Category:CORRESPONDENCE-LETTERS
MONTHYEARLIC-99-0098, Forwards Revs to Fort Calhoun Station EPIPs & Emergency Planning Forms Manual.Document Update Instructions & Summary of Changes Are Included on Confirmation of Transmittal Form Attached1999-10-15015 October 1999 Forwards Revs to Fort Calhoun Station EPIPs & Emergency Planning Forms Manual.Document Update Instructions & Summary of Changes Are Included on Confirmation of Transmittal Form Attached ML20217G9261999-10-15015 October 1999 Forwards Insp Rept 50-285/99-10 on 990913-17.One NCV Noted ML20217G2331999-10-14014 October 1999 Forwards Insp Rept 50-285/99-09 on 990913-17.No Violations Noted LIC-99-0091, Submits Suppl Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, in Response to NRC RAI During 990817 Meeting with Util1999-10-0808 October 1999 Submits Suppl Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, in Response to NRC RAI During 990817 Meeting with Util LIC-99-0097, Forwards Final RO & SRO License Applications,As Requested in ,Certifying That Training Completed for Six RO Candidates,Three Instant SRO Candidates & One Upgrade SRO Candidate.Without Encls1999-10-0707 October 1999 Forwards Final RO & SRO License Applications,As Requested in ,Certifying That Training Completed for Six RO Candidates,Three Instant SRO Candidates & One Upgrade SRO Candidate.Without Encls ML20217B5111999-10-0606 October 1999 Forwards Amend 193 to License DPR-40 & Safety Evaluation. Amend Revises TS Sections 2.10.4,3.1 & Table 3-3 to Increase Min Required RCS Flow Rate & Change Surveillance require- Ments for RCS Flow Rate ML20216H7231999-09-29029 September 1999 Informs That Util 980325 Response to GL 97-06, Degradation of SG Internals, Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Fort Calhoun Station,Unit 1 ML20212L9571999-09-27027 September 1999 Informs That Follow Up Insp for Drill/Exercise Performance Indicator Will Be Conducted During Wk of 991001 LIC-99-0089, Forwards Preliminary License Exam Applications for Six Ros, Three Instant SROs & One Upgrade SRO Candidate,Per Preparation for Ro/Sro Licensing Exams to Be Administered on 991025-29 at Fcs.Without Encl1999-09-24024 September 1999 Forwards Preliminary License Exam Applications for Six Ros, Three Instant SROs & One Upgrade SRO Candidate,Per Preparation for Ro/Sro Licensing Exams to Be Administered on 991025-29 at Fcs.Without Encl LIC-99-0092, Forwards Revised Epips,Including non-proprietary Rev 8 to EPIP-RR-66,rev 3 to EPIP-EOF-24,rev 14 to RERP-Section F,Rev 11 to RERP-Section I,Rev 12 to RERP-Appendix C & RERP & EPIP Indexes.Proprietary Rev 3 to EPIP-EOF-24,pages 1-3,encl1999-09-21021 September 1999 Forwards Revised Epips,Including non-proprietary Rev 8 to EPIP-RR-66,rev 3 to EPIP-EOF-24,rev 14 to RERP-Section F,Rev 11 to RERP-Section I,Rev 12 to RERP-Appendix C & RERP & EPIP Indexes.Proprietary Rev 3 to EPIP-EOF-24,pages 1-3,encl LIC-99-0087, Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams1999-09-17017 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams LIC-99-0088, Forwards Documentation Associated with SRO License Renewal Application for Cd Darrow.Applicant Has Satisfactorily Completed Applicable FCS Requalification Program.Without Encls1999-09-16016 September 1999 Forwards Documentation Associated with SRO License Renewal Application for Cd Darrow.Applicant Has Satisfactorily Completed Applicable FCS Requalification Program.Without Encls LIC-99-0080, Requests Approval of Attached Rev to QAP Contained in App a of Usar,Revising Commitment Re Qualifications of Personnel Performing Quality Control