Text
{
l e~
Guof ga Power Company 40 insemen Centm N nay Fou oM-ce Boe 1295 B.rmingham, Ai Lama 30201 l
a lofephorse 205 877 71??
L Georgia Power i
C. K, McCoy vce Prewt nuc%r vagne ero*
October 13, 1994 LCV-0360-F 3
Docket Nos. 50-424 I
/
\\>
50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT Enclosed are the September 1994, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with Technical Specification 6.8.1.5.
Sincerely, C. K. McCoy CKM/JLL Enclosures cc:
Georgi _a_ Power Compa_ny Mr. J. B. Beasley, Jr.
Mr. M. Sheibani NORMS U. S. Nuclear __ Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Ilood, Licensing Project Manager, NRR Mr. II. R. Bonser, Senior Resident Inspector, Vogtle 190114 f
9410200295 94o930 PDR ADOCK oS000424 I l R
v.
ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT I MONTHLY OPERATING REPORT FOR SEPTEMBER 1994 TABLE OF CONTENTS q
NARRATIVE REPORT Page Vl-1 OPERATING DATA REPORT Page Vl-2 AVERAGE DAILY POWER LEVEL Page VI-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page VI-4 a
m
s NARRATIVE REPORT DOCKET NO. 50-424 UNIT 1 DATE:
OCTOBER 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706)826-4104 SEPTEMBER 01 00:00 UNIT 1 AT 78% POWER WITH COASTDOWN IN PROGRESS.
SEPTEMBER 10 19:20 UNIT 1 STARTED LOAD REDUCTION.
j SEPTEMBER 10 23:46 UNIT 1 TURBINE MANUALLY TRIPPED.
SEPTEMBER 11 00:18 UNIT 1 ENTERED MODE 2.
SEPTEMBER 11 00:26 UNIT 1 COMMENCED REACTOR SHUTDOWN.
SEPTEMBER 11 00:36 UNIT 1 AUTOMATIC REACTOR TRIP DUE TO SPURIOUS SOURCE RANGE HIGH FLUX SEPTEMBER 11 08:43 UNIT 1 ENTERED MODE 4.
SEPTEMBER 11 21:28 UNIT 1 ENTERED MODE 5.
SEPTEMBER 17 01:43 UNIT 1 ENTERED MODE 6.
SEPTEMBER 20 03:08 UNIT 1 CORE OFFLOAD STARTED.
SEPTEMBER 22 23:34 UNIT 1 CORE OFFLOAD COMPLETED. ENTERED DEFUELED MODE.
SEPTEMBER 30 23:59 UNIT 1 IN DEFUELED MODE, PREPARATION FOR CORE RELOAD IN PROGRESS.
i i
4 4
V1-1
~
OPERATING DATA REPORT DCCKET NO. 50-424 DATE:
OCTOBER 1,1994 i
COMPLETED BY: G. L. HOOPER i
~
TELEPHONE:
(706) 826-4104 OPERATING STATUS
- 1. UNIT NAME:
VEGP UNIT 1
- 2. REPORT PERIOD:
SEPTEMBER 1994
- 3. LICENSED THERMAL POWER (MWt):
3565
- 4. NAMEPLATE RATING (GROSS MWe):
1215
- 5. DESIGN ELECTRICAL RATING (NET MWe):
1169
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
1223 l
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):
1169
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS i
(ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe);
NO RESTRICTIONS
.10. REASONS FOR RESTRICTION, IF ANY:
NA l
5 THIS MONTH YR. TO DATE CUMULATIVE l
- 11. HOURS IN REPORTING PERIOD:
720 6551 64296
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
240.6 6032.2 55907 3
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE:
239.8 6021.7 54894.6
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH):
629927 20776285 184497483
- 17. GROSS ELEC. ENERGY GENERATED (MWH):
205011 7090349 62073311 i
- 18. NET ELEC. ENERGY GENERATED (MWH):
186761 6766219 59007511
- 19. REACTOR SERVICE FACTOR 33.4 %
92.1 %
87.0 %
- 20. REACTOR AVAILAP!LITY FACTOR 33.4 %
92.1 %
87.0 %
- 21. UNIT SERVICE FACTOR:
33.3 %
91.9 %
85.4%
f
- 22. UNIT AVAILABILITY FACTOR:
33.3 %
91.9 %
85.4 %
- 23. UNIT CAPACITY FACTOR (USING MDC NET):
22.2 %
88.4 %
83.1% '
- 24. UNIT CAPACITY FACTOR (USING DER NET):
22.2 %
88.4 %
82.5 %
l
- 25. UNIT FORCED OUTAGE RATE:
0.0%
0.8%
5.0%
- 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
REFUELING, SEPT. 11,1994,34 DAYS
- 27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
OCT.15,1994 i
V1-2
~
UNIT 1 AVERAGE DAILY DOCKET NO. 50-424 POWER LEVEL DATE:
OCTOBER 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 1
DAY Net MW 1.
871 2.
864 3.
861 4.
849 S.
823 6.
793 7.
778 8.
768 i
9.
764 10.
647 11.
O 12..
O l
13..
O 14.
O j
15.
O 16.
0 17.
0 18.
O j
19..
0 20.
0 21,
0 j
22.
0 23.
O 24.
0 25.
0 26.
0 27.
0 28.
0 29.
0 30.
O V1-3
~
~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50424 DATE:
OCTOBER 1,1994 UNIT NAME:
VEGP UNIT 1 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 I
REPORT MONTH SEPTEMBER 1994 R
M S
E E
Y T
A T
LICENSEE SC Y
S H
EVENT TO COMPONENT CAUSE & CORRECTIVE P
DURATION O
O REPORT ED CODE ACTION TO NO.
