Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20140D024 + (22:00:24, 11 December 2024)
- 05000323/LER-1985-024-01, :on 851225,automatic Reactor & Turbine Trips Occurred During Full Load Rejection Test.Caused by Slow Response of Steam Dump Control Sys.Sys Modified to Improve Steam Dump Valve Response Time + (22:00:34, 11 December 2024)
- ML20140D015 + (22:00:39, 11 December 2024)
- ML20140D016 + (22:00:39, 11 December 2024)
- 05000316/LER-1985-043-01, :on 851227,auxiliary Bldg Ventilation Grab Sample Not Obtained within Time Restraints in Tech Spec 3.3.3.10,Table 3.3-13 Action Item 28.Caused by Personnel Error.Administrative Action Taken + (22:00:47, 11 December 2024)
- 05000254/LER-1997-005-03, :on 970319,HPCI Subsystem Was Made Inoperable to Protect Equipment Due to Uncertainties Re Abandoned Power Feed Cable,Which Had Been Inappropriately Abandoned. Plant Design Documents Have Been Updated + (22:00:49, 11 December 2024)
- ML20140D004 + (22:00:54, 11 December 2024)
- ML20140D008 + (22:00:54, 11 December 2024)
- 05000254/LER-1997-005, Forwards LER 97-005-00 IAW Requirements of 10CFR50.73(a)(2)(v)(D) W/Listed Commitments + (22:00:55, 11 December 2024)
- ML20140D001 + (22:00:56, 11 December 2024)
- IR 05000334/1985027 + (22:01:03, 11 December 2024)
- ML20140C999 + (22:01:04, 11 December 2024)
- ML20140C998 + (22:01:05, 11 December 2024)
- ML20140C997 + (22:01:06, 11 December 2024)
- 05000219/LER-1985-025, :on 851216,inadvertent Automatic Main Steam Line Isolation Occurred During Startup Activities.Caused by Operator Cognitive Error.Operator Training Re Event Will Be Initiated + (22:01:10, 11 December 2024)
- NPL-97-0297, Provides Summary of ECCS Evaluation Model Changes & Errors Identified Since Last Rept + (22:01:11, 11 December 2024)
- ML20140C994 + (22:01:12, 11 December 2024)
- ML20140C993 + (22:01:13, 11 December 2024)
- ML20140C991 + (22:01:13, 11 December 2024)
- ML20140C990 + (22:01:14, 11 December 2024)
- 05000265/LER-1997-003-04, :on 970321,2B Core Spray Room Cooler Fouled Due to Hydrolyzing Debris.Cs Room Cooler Was Cleaned Under Nwr 960039336-01 & Qctp 1110-12, ECCS Room Cooler Trending Program, Has Recently Been Rewritten + (22:01:16, 11 December 2024)
- ML20140C988 + (22:01:16, 11 December 2024)
- 05000458/LER-1985-058, :on 851218,RWCU Sys Isolation Occurred.Caused by RWCU Temp Switch Module Malfunction.Malfunction Due to Internal Capacitor Failure.Temp Switch Replaced & Sys Returned to Svc + (22:01:19, 11 December 2024)
- ML20140C981 + (22:01:20, 11 December 2024)
- 05000298/LER-1986-003, :on 860220,functional Section of Surveillance Procedure 6.1.29 Re APRM Sys Not Performed as Required by Tech Specs.Caused by Rev to Surveillance Testing Schedule. Surveillance Procedure Performed + (22:01:25, 11 December 2024)
- ML20140C977 + (22:01:26, 11 December 2024)
- NSD-NRC-97-5165, Submits Changes to W Response to Open Item That Requested Info on Critical Sections That Committed to Providing Design Summary Rept for Nuclear Island Basemat.Rev Includes Changes to Subsection 3.8.5 + (22:01:27, 11 December 2024)
- ML20140C975 + (22:01:27, 11 December 2024)
- ML20140C970 + (22:01:30, 11 December 2024)
- ML20140C971 + (22:01:30, 11 December 2024)
- ML20140C968 + (22:01:31, 11 December 2024)
- IR 05000289/1985028 + (22:03:35, 11 December 2024)
- ML20140C964 + (22:03:36, 11 December 2024)
- ML20140C962 + (22:03:38, 11 December 2024)
- ML20140C960 + (22:03:39, 11 December 2024)
- 05000251/LER-1985-026-01, :on 851224,480-volt Power Supply Breaker to Backup Group 4A Pressurizer Heaters Discovered to Have No Light Indication.Caused by Backing Off Action by Arcing Contacts.Breaker Manually Tripped + (22:03:41, 11 December 2024)
- NSD-NRC-97-5166, Resubmits AP600 Design Certification Fire Protection Open Items,Marked Up to Reflect Resolution of Comments Received from NRC During Joint Fire Protection Meetings + (22:03:43, 11 December 2024)
- ML20140C954 + (22:03:47, 11 December 2024)
- ML20140C953 + (22:03:48, 11 December 2024)
- ML20140C951 + (22:03:48, 11 December 2024)
- ML20140C949 + (22:03:49, 11 December 2024)
- 05000528/LER-1985-047, :on 850702,fire Watch Performed Late on Main Steam Support Structure.Caused by Personnel Not Gaining Timely Access to Area.Priority Given to Fire Watch Access.W/ + (22:03:51, 11 December 2024)
- ML20140C947 + (22:03:52, 11 December 2024)
- 05000266/LER-1986-001, :on 860102,during Full power,20% Turbine Runback Experienced.Caused by Voltage Spike in Channel 44 of Power Range Instrumentation Sys Due to Faulty 25-volt Power Supply.Power Supply Replaced + (22:03:59, 11 December 2024)
- ML20140C944 + (22:04:03, 11 December 2024)
- ML20140C943 + (22:04:04, 11 December 2024)
- RBG-43852, Monthly Operating Rept for Mar 1997 for River Bend Station Unit 1 + (22:04:05, 11 December 2024)
- ML20140C941 + (22:04:06, 11 December 2024)
- 05000312/LER-1985-024, :on 851222,RCS Leakage Calculated to Be Between 15 & 20 Gallons Per Minute.Shutdown Initiated.Caused by Leaking Packing Gland SFV-70001.Gland Disassembled & Inspected.Twelve Rings of Packing Added + (22:04:08, 11 December 2024)
- ML20140C937 + (22:04:10, 11 December 2024)
- ML20140C933 + (22:04:11, 11 December 2024)