ML20138H926
| ML20138H926 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 12/06/1985 |
| From: | Edelman M CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| PY-CEI-OIE-140, NUDOCS 8512170373 | |
| Download: ML20138H926 (2) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _
,,4*
b rn t3 THE CLEVELAND ELECTRIC ILLUMIN ATING COMP ANY P.O. BOX $000 - CLEVELAdo. OHIO 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BloG.
55 PUBLICSQUARE Serving The Best Location in the Nation MURRAY R. EDELMAN December 6, 1985 VICE PRESIDENT PY-CEI/0IE 140 L NUCLEAR Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Reosevelt Road Glen Ellyn Illinois 60137 RE: Perry Nuclear Power Plant Docket No. 50-441 Significant Deficiency Reporting Commitments
Dear Mr. Keppler:
This letter serves as the final reports pursuant to 10CFR50.55(e) for Deviation Analysis Reports (DAR) 106, 127, and 153 which are applicable only to Perry Nuclear Power Plant (PNPP) Unit 2.
In each case Unit i resolution has already been effected. The final report on DAR 106 for Unit I was filed on April 26, 1984. The final report on DAR 127 for Units 1 and 2 was filed on June 10,'
1983, as modified by letters dated December 21, 1983 and June 7, 1984. The final report on DAR 153 for Unit 1 was filed on June 14, 1984.
For each of -these DAR's, the description of deficiency and analysis of safety implications remains as documented in the final reports referenced above. The corrective action activities noted in each final report will be implemented as necessary for Unit 2 on a schedule consistent with Unit 2 construction.
This information is being provided to fulfill previous filing commitments and to ensure that the Unit 2 record is accurate. Future filings pursuant to 10CFR50.55(e) applicable to presently identified Unit 2 construction deficiency reports will be made consistent with the PNPP Unit 2 construction schedule.
If there are any questions, please call.
Sincerely.
AW Murray R. Edelm Vice President Nuclear Group MRE:sab h21{ DOCK 05000440 0373 851206 S
PDR h
q& \\\\*
Iea7
rQ
- Mr. James G. Kcppler - Dactabar 6.1985 FY-CEI/0IE 140 L L
' cc: - Mr.. J. A. Grobe USNRC. Site Office (SBB50) f Director 0ffice of Inspection and Enforcement U.S. Nuclear Regulatory Commission
~
Washington, D.C. ' 20055 U.S.' Nuclear Regulatory Commission Document Control Desk
- Washington, D.C.
20555 Records Center. SEE-IN '
Institute of Nuclear Power Operations-1100 Circle 75 Parkway. Suite 1500 Atlanta, Georgia 30339 Y