS

JAK9 11y;ap

PSS C:EP&

LYand

D: S&S C:RPS

don .

C:RPB E0 g

ggp/86

RACa

1/ 86

ell

A/g/86 g//gartJPJqu(A

RLB

/86 $$/86}/GagliardoDAPowersJ

3/i(/86 /q /86

L

fy 8

I l

esosasoies8j;o8$be

PDR ADOCK O PDR

G N%

s

.

Nebraska Public Power District -2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

8WTainaf stened tm

W. C. HAl.L"

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosure:

Appendix - NRC Inspection Report

50-298/85-23

cc w/ summary page only:

Paul V. Thomason Division Manager

of Nuclear Operations

Cooper Nuclear Station

P.O. Box 98

Brownville, Nebraska 68321

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bcc: Copy of entire report maintained in RIV Security File and sent to:

G. McCorkle, NMSS

J. Gibson, SSPD/NRR

IE File

Resident Inspector (w/766)

R. Martin

Security Inspector

Chief, EPSPS

D. Powers, E0

bcc: RIV - Letter and Inspection Summary only w/766:

. RPB D. Weiss, LFMB (AR-2015)

Section Chief (RPSA) MIS

R&SPB RIV File RSTS Operator

cc:

/DMBIE-04RIV - Letter R.andL. Inspection Summary only w/out

Bangart, DRS&S E. H.766:

Johnson, DRS&P

2BfCLOSua:B CONTAINS

gyspump5 Iyramp.TI0ti.

Upos REF1% TION THIS

PAGEIsIs00erm& tad.