Insps of Activities Affecting Fire Protection1999-09-16016 September 1999 Requests Approval of Attached Rev to QAP Contained in App a of Usar,Revising Commitment Re Qualifications of Personnel Performing Quality Control Insps of Activities Affecting Fire Protection LIC-99-0085, Forwards Revs 18 & 19 to TDB-VI, COLR for FCS Unit 1,IAW TS 5.9.5.Rev 18 Resulted from Reevaluation of Cycle 18 Setpoints & Rev 19 Resulted from Changes in Cycle 19 Refueling Boron Concentrations & Addition of TS Parameters1999-09-0808 September 1999 Forwards Revs 18 & 19 to TDB-VI, COLR for FCS Unit 1,IAW TS 5.9.5.Rev 18 Resulted from Reevaluation of Cycle 18 Setpoints & Rev 19 Resulted from Changes in Cycle 19 Refueling Boron Concentrations & Addition of TS Parameters IR 05000285/19990081999-09-0707 September 1999 Forwards Insp Rept 50-285/99-08 on 990907-0811.No Violations Noted.Insp Consisted of Exam of Activities Conducted Under License as Relate to Safety & to Compliance with Commission Rules & Regulations & with Conditions of License ML20211P2581999-09-0303 September 1999 Forwards Insp Rept 50-285/99-06 on 990809-12.No Violations Noted.Insp Consisted of Exam of Activities Under License as Related to EP & to Compliance with Commission Rules & Regulations & with Conditions of License LIC-99-0083, Requests Participation in internet-based Y2K Early Warning Sys (Yews),As Noted in NRC Info Notice 99-25.Plant Point of Contact Will Be JW Chase1999-09-0202 September 1999 Requests Participation in internet-based Y2K Early Warning Sys (Yews),As Noted in NRC Info Notice 99-25.Plant Point of Contact Will Be JW Chase ML20211J9231999-09-0202 September 1999 Forwards SE Accepting Licensee 990301 Requests for Relief Re Third 10-year ISI Interval for Plant,Unit 1.Relief Proposed Alternatives to Requirements in ASME B&PV Section XI,1989 Edition,Paragraphs IWA-5242(a) & IWA-5250(a)(2) ML20211L3241999-09-0202 September 1999 Informs That Due to Administrative Error,Page 2-50 of TSs Contained Error on 2.10.2(2) of Amend 192 to License DPR-40 Issued on 990727.Corrected Page Encl LIC-99-0077, Forwards non-proprietary & Proprietary Revised EP Forms, Including FC-EPF Index,Pp 1 Dtd 990805,pp 2 Dtd 990812,rev 11 to FC-EPF-9,rev 12 to FC-EPF-10,rev 9 to FC-EPF-11,rev 2 to FC-EPF-12 & Rev 3 to FC-EPF-38.Proprietary EP Withheld1999-08-27027 August 1999 Forwards non-proprietary & Proprietary Revised EP Forms, Including FC-EPF Index,Pp 1 Dtd 990805,pp 2 Dtd 990812,rev 11 to FC-EPF-9,rev 12 to FC-EPF-10,rev 9 to FC-EPF-11,rev 2 to FC-EPF-12 & Rev 3 to FC-EPF-38.Proprietary EP Withheld ML20211F4491999-08-25025 August 1999 Forwards Ltr from Ja Miller,Dtd 990819,which Notified State of Iowa of Deficiency Identified During 990810,Fort Calhoun Station Biennial Exercise.One Deficiency Identified for Not Adequately Demonstrating Organizational Capability LIC-99-0076, Forwards fitness-for-duty Program Performance Data for Six Month Period from Jan-June 1999,IAW 10CFR26.71(d)1999-08-20020 August 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period from Jan-June 1999,IAW 10CFR26.71(d) LIC-99-0078, Forwards Rev 16C to FCS Site Security Plan,Per Provisions of 10CFR50.54(p).Rev Has Been Determined Not to Degrade Effectiveness of Current Security Plans.List of Changes, Provided.Encl Withheld1999-08-20020 August 1999 Forwards Rev 16C to FCS Site Security Plan,Per Provisions of 10CFR50.54(p).Rev Has Been Determined Not to Degrade Effectiveness of Current Security Plans.List of Changes, Provided.Encl Withheld ML20210R1491999-08-13013 August 1999 Forwards Insp Rept 50-285/99-07 on 