Monthly Operating Repts for Sept 1994 for Vogtle Electric Generating Plant Units 1 & 2
ML20149G361
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/30/1994
From: Hooper G, Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-0360-F, LCV-360-F, NUDOCS 9410200295
Download: ML20149G361 (12)


Text

{ l e~ Guof ga Power Company 40 insemen Centm N nay

  • Fou oM-ce Boe 1295 '

B.rmingham, AiaLama 30201 l lofephorse 205 877 71?? l L

C. K, McCoy Georgia Power i vce Prewt nuc%r  !

vagne ero* October 13, 1994 *"""*"*""

LCV-0360-F . . ,

. 3 I /

Docket Nos. 50-424

  • \>

50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 l l

Gentlemen: l VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT Enclosed are the September 1994, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with Technical Specification 6.8.1.5.

Sincerely, C. K. McCoy CKM/JLL Enclosures cc: Georgi _a_ Power Compa_ny Mr. J. B. Beasley, Jr.

Mr. M. Sheibani NORMS U. S. Nuclear __ Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Ilood, Licensing Project Manager, NRR Mr. II. R. Bonser, Senior Resident Inspector, Vogtle 190114 f 9410200295 94o930 PDR ADOCK oS000424 I l R PDR

v. _

ENCLOSURE 1  ;

VOGTLE ELECTRIC GENERATING PLANT - UNIT I MONTHLY OPERATING REPORT FOR SEPTEMBER 1994 TABLE OF CONTENTS q NARRATIVE REPORT Page Vl-1 OPERATING DATA REPORT Page Vl-2 AVERAGE DAILY POWER LEVEL Page VI-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page VI-4 a

. _ _ _ _ _ m_ _ _ _ _ _ _ _ . _ _ _ . _ _ ._ _ _ _

, s NARRATIVE REPORT DOCKET NO. 50-424 UNIT 1 DATE: OCTOBER 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE: (706)826-4104 SEPTEMBER 01 00:00 UNIT 1 AT 78% POWER WITH COASTDOWN IN PROGRESS.

SEPTEMBER 10 19:20 UNIT 1 STARTED LOAD REDUCTION. j SEPTEMBER 10 23:46 UNIT 1 TURBINE MANUALLY TRIPPED.

SEPTEMBER 11 00:18 UNIT 1 ENTERED MODE 2.

SEPTEMBER 11 00:26 UNIT 1 COMMENCED REACTOR SHUTDOWN.

SEPTEMBER 11 00:36 UNIT 1 AUTOMATIC REACTOR TRIP DUE TO SPURIOUS SOURCE RANGE HIGH FLUX SEPTEMBER 11 08:43 UNIT 1 ENTERED MODE 4.

SEPTEMBER 11 21:28 UNIT 1 ENTERED MODE 5.

SEPTEMBER 17 01:43 UNIT 1 ENTERED MODE 6.

SEPTEMBER 20 03:08 UNIT 1 CORE OFFLOAD STARTED.

SEPTEMBER 22 23:34 UNIT 1 CORE OFFLOAD COMPLETED. ENTERED DEFUELED MODE.

SEPTEMBER 30 23:59 UNIT 1 IN DEFUELED MODE, PREPARATION FOR CORE RELOAD IN PROGRESS.  !

l i

l 1

i l

4 4 V1-1

~

l l

OPERATING DATA REPORT DCCKET NO. 50-424 .

DATE: OCTOBER 1,1994 i

~

COMPLETED BY: G. L. HOOPER i TELEPHONE: (706) 826-4104 OPERATING STATUS ,

1. UNIT NAME: VEGP UNIT 1 ,
2. REPORT PERIOD: SEPTEMBER 1994
3. LICENSED THERMAL POWER (MWt): 3565 ,
4. NAMEPLATE RATING (GROSS MWe): 1215
5. DESIGN ELECTRICAL RATING (NET MWe): 1169  :
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1223 l
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 1169
8. IF CHANGES OCCUR IN CAPACITY RATINGS i (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS
NA

- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe); NO RESTRICTIONS

.10. REASONS FOR RESTRICTION, IF ANY: NA l 5

THIS MONTH YR. TO DATE CUMULATIVE l

11. HOURS IN REPORTING PERIOD: 720 6551 64296
12. NUMBER OF HOURS REACTOR WAS CRITICAL: 240.6 6032.2 55907 3
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE: 239.8 6021.7 54894.6
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0  !
16. GROSS THERMAL ENERGY GENERATED (MWH): 629927 20776285 184497483 '!
17. GROSS ELEC. ENERGY GENERATED (MWH): 205011 7090349 62073311 i
18. NET ELEC. ENERGY GENERATED (MWH): 186761 6766219 59007511
19. REACTOR SERVICE FACTOR 33.4 % 92.1 % 87.0 % ,
20. REACTOR AVAILAP!LITY FACTOR 33.4 % 92.1 % 87.0 % ,
21. UNIT SERVICE FACTOR: 33.3 % 91.9 % 85.4% f
22. UNIT AVAILABILITY FACTOR: 33.3 % 91.9 % 85.4 %
23. UNIT CAPACITY FACTOR (USING MDC NET): 22.2 % 88.4 % 83.1% ' .
24. UNIT CAPACITY FACTOR (USING DER NET): 22.2 % 88.4 % 82.5 % l
25. UNIT FORCED OUTAGE RATE: 0.0% 0.8% 5.0%
26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

REFUELING, SEPT. 11,1994,34 DAYS

27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: OCT.15,1994 i

V1-2

', ~

UNIT 1 AVERAGE DAILY DOCKET NO. 50-424 POWER LEVEL DATE: OCTOBER 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE: (706) 826-4104 l 1

I DAY Net MW

1. . . 871  ;
2. . 864 '
3. 861
4. 849 l S. . 823
6. 793
7. 778
8. 768 i
9. .. . 764 l
10. 647 I
11. O i 12.. . O l 13.. . O l 14 . O j
15. . O I
16. 0
17. 0
18. . O j 19.. .. . 0
20. 0 21 , 0 j
22. . 0 l
23. O I 24 . 0
25. ... 0
26. . 0
27. 0
28. 0
29. 0
30. O V1-3
  • ~

~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50424 l DATE: OCTOBER 1,1994 l UNIT NAME: VEGP UNIT 1 COMPLETED BY: G. L. HOOPER <

TELEPHONE: (706) 826-4104 l I

l REPORT MONTH SEPTEMBER 1994 R M S E E Y l T A T LICENSEE SC Y S H EVENT TO COMPONENT CAUSE & CORRECTIVE P DURATION O O REPORT ED CODE ACTION TO NO. DATE E (HOURS) N D NUMBER ME (SUBCODE) PREVENT RECURRENCE 94-4 9/10 S 480.2 C/A 1/3 1-94-6 XX/:C >JJJXX/DET SEE BELOW F: FORCED REASON: METHOD: EVENTS REPORTED INVOLV S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%

B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE I C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR i D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.

E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)  :

G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN) l EVENT _9_4-4 CAUSE: DURING MANUAL PLANT SHUTDOWN FOR A PLANNED REFUELING OUTAGE, AN AUTOMATIC REACTOR TRIP FROM LESS THAN 1% POWER WAS CAUSED BY A SPURIOUS SOURCE RANGE HIGH FLUX SIGNAL. l l

CORRECTIVE ACTION: THE CAUSE OF THE AUTOMATIC TRIP WAS FOUND TO BE A LOOSE CAPACITOR IN l THE NI-0032 NEUTRON DETECTOR PRE-AMPLIFIER THAT CAUSED A SIGNAL SPIKE. THE PRE-AMPLIFIER WAS REPLACED, NI-0032 WAS RETURNED TO SERVICE AND THE REFUELING OUTAGE CONTINUED AS SCHEDULED. NO MAJOR SAFETY RELATED CORRECTIVE MAINTENANCE WAS PERFORMED DURING THIS OUTAGE PERIOD.

CRITICAL PATH WAS: COOLDOWN TO 200 DEG. F, RCS CLEANUP, BATTERY REPLACEMENT, REMOVAL OF REACTOR VESSEL HEAD AND INTERNALS, CORE OFFLOAD, STATION AUXILIARY TRANSFORMER TIE IN, l

ECCS FLOW TEST, REACTOR VESSEL FOSAR.

