Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20149G400 + (14:33:20, 11 December 2024)
- ML20149G394 + (14:33:21, 11 December 2024)
- IR 05000289/1988002 + (14:33:22, 11 December 2024)
- ML20149G391 + (14:33:23, 11 December 2024)
- B12819, Responds to 880205 Request for Addl Info Re Reactor Protection Sys Upgrade.Meeting Arranged W/Nrc on 880210 at White Flint Ofcs.Util Maintains RPS Upgrade Meets 10CFR50.59 Requirements & Does Not Need Prior Approval + (14:33:24, 11 December 2024)
- ML20149G384 + (14:33:27, 11 December 2024)
- ML20149G381 + (14:33:27, 11 December 2024)
- PNO-II-88-011, on 880206,slight Positive Pressure Created in Primary Drain Tank Due to Large Vol of Water & Overhead Gas Compressor Inoperable,Causing Gaseous Leak in Auxiliary Bldg.Cause Not Stated + (14:33:28, 11 December 2024)
- ML20149G375 + (14:33:29, 11 December 2024)
- ML20149G371 + (14:33:30, 11 December 2024)
- HL-4587, Application for Amends to Licenses DPR-57 & NPF-5,lowering ATWS-RPT Setpoint & Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained + (14:33:31, 11 December 2024)
- ML20149G367 + (14:33:31, 11 December 2024)
- ML20149G361 + (14:33:33, 11 December 2024)
- IR 05000482/1997009 + (14:33:37, 11 December 2024)
- ML20149G350 + (14:33:39, 11 December 2024)
- ML20149G347 + (14:33:40, 11 December 2024)
- ML20149G346 + (14:33:41, 11 December 2024)
- ML20149G345 + (14:33:41, 11 December 2024)
- ML20149G343 + (14:33:42, 11 December 2024)
- ML20149G341 + (14:33:43, 11 December 2024)
- ML20149G337 + (14:33:43, 11 December 2024)
- ML20149G332 + (14:33:45, 11 December 2024)
- ML20149G326 + (14:33:46, 11 December 2024)
- IR 05000424/1987069 + (14:34:03, 11 December 2024)
- ML20149G323 + (14:34:04, 11 December 2024)
- ML20149G322 + (14:34:05, 11 December 2024)
- IR 05000285/1997011 + (14:34:06, 11 December 2024)
- ML20149G318 + (14:34:06, 11 December 2024)
- ML20149G316 + (14:34:08, 11 December 2024)
- ML20149G311 + (14:34:09, 11 December 2024)
- ML20149G309 + (14:34:10, 11 December 2024)
- RC-97-0128, Requests Exemption from Requirements of 10CFR70.24(a), Criticality Accident Requirements + (14:34:11, 11 December 2024)
- BVY-94-100, Transmits Summary Rept Related to 10CFR50,App R Lighting Issue Recently Discovered at Plant.Related Procedures Reviewed & Concluded That Existing Procedures & Training Adequate to Achieve Safe Shutdown in Event of Fire + (14:34:12, 11 December 2024)
- ML20149G304 + (14:34:12, 11 December 2024)
- 05000370/LER-1987-018-01, :on 870921,inoperable Fire Barrier Due to Wall Section Being Constructed W/O Proper End Connection Found. Caused by Const/Installation Deficiency.Four Fire Barriers Which Were Inoperable Were Repaired + (14:34:14, 11 December 2024)
- ML20149G300 + (14:34:16, 11 December 2024)
- PY-CEI-NRR-1834, Forwards Rev 19 to Security Plan.Changes in Rev Made,Per 10CFR50.54(p).Rev Withheld + (14:34:16, 11 December 2024)
- ML20149G298 + (14:34:17, 11 December 2024)
- IR 05000361/1997008 + (14:34:18, 11 December 2024)
- U-602354, Monthly Operating Rept for Sept 1994 for Clinton Power Station Unit 1 + (14:34:18, 11 December 2024)
- 1CAN109401, Monthly Operating Rept for Sept 1994 for ANO Unit 1 + (14:34:19, 11 December 2024)
- ML20149G293 + (14:34:20, 11 December 2024)
- SVP-94-048, Forwards Response to Violations Noted in Insp Repts 50-456/94-18 & 50-457/94-18.Response Withheld + (14:34:20, 11 December 2024)
- ML20149G291 + (14:34:21, 11 December 2024)
- PY-CEI-NRR-1871, Monthly Operating Rept for Sept 1994 for Perry Nuclear Power Plant + (14:34:22, 11 December 2024)
- ML20149G289 + (14:34:22, 11 December 2024)
- ML20149G285 + (14:34:23, 11 December 2024)
- ST-HL-AE-2500, Application for Amend to License NPF-71,revising Tech Spec 3.5.3.1 to Clarify Limiting Condition for Operation for High Head Safety Injection Pumps in Mode 4.Fee Paid + (14:34:24, 11 December 2024)
- 2CAN109403, Monthly Operating Rept for Sept 1994 for ANO Unit 2 + (14:34:25, 11 December 2024)
- NRC-94-0085, Monthly Operating Rept for Sept 1994 for Fermi 2 + (14:34:26, 11 December 2024)
- ML20149G281 + (14:34:26, 11 December 2024)