990719-23.No Violations Noted.Nrc Identified One Issue Which Was Evaluated Under Risk Significance Determination Process & Was Determined to Be of Low Risk Significance LIC-99-0075, Forwards Monthly Operating Rept for July 1999 for Fcs,Unit 1,per Plant TS 5.9.1.Revised Rept for June 1999,encl Due to Inadvertent Reporting of Gross Electrical Energy Data When Net Electrical Energy Data Was Required1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Fcs,Unit 1,per Plant TS 5.9.1.Revised Rept for June 1999,encl Due to Inadvertent Reporting of Gross Electrical Energy Data When Net Electrical Energy Data Was Required ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210N1991999-08-0909 August 1999 Informs That as Result of NRC Review of Licensee Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20210P8991999-08-0909 August 1999 Forwards FEMA Final Rept for 990630 Offsite Medical Drill. No Deficiencies or Areas Requiring Corrective Action Identified During Drill LIC-99-0072, Requests That Licensee 990526 Application for Amend & Related Documents,Be Withdrawn.Util Requests That NRC Review Attached Responses to Ensure That Upcoming Submittal Will Be Acceptable1999-08-0606 August 1999 Requests That Licensee 990526 Application for Amend & Related Documents,Be Withdrawn.Util Requests That NRC Review Attached Responses to Ensure That Upcoming Submittal Will Be Acceptable ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams LIC-99-0068, Documents OPPD Response to Requested Actions in GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-08-0202 August 1999 Documents OPPD Response to Requested Actions in GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal LIC-99-0040, Forwards Rept of Changes,Tests & Experiments Performed Per 10CFR50.59 & Revs to USAR Other than Those Resulting from 10CFR50.59.Encl Info Covers Period of 981101-9903311999-07-28028 July 1999 Forwards Rept of Changes,Tests & Experiments Performed Per 10CFR50.59 & Revs to USAR Other than Those Resulting from 10CFR50.59.Encl Info Covers Period of 981101-990331 LIC-99-0070, Requests Reinstatement of SRO License Previously Held by K Grant-Leanna (License SOP-43569).Operator Is Current on All requalification-training Topics & Has Completed License Reactivation Program1999-07-28028 July 1999 Requests Reinstatement of SRO License Previously Held by K Grant-Leanna (License SOP-43569).Operator Is Current on All requalification-training Topics & Has Completed License Reactivation Program ML20210G1851999-07-27027 July 1999 Forwards Amend 192 to License DPR-40 & Safety Evaluation. Amend Consists of Changes to TS in Response to 990129 Application LIC-99-0057, Forwards 1999/2000 Statement of Cash Flow from Operations, as Guarantee of Payment of Deferred Premiums for Period of 990630 to 0006301999-07-26026 July 1999 Forwards 1999/2000 Statement of Cash Flow from Operations, as Guarantee of Payment of Deferred Premiums for Period of 990630 to 000630 ML20216D6951999-07-26026 July 1999 Informs That During 990614 Review of Fort Calhoun,Nrc Noted That Drill/Exercise Performance Indicator Has Entered White Band,Which Indicated Level of Licensee Performance That Warranted Increased Regulatory Response LIC-99-0071, Informs That Util Expects to Submit Four Licensing Actions in Each of Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-26026 July 1999 Informs That Util Expects to Submit Four Licensing Actions in Each of Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates LIC-99-0069, Forwards non-proprietary & Proprietary Epips,Including FC- Epf Index Page & Page 2 ,rev 0 to