Monthly Operating Rept for Sept 1994 for Fermi 2
ML20149G280
Person / Time
Site: Fermi 
Issue date: 09/30/1994
From: Gipson D, Stone B
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-94-0085, CON-NRC-94-85 NUDOCS 9410200131
Download: ML20149G280 (4)


Text

aq. ;

.p m.

+> -

a.a e w a

. + i

-. - - +.

?.

Douglas R. Gipson

$wng>r Vice Preswdent Nucleer GeneraM>n

. DOITOil.

' rerm 6400 North Das Hghway

=

.-C ISOn ~~"~ 'a'"

(313)566-524')

)

i i

Reg Guide 1.16 October 13, 1994 NRC-94-0085 U. S. Nuclear Regulatory Commission Attention: Document Control Desk f

Washington, D.C.

20555 i

Reference:

Fermi 2 i

NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for September, 1994 Enclosed for your information and use is the Fermi 2 Honthly Operating Status Report for September, 1994. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductinns identified in NRC Regulatory 6 '1e 1.16 and Fermi 2 Technical Specification 6.9.1.6.

t If you have any questions, please contact Brian Stone, at (313) 586-5148.

Sincerely, Enclosure cc:

T. G. Colburn D. R. Hahn J. B. Martin M. P. Phillips i

K. R. Riemer' P. L. Torpey g'

l 9410200131 94o930 1

PDR ADOCK 05000341 R

PDR

~

OPERATING DATA REPORT DOCKET NO.

50-341 COMPLETED BY B. J. Stone DATE October 13, 1994 TELEPl10NE (313) 586-5148 OPERATING STATUS 1.

UNIT NAME:

Fermi 2 l Notes:

(1) Calculated using weight-l 2.

REPORTING PERIOD: September, 1994 l ed averages to reflect variations 1

3 LICENSED THERMAL POWER (MWt):

3430 l In rating (MDC and DER).

l 4.

NAMEPLATE RATING (GROSS MWe):

1179 l (2) Currently limiting power to l

5 DESIGN ELECT RATING (Net MWe): 1116 I 93.5% CTP maximum to limit turbine l

6.

HAX DEPENDABLE CAP (CROSS MWe):1135 l component vibration. All ratings l

7.

MAX DEPENDABLE CAP (Net MWe):1085 l reflect 98% CTP due to turbine l

I throttle valve limitations, l

8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE-LAST REPORT, GIVE REASONS:

N/A 9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):

(2)

10. REASONS FOR RESTRICTION, IF ANY:

(2)

THIS MONTH YR TO DATE CUMULATIVE

11. IIRS IN REPORTING PERIOD 720 6,551 58,621
12. IIRS REACTOR WAS CRITICAL 0

0 40,545

13. REACTOR RESERVE SifUTDOWN HRS 0

0 0

i

14. Il0URS GENERATOR ON-LINE O

O 39,124.4

15. UNIT RESERVE SHUTDOWN IIOURS 0

0 0

16. GROSS THERMAL ENERGY GEN (MWil) 0 0

119,702,687

17. GROSS ELELT ENERGY GEN (MWH) 0 0

39,973,957

18. NET ELECT ENERGY GEN (MWil) 0 0

38,233,715

19. '; NIT SERVICE FACTOR 0

0 66.7

20. UNIT AVAILABILITY FACTOR 0

0 66.7

21. UNIT CAP FACTOR (USING HDC NET) 0 0

60.7(1)

22. UNIT CAP FACTOR (USING DER NET) 0 0

59.3(1)

23. UNIT FORCED OUTAGE RATE 100.0 100.0 17.3
24. SliUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACll):
25. IF SIIUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NOVEMBER, 1994

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

)

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A i

AVERAGE DAILY UNIT POWER LEVEL

~

DOCKET NO.

50-341 UNIT FERMI 2 DATE October 13, 1994 COMPLETED BY R. Pirkle TELEPHONE (313) 586-5027 Honth September, 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(HWe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

i 14 0

30 0

15 0

16 0

+

UNIT SHUTDOWNS AND pow?R REDUCTIONS "8

DOCKET NO.

50-341 DATE October 13. 1994 UNIT NAME Fermi 2 COJPLETED BV B.

J.

Stone TELEPHONE (313) 586-5148 REPORT MONTH Septemoer. 1994 i

j l

l METHOD OF l

l I

SHUTTING DOWN LER SYS COVP CAUSE & CORRECTIVE NO.

I DATE l TYPE DUR REASON THE REACTOR NO.

CODE CODE ACTION TU PREVENT l

I (1)

(HRS)

(2)

OR REDUCING (4)

(5)

RECURRENCE (6) l

{

(7)

POWER (3)

I (8) i i

S93-06 i 931225 l r 72D A

3

'93-014 I TA TRB Reactor tripped following trip of I

I l

main turbine.

Turbine tripped due i

l to imbalance caused by loss of 5 Oth l

l stage blades in low pressure turbine l l

l Inumber 3.

Operatico without 7th rnd l l

l

!Bth stages in all three LP turbines l

l

[

is planned for upcoming operating l

l l

cycle.

Operation witheut stages 7 l

l l

l and 8 will prevent recurrence, i

I I

I I

I I

(1) 5: FORCED (2) REaEON:

(3) METHOD:

(4) INSTRUCTIOtiS FOR S: SCHEDULED A - EQUIPUENT FAILURE (EXPLAIN) 1 - MANUAL PREPARATION OF DATA B-MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRV SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER) FILE D-REGULATORY RESTRICTION 4 - CONTINUED (NUREG-1022)

E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G - OPERATIONAL ERROR (EMPLAIN)

H - OTHER (EXPLAIN)

25) SAME SOURCE AS (4)

(6) R - PREFIX INDICATES PCwER REDUCTION.

S - PREFIX INDICATES PLANT

$HUTDOWN.

(7) DURATICN OF REDUCTIONS REPORTED AS ZERO PER REG.

GUIDE 1.16 LEV. 4 (B) Outage hours are a cont inuatior of the outage which began on 12/25/93.

-