Monthly Operating Repts for Sept 1994 for Vogtle Electric Generating Plant Units 1 & 2
ML20149G361
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/30/1994
From: Hooper G, Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-0360-F, LCV-360-F, NUDOCS 9410200295
Download: ML20149G361 (12)


Text

{

l e~

Guof ga Power Company 40 insemen Centm N nay Fou oM-ce Boe 1295 B.rmingham, Ai Lama 30201 l

a lofephorse 205 877 71??

L Georgia Power i

C. K, McCoy vce Prewt nuc%r vagne ero*

October 13, 1994 LCV-0360-F 3

Docket Nos. 50-424 I

/

\\>

50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT Enclosed are the September 1994, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with Technical Specification 6.8.1.5.

Sincerely, C. K. McCoy CKM/JLL Enclosures cc:

Georgi _a_ Power Compa_ny Mr. J. B. Beasley, Jr.

Mr. M. Sheibani NORMS U. S. Nuclear __ Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Ilood, Licensing Project Manager, NRR Mr. II. R. Bonser, Senior Resident Inspector, Vogtle 190114 f

9410200295 94o930 PDR ADOCK oS000424 I l R

PDR

v.

ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT I MONTHLY OPERATING REPORT FOR SEPTEMBER 1994 TABLE OF CONTENTS q

NARRATIVE REPORT Page Vl-1 OPERATING DATA REPORT Page Vl-2 AVERAGE DAILY POWER LEVEL Page VI-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page VI-4 a

m

s NARRATIVE REPORT DOCKET NO. 50-424 UNIT 1 DATE:

OCTOBER 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706)826-4104 SEPTEMBER 01 00:00 UNIT 1 AT 78% POWER WITH COASTDOWN IN PROGRESS.

SEPTEMBER 10 19:20 UNIT 1 STARTED LOAD REDUCTION.

j SEPTEMBER 10 23:46 UNIT 1 TURBINE MANUALLY TRIPPED.

SEPTEMBER 11 00:18 UNIT 1 ENTERED MODE 2.

SEPTEMBER 11 00:26 UNIT 1 COMMENCED REACTOR SHUTDOWN.

SEPTEMBER 11 00:36 UNIT 1 AUTOMATIC REACTOR TRIP DUE TO SPURIOUS SOURCE RANGE HIGH FLUX SEPTEMBER 11 08:43 UNIT 1 ENTERED MODE 4.

SEPTEMBER 11 21:28 UNIT 1 ENTERED MODE 5.

SEPTEMBER 17 01:43 UNIT 1 ENTERED MODE 6.

SEPTEMBER 20 03:08 UNIT 1 CORE OFFLOAD STARTED.

SEPTEMBER 22 23:34 UNIT 1 CORE OFFLOAD COMPLETED. ENTERED DEFUELED MODE.

SEPTEMBER 30 23:59 UNIT 1 IN DEFUELED MODE, PREPARATION FOR CORE RELOAD IN PROGRESS.

i i

4 4

V1-1

~

OPERATING DATA REPORT DCCKET NO. 50-424 DATE:

OCTOBER 1,1994 i

COMPLETED BY: G. L. HOOPER i

~

TELEPHONE:

(706) 826-4104 OPERATING STATUS

1. UNIT NAME:

VEGP UNIT 1

2. REPORT PERIOD:

SEPTEMBER 1994

3. LICENSED THERMAL POWER (MWt):

3565

4. NAMEPLATE RATING (GROSS MWe):

1215

5. DESIGN ELECTRICAL RATING (NET MWe):

1169

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

1223 l

7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):

1169

8. IF CHANGES OCCUR IN CAPACITY RATINGS i

(ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe);

NO RESTRICTIONS

.10. REASONS FOR RESTRICTION, IF ANY:

NA l

5 THIS MONTH YR. TO DATE CUMULATIVE l

11. HOURS IN REPORTING PERIOD:

720 6551 64296

12. NUMBER OF HOURS REACTOR WAS CRITICAL:

240.6 6032.2 55907 3

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS GENERATOR ON-LINE:

239.8 6021.7 54894.6

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GENERATED (MWH):

629927 20776285 184497483

17. GROSS ELEC. ENERGY GENERATED (MWH):

205011 7090349 62073311 i

18. NET ELEC. ENERGY GENERATED (MWH):

186761 6766219 59007511

19. REACTOR SERVICE FACTOR 33.4 %

92.1 %

87.0 %

20. REACTOR AVAILAP!LITY FACTOR 33.4 %

92.1 %

87.0 %

21. UNIT SERVICE FACTOR:

33.3 %

91.9 %

85.4%

f

22. UNIT AVAILABILITY FACTOR:

33.3 %

91.9 %

85.4 %

23. UNIT CAPACITY FACTOR (USING MDC NET):

22.2 %

88.4 %

83.1% '

24. UNIT CAPACITY FACTOR (USING DER NET):

22.2 %

88.4 %

82.5 %

l

25. UNIT FORCED OUTAGE RATE:

0.0%

0.8%

5.0%

26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

REFUELING, SEPT. 11,1994,34 DAYS

27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

OCT.15,1994 i

V1-2

~

UNIT 1 AVERAGE DAILY DOCKET NO. 50-424 POWER LEVEL DATE:

OCTOBER 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 1

DAY Net MW 1.

871 2.

864 3.

861 4.

849 S.

823 6.

793 7.

778 8.

768 i

9.

764 10.

647 11.

O 12..

O l

13..

O 14.

O j

15.

O 16.

0 17.

0 18.

O j

19..

0 20.

0 21,

0 j

22.

0 23.

O 24.

0 25.

0 26.

0 27.

0 28.

0 29.

0 30.

O V1-3

~

~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50424 DATE:

OCTOBER 1,1994 UNIT NAME:

VEGP UNIT 1 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 I

REPORT MONTH SEPTEMBER 1994 R

M S

E E

Y T

A T

LICENSEE SC Y

S H

EVENT TO COMPONENT CAUSE & CORRECTIVE P

DURATION O

O REPORT ED CODE ACTION TO NO.

DATE E

(HOURS)

N D

NUMBER ME (SUBCODE)

PREVENT RECURRENCE 94-4 9/10 S

480.2 C/A 1/3 1-94-6 XX/:C >JJJXX/DET SEE BELOW F: FORCED REASON:

METHOD:

EVENTS REPORTED INVOLV S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%

B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE I

C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR i

D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.

E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)

G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN)

EVENT _9_4-4 CAUSE: DURING MANUAL PLANT SHUTDOWN FOR A PLANNED REFUELING OUTAGE, AN AUTOMATIC REACTOR TRIP FROM LESS THAN 1% POWER WAS CAUSED BY A SPURIOUS SOURCE RANGE HIGH FLUX SIGNAL.

l l

CORRECTIVE ACTION: THE CAUSE OF THE AUTOMATIC TRIP WAS FOUND TO BE A LOOSE CAPACITOR IN THE NI-0032 NEUTRON DETECTOR PRE-AMPLIFIER THAT CAUSED A SIGNAL SPIKE. THE PRE-AMPLIFIER WAS REPLACED, NI-0032 WAS RETURNED TO SERVICE AND THE REFUELING OUTAGE CONTINUED AS SCHEDULED. NO MAJOR SAFETY RELATED CORRECTIVE MAINTENANCE WAS PERFORMED DURING THIS OUTAGE PERIOD.

CRITICAL PATH WAS: COOLDOWN TO 200 DEG. F, RCS CLEANUP, BATTERY REPLACEMENT, REMOVAL OF REACTOR VESSEL HEAD AND INTERNALS, CORE OFFLOAD, STATION AUXILIARY TRANSFORMER TIE IN, ECCS FLOW TEST, REACTOR VESSEL FOSAR.