DATE E
(HOURS)
N D
NUMBER ME (SUBCODE)
PREVENT RECURRENCE 94-4 9/10 S
480.2 C/A 1/3 1-94-6 XX/:C >JJJXX/DET SEE BELOW F: FORCED REASON:
METHOD:
EVENTS REPORTED INVOLV S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%
B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE I
C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR i
D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.
E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN)
EVENT _9_4-4 CAUSE: DURING MANUAL PLANT SHUTDOWN FOR A PLANNED REFUELING OUTAGE, AN AUTOMATIC REACTOR TRIP FROM LESS THAN 1% POWER WAS CAUSED BY A SPURIOUS SOURCE RANGE HIGH FLUX SIGNAL.
l l
CORRECTIVE ACTION: THE CAUSE OF THE AUTOMATIC TRIP WAS FOUND TO BE A LOOSE CAPACITOR IN THE NI-0032 NEUTRON DETECTOR PRE-AMPLIFIER THAT CAUSED A SIGNAL SPIKE. THE PRE-AMPLIFIER WAS REPLACED, NI-0032 WAS RETURNED TO SERVICE AND THE REFUELING OUTAGE CONTINUED AS SCHEDULED. NO MAJOR SAFETY RELATED CORRECTIVE MAINTENANCE WAS PERFORMED DURING THIS OUTAGE PERIOD.
CRITICAL PATH WAS: COOLDOWN TO 200 DEG. F, RCS CLEANUP, BATTERY REPLACEMENT, REMOVAL OF REACTOR VESSEL HEAD AND INTERNALS, CORE OFFLOAD, STATION AUXILIARY TRANSFORMER TIE IN, ECCS FLOW TEST, REACTOR VESSEL FOSAR.
V1-4
ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR SEPTEMBER 1994 TABL,E OF CONTENTS NARRATIVE REPORT Page V2-1 '
OPERATING DATA REPORT Page V2-2 AVERAGE DAILY POWER LEVEL Page V2-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page V2-4
ri NARRATIVE REPORT DOCKET NO. 50-425 UNIT 2 DATE:
OCTOBER 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 SEPTEMBER 01 00:00 UNIT 2 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.
SEPTEMBER 30 23:59 UNIT 2 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.
l I
l l
V2-1
OPERATING DATA REPORT DOCKET NO. 50-425 DATE:
OCTOBER 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 OPERATING STATUS
- 1. UNIT NAME:
VEGP UNIT 2
- 2. REPORT PERIOD:
SEPTEMBER 1994
- 3. LICENSED THERMAL POWER (MWt):
3565
- 6. NAMEPLATE RATING (GROSS MWe):
1215
- 5. DESIGN ELECTRICAL RATING (NET MWe):
1169
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
1223
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):
1169
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION, IF ANY:
NA THIS MONTH YR. TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
720 6551 47040
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
720.0 5898.3 41938.7
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE:
720.0 5854.8 41381.2
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH):
2564313 20611850 137691348
- 17. GROSS ELEC. ENERGY GENERAi ED (MWH):
875657 7052952 46734989
- 10. NET ELEC. ENERGY GENERATED (MWH):
838937 6730902 44478379
- 19. REACTOR SERVICE FACTOR 100.0 %
90.0 %
89.2 %
- 20. REACTOR AVAILABILITY FACTOR 100.0 %
90.0%
89.2 %
- 21. UNIT SERVICE FACTOR:
100.0 %
89.4 %
88.0 %
- 22. UNIT AVAILABILITY FACTOR:
100.0 %
89.4 %
88.0 %
- 23. UNIT CAPACITY FACTOR (USING MDC NET):
99.7 %
87.9 %
84.6 %
- 24. UNIT CAPACITY FACTOR (USING DER NET):
99.7 %
87.9 %
84.7 %
- 25. UNIT FORCED OUTAGE RATE:
0.0%
6.6%
2.3%
- 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
REFUELING, FEBRUARY 25,1995,40 DAYS
- 27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP :
NA l
V2-2
UNIT 2 AVERAGE DAILY DOCKET NO. 50-425 POWER LEVEL DATE:
OCTOBER 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 DAY Net MW 1.
1152 2.
1160 3.
1171
- 4.
1173
- 5...
1173
- 6.
1168 7.
1162 8.
1163 9..
1167 10.
1161 11.
1159 12.
1165 I
13.
1164 14.
1165 15.
1162 16.
1157 17.
1159 18.
1159 19..
1173
- 20.
1175
- 21.
1171
- 22.
1173
- 23.
1170
- 24.
1161 25.
1161 26.
1164 27.
1167 28.
1168 29.
1166 30.
1169 *
l l
~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-425 DATE:
OCTOBER 1,1994 UNIT NAME:
VEGP UNIT 2 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 REPORT MONTH SEPTEMBER 1994 i
r i
R M
S E
E Y
T A
T LICENSEE SC Y
S H
EVENT TO COMPONENT CAUSE & CORRECTIVE P
DURATION O
O REPORT ED CODE ACTION TO NO.
DATE E
(HOURS)
N D
NUMBER ME (SUBCODE)
PREVENT RECURRENCE NA NA NA NA NA NA NA NA NA NA F: FORCED REASON:
METHOD:
EVENTS REPORTED INVOLV S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%
B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.
E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN) 4 V2-4
ENCLOSURE 3 VOGTLE ELECTRIC GENERATING PLANT-UNITS 1 AND 2 CIIALLENGES TO PORV OR SAFETY VALVES DOCKET NOS. 50-424,504 25 DATE:
OCTOBER 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE.
(706) 826-4104 r
EVENT DATE TAG NO.
TYPE DESCRIPTION NA NA NA NA J
l
)