FC- EPF-42,EPIP Index (Page 1 of 2) & EPIP-OSC-2, Cover & Pages 19 & 20.Proprietary Encls Withheld1999-07-23023 July 1999 Forwards non-proprietary & Proprietary Epips,Including FC- Epf Index Page & Page 2 ,rev 0 to FC- EPF-42,EPIP Index (Page 1 of 2) & EPIP-OSC-2, Cover & Pages 19 & 20.Proprietary Encls Withheld ML20210D9471999-07-22022 July 1999 Forwards Amend 191 to DPR-40 & Safety Evaluation.Amend Authorizes Rev to Licensing Basis as Described in Updated Safety Analysis Rept to Incorporate Mod for Overriding Containment Isolation ML20210C2041999-07-20020 July 1999 Discusses 990715 Mgt Meeting with Midamerican Energy Co Re risk-informed Baseline Insp Program Recently Implemented at Cooper & Fort Calhoun Stations ML20210C0201999-07-20020 July 1999 Informs That Due to Administrative Oversight,Revised TS Bases Provided in to Fort Calhoun Station Were Not Dated.Dated Pages to TS Encl ML20210B0761999-07-19019 July 1999 Forwards Insp Rept 50-285/99-05 on 990601-0710.No Violations Noted ML20209G5351999-07-15015 July 1999 Informs That Staff Incorporated Rev of TS Bases Provided by Licensee Ltr Dtd 980904,into Fort Calhoun Station Tss. Staff Finds Revs to Associated TS Bases to Be Acceptable. Revised Bases Pages Encl ML20209F5741999-07-12012 July 1999 Ack Receipt of Transmitting Exercise Scenario for Upcoming Biennial Offsite Exercise Scheduled 990810.Scenario Reviewed & Acceptable ML20209G5591999-07-0808 July 1999 Forwards Detailed Listing of Staff Concerns with C-E TR NPSD-683,rev 3 & RCS pressure-temperature Limits Rept LIC-99-0066, Forwards Fort Calhoun Performance Indicators Rept for May 19991999-07-0707 July 1999 Forwards Fort Calhoun Performance Indicators Rept for May 1999 LIC-99-0060, Forwards Proprietary & non-proprietary Revs to Fort Calhoun Station Emergency Plan Forms (Epf),Including FC-EPF,FC-EPF-1 & FC-EPF-17.Proprietary Info Withheld1999-07-0101 July 1999 Forwards Proprietary & non-proprietary Revs to Fort Calhoun Station Emergency Plan Forms (Epf),Including FC-EPF,FC-EPF-1 & FC-EPF-17.Proprietary Info Withheld ML20209D8771999-07-0101 July 1999 Summarizes 990630 Public Meeting Conducted in Fort Calhoun, Ne Re Results of Completed Culture Survey,Plant Status, Facility Activities Re New NRC Oversight Process & License Renewal.Licensee Handout & Attendance List Encl LIC-99-0063, Requests Termination of License Held by MR Anderson (License SOP 43812) for Fort Calhoun Station.Anderson Ended Employment Effective 9906241999-07-0101 July 1999 Requests Termination of License Held by MR Anderson (License SOP 43812) for Fort Calhoun Station.Anderson Ended Employment Effective 990624 1999-09-08
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217G9261999-10-15015 October 1999 Forwards Insp Rept 50-285/99-10 on 990913-17.One NCV Noted ML20217G2331999-10-14014 October 1999 Forwards Insp Rept 50-285/99-09 on 990913-17.No Violations Noted ML20217B5111999-10-0606 October 1999 Forwards Amend 193 to License DPR-40 & Safety Evaluation. Amend Revises TS Sections 2.10.4,3.1 & Table 3-3 to Increase Min Required RCS Flow Rate & Change Surveillance require- Ments for RCS Flow Rate ML20216H7231999-09-29029 September 1999 Informs That Util 980325 Response to GL 97-06, Degradation of SG Internals, Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Fort Calhoun Station,Unit 1 ML20212L9571999-09-27027 September 1999 Informs That Follow Up Insp for Drill/Exercise Performance Indicator Will Be Conducted During Wk of 991001 IR 05000285/19990081999-09-0707 September 1999 Forwards Insp Rept 50-285/99-08 on 990907-0811.No Violations Noted.Insp