Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138H962 + (00:12:13, 12 December 2024)
- ML20138H960 + (00:12:15, 12 December 2024)
- ML20138H957 + (00:12:16, 12 December 2024)
- PNO-III-85-092A, on 851023,unit Shut Down Due to High Neutron Flux During Startup.Insp Team Concluded That Reactor Sys Equipment Functioned Acceptably.Electronic Circuit Cards Replaced + (00:12:16, 12 December 2024)
- ML20138H954 + (00:12:17, 12 December 2024)
- ML20138H950 + (00:12:18, 12 December 2024)
- ML20138H949 + (00:12:19, 12 December 2024)
- ML20138H948 + (00:12:20, 12 December 2024)
- ML20138H945 + (00:12:22, 12 December 2024)
- ML20138H947 + (00:12:22, 12 December 2024)
- ML20138H942 + (00:12:23, 12 December 2024)
- ML20138H944 + (00:12:23, 12 December 2024)
- ML20138H941 + (00:12:24, 12 December 2024)
- ML20138H938 + (00:12:25, 12 December 2024)
- ML20138H937 + (00:12:27, 12 December 2024)
- ML20138H934 + (00:12:27, 12 December 2024)
- ML20138H931 + (00:12:28, 12 December 2024)
- ML20138H930 + (00:12:29, 12 December 2024)
- BSEP-97-0176, Responds to NRC Re Violations Noted in Insp Repts 50-324/97-02 & 50-325/97-02.Corrective Actions:Operations Shift Mgt Has Reaffirmed W/Appropriate Operations Personnel Mgt Expectations & Requirements for Continuous Use + (00:12:30, 12 December 2024)
- ML20138H926 + (00:12:30, 12 December 2024)
- ML20138H922 + (00:12:31, 12 December 2024)
- ML20138H920 + (00:12:32, 12 December 2024)
- ML20138H921 + (00:12:32, 12 December 2024)
- ML20138H914 + (00:12:34, 12 December 2024)
- 05000305/LER-1985-020, :on 851113,failure of Train a Main Feedwater Control Valve Caused lo-lo Water Level in Steam Generator 1A & Reactor Trip.Caused by Two of Four Cap Screws Holding Valve Actuator to Yoke Shearing + (00:12:36, 12 December 2024)
- ML20138H910 + (00:12:37, 12 December 2024)
- ML20138H908 + (00:12:38, 12 December 2024)
- ML20138H903 + (00:12:39, 12 December 2024)
- ML20138H901 + (00:12:40, 12 December 2024)
- ML20138H900 + (00:12:41, 12 December 2024)
- ML20138H899 + (00:12:41, 12 December 2024)
- ML20138H895 + (00:12:42, 12 December 2024)
- ML20138H894 + (00:12:43, 12 December 2024)
- ML20138H892 + (00:12:44, 12 December 2024)
- IR 05000336/1995201 + (00:12:45, 12 December 2024)
- ML20138H890 + (00:12:46, 12 December 2024)
- ML20138H886 + (00:12:47, 12 December 2024)
- ML20138H885 + (00:12:48, 12 December 2024)
- ML20138H883 + (00:12:49, 12 December 2024)
- ML20138H878 + (00:12:50, 12 December 2024)
- AECM-85-0404, Application for Amend to License NPF-29,revising Tech Spec 6.3.1 to Allow one-time Exception Re Qualifications of Chemistry/Radiation Control Superintendent + (00:12:51, 12 December 2024)
- ML20138H876 + (00:12:51, 12 December 2024)
- ML20138H871 + (00:12:52, 12 December 2024)
- ML20138H872 + (00:12:52, 12 December 2024)
- ML20138H866 + (00:12:53, 12 December 2024)
- 3F0597-21, TS Change Request 212,Rev 1 Replacing Prescriptive Requirements of 10CFR50,App J,Option a w/performance-based Approach to Leakage Testing Contained in 10CFR50,App J, Option B + (00:12:54, 12 December 2024)
- B16434, Retracts Commitment Made to Update & Submit Periodically, Plant Readiness-for-Restart List + (00:12:55, 12 December 2024)
- ML20138H861 + (00:12:55, 12 December 2024)
- ML20138H855 + (00:12:56, 12 December 2024)
- ML20138H854 + (00:12:57, 12 December 2024)
- ML20138H853 + (00:12:57, 12 December 2024)