V1-4

ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR SEPTEMBER 1994 TABL,E OF CONTENTS NARRATIVE REPORT Page V2-1 '

OPERATING DATA REPORT Page V2-2 AVERAGE DAILY POWER LEVEL Page V2-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page V2-4

ri NARRATIVE REPORT DOCKET NO. 50-425 UNIT 2 DATE:

OCTOBER 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 SEPTEMBER 01 00:00 UNIT 2 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

SEPTEMBER 30 23:59 UNIT 2 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

l I

l l

V2-1

OPERATING DATA REPORT DOCKET NO. 50-425 DATE:

OCTOBER 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 OPERATING STATUS

1. UNIT NAME:

VEGP UNIT 2

2. REPORT PERIOD:

SEPTEMBER 1994

3. LICENSED THERMAL POWER (MWt):

3565

6. NAMEPLATE RATING (GROSS MWe):

1215

5. DESIGN ELECTRICAL RATING (NET MWe):

1169

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

1223

7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):

1169

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

NO RESTRICTIONS

10. REASONS FOR RESTRICTION, IF ANY:

NA THIS MONTH YR. TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

720 6551 47040

12. NUMBER OF HOURS REACTOR WAS CRITICAL:

720.0 5898.3 41938.7

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS GENERATOR ON-LINE:

720.0 5854.8 41381.2

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GENERATED (MWH):

2564313 20611850 137691348

17. GROSS ELEC. ENERGY GENERAi ED (MWH):

875657 7052952 46734989

10. NET ELEC. ENERGY GENERATED (MWH):

838937 6730902 44478379

19. REACTOR SERVICE FACTOR 100.0 %

90.0 %

89.2 %

20. REACTOR AVAILABILITY FACTOR 100.0 %

90.0%

89.2 %

21. UNIT SERVICE FACTOR:

100.0 %

89.4 %

88.0 %

22. UNIT AVAILABILITY FACTOR:

100.0 %

89.4 %

88.0 %

23. UNIT CAPACITY FACTOR (USING MDC NET):

99.7 %

87.9 %

84.6 %

24. UNIT CAPACITY FACTOR (USING DER NET):

99.7 %

87.9 %

84.7 %

25. UNIT FORCED OUTAGE RATE:

0.0%

6.6%

2.3%

26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

REFUELING, FEBRUARY 25,1995,40 DAYS

27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP :

NA l

V2-2

UNIT 2 AVERAGE DAILY DOCKET NO. 50-425 POWER LEVEL DATE:

OCTOBER 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 DAY Net MW 1.

1152 2.

1160 3.

1171

  • 4.

1173

  • 5...

1173

  • 6.

1168 7.

1162 8.

1163 9..

1167 10.

1161 11.

1159 12.

1165 I

13.

1164 14.

1165 15.

1162 16.

1157 17.

1159 18.

1159 19..

1173

  • 20.

1175

  • 21.

1171

  • 22.

1173

  • 23.

1170

  • 24.

1161 25.

1161 26.

1164 27.

1167 28.

1168 29.

1166 30.

1169 *

  • MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS V2-3 1

l l

~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-425 DATE:

OCTOBER 1,1994 UNIT NAME:

VEGP UNIT 2 COMPLETED BY: G. L. HOOPER TELEPHONE:

(706) 826-4104 REPORT MONTH SEPTEMBER 1994 i

r i

R M

S E

E Y

T A

T LICENSEE SC Y

S H

EVENT TO COMPONENT CAUSE & CORRECTIVE P

DURATION O

O REPORT ED CODE ACTION TO NO.

DATE E

(HOURS)

N D

NUMBER ME (SUBCODE)

PREVENT RECURRENCE NA NA NA NA NA NA NA NA NA NA F: FORCED REASON:

METHOD:

EVENTS REPORTED INVOLV S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%

B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.

E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)

G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN) 4 V2-4

ENCLOSURE 3 VOGTLE ELECTRIC GENERATING PLANT-UNITS 1 AND 2 CIIALLENGES TO PORV OR SAFETY VALVES DOCKET NOS. 50-424,504 25 DATE:

OCTOBER 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE.

(706) 826-4104 r

EVENT DATE TAG NO.

TYPE DESCRIPTION NA NA NA NA J

l

)