V1-4

ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR SEPTEMBER 1994 TABL,E OF CONTENTS NARRATIVE REPORT Page V2-1 '

OPERATING DATA REPORT Page V2-2 AVERAGE DAILY POWER LEVEL Page V2-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page V2-4

ri NARRATIVE REPORT DOCKET NO. 50-425 UNIT 2 DATE: OCTOBER 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE: (706) 826-4104 SEPTEMBER 01 00:00 UNIT 2 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

SEPTEMBER 30 23:59 UNIT 2 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

l I

l l

V2-1

OPERATING DATA REPORT DOCKET NO. 50-425 DATE: OCTOBER 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE: (706) 826-4104 OPERATING STATUS

1. UNIT NAME: VEGP UNIT 2
2. REPORT PERIOD: SEPTEMBER 1994
3. LICENSED THERMAL POWER (MWt): 3565
6. NAMEPLATE RATING (GROSS MWe): 1215
5. DESIGN ELECTRICAL RATING (NET MWe): 1169
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1223
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 1169
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: NA
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS
10. REASONS FOR RESTRICTION, IF ANY: NA THIS MONTH YR. TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD: 720 6551 47040
12. NUMBER OF HOURS REACTOR WAS CRITICAL: 720.0 5898.3 41938.7
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE: 720.0 5854.8 41381.2
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH): 2564313 20611850 137691348
17. GROSS ELEC. ENERGY GENERAi ED (MWH): 875657 7052952 46734989
10. NET ELEC. ENERGY GENERATED (MWH): 838937 6730902 44478379
19. REACTOR SERVICE FACTOR 100.0 % 90.0 % 89.2 %
20. REACTOR AVAILABILITY FACTOR 100.0 % 90.0% 89.2 %
21. UNIT SERVICE FACTOR: 100.0 % 89.4 % 88.0 %
22. UNIT AVAILABILITY FACTOR: 100.0 % 89.4 % 88.0 %
23. UNIT CAPACITY FACTOR (USING MDC NET): 99.7 % 87.9 % 84.6 %
24. UNIT CAPACITY FACTOR (USING DER NET): 99.7 % 87.9 % 84.7 %
25. UNIT FORCED OUTAGE RATE: 0.0% 6.6% 2.3%
26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

REFUELING, FEBRUARY 25,1995,40 DAYS

27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP : NA l

V2-2

UNIT 2 AVERAGE DAILY DOCKET NO. 50-425 POWER LEVEL DATE: OCTOBER 1,1994 l COMPLETED BY: G. L. HOOPER _

TELEPHONE: (706) 826-4104 DAY Net MW  !

1. . . 1152
2. . 1160
3. 1171 *
4. 1173
  • 5... .. 1173 *
6. . 1168
7. 1162
8. 1163 9.. . 1167
10. . 1161
11. 1159
12. . 1165 I
13. 1164
14. . . 1165
15. 1162
16. 1157
17. 1159
18. 1159 19 . . 1173 *
20. 1175
  • 21 . . .. 1171 *
22. 1173 *
23. . 1170
  • 24 . . 1161
25. . 1161
26. . 1164
27. 1167
28. . 1168
29. . 1166
30. 1169 *
  • MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS V2-3  !

1 l

l l

~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-425 DATE: OCTOBER 1,1994 I UNIT NAME: VEGP UNIT 2 COMPLETED BY: G. L. HOOPER )

TELEPHONE: (706) 826-4104 1

, REPORT MONTH SEPTEMBER 1994 i r i R M S E E Y ,

T A T LICENSEE SC Y S H EVENT TO COMPONENT CAUSE & CORRECTIVE P DURATION O O REPORT ED CODE ACTION TO NO. DATE E (HOURS) N D NUMBER ME (SUBCODE) PREVENT RECURRENCE NA NA NA NA NA NA NA NA NA NA F: FORCED REASON: METHOD: EVENTS REPORTED INVOLV S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%

B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.

E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)

G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN) 4 V2-4

ENCLOSURE 3 VOGTLE ELECTRIC GENERATING PLANT-UNITS 1 AND 2 CIIALLENGES TO PORV OR SAFETY VALVES DOCKET NOS. 50-424,504 25 DATE: OCTOBER 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE. (706) 826-4104 r

EVENT DATE TAG NO. TYPE DESCRIPTION NA NA NA NA J

l i

)