Consisted of Exam of Activities Conducted Under License as Relate to Safety & to Compliance with Commission Rules & Regulations & with Conditions of License ML20211P2581999-09-0303 September 1999 Forwards Insp Rept 50-285/99-06 on 990809-12.No Violations Noted.Insp Consisted of Exam of Activities Under License as Related to EP & to Compliance with Commission Rules & Regulations & with Conditions of License ML20211L3241999-09-0202 September 1999 Informs That Due to Administrative Error,Page 2-50 of TSs Contained Error on 2.10.2(2) of Amend 192 to License DPR-40 Issued on 990727.Corrected Page Encl ML20211J9231999-09-0202 September 1999 Forwards SE Accepting Licensee 990301 Requests for Relief Re Third 10-year ISI Interval for Plant,Unit 1.Relief Proposed Alternatives to Requirements in ASME B&PV Section XI,1989 Edition,Paragraphs IWA-5242(a) & IWA-5250(a)(2) ML20211F4491999-08-25025 August 1999 Forwards Ltr from Ja Miller,Dtd 990819,which Notified State of Iowa of Deficiency Identified During 990810,Fort Calhoun Station Biennial Exercise.One Deficiency Identified for Not Adequately Demonstrating Organizational Capability ML20210R1491999-08-13013 August 1999 Forwards Insp Rept 50-285/99-07 on 990719-23.No Violations Noted.Nrc Identified One Issue Which Was Evaluated Under Risk Significance Determination Process & Was Determined to Be of Low Risk Significance ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210P8991999-08-0909 August 1999 Forwards FEMA Final Rept for 990630 Offsite Medical Drill. No Deficiencies or Areas Requiring Corrective Action Identified During Drill ML20210N1991999-08-0909 August 1999 Informs That as Result of NRC Review of Licensee Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210G1851999-07-27027 July 1999 Forwards Amend 192 to License DPR-40 & Safety Evaluation. Amend Consists of Changes to TS in Response to 990129 Application ML20216D6951999-07-26026 July 1999 Informs That During 990614 Review of Fort Calhoun,Nrc Noted That Drill/Exercise Performance Indicator Has Entered White Band,Which Indicated Level of Licensee Performance That Warranted Increased Regulatory Response ML20210D9471999-07-22022 July 1999 Forwards Amend 191 to DPR-40 & Safety Evaluation.Amend Authorizes Rev to Licensing Basis as Described in Updated Safety Analysis Rept to Incorporate Mod for Overriding Containment Isolation ML20210C0201999-07-20020 July 1999 Informs That Due to Administrative Oversight,Revised TS Bases Provided in to Fort Calhoun Station Were Not Dated.Dated Pages to TS Encl ML20210C2041999-07-20020 July 1999 Discusses 990715 Mgt Meeting with Midamerican Energy Co Re risk-informed Baseline Insp Program Recently Implemented at Cooper & Fort Calhoun Stations ML20210B0761999-07-19019 July 1999 Forwards Insp Rept 50-285/99-05 on 990601-0710.No Violations Noted ML20209G5351999-07-15015 July 1999 Informs That Staff Incorporated Rev of TS Bases Provided by Licensee Ltr Dtd 980904,into Fort Calhoun Station Tss. Staff Finds Revs to Associated TS Bases to Be Acceptable. Revised Bases Pages Encl ML20209F5741999-07-12012 July 1999 Ack Receipt of Transmitting Exercise Scenario for Upcoming Biennial Offsite Exercise Scheduled 990810.Scenario Reviewed & Acceptable ML20209G5591999-07-0808 July 1999 Forwards Detailed Listing of Staff Concerns with C-E TR NPSD-683,rev 3 & RCS pressure-temperature Limits Rept ML20209D8771999-07-0101 July 1999 Summarizes 990630 Public Meeting Conducted in Fort Calhoun, Ne Re Results of Completed Culture Survey,Plant Status, Facility Activities Re New NRC Oversight Process & License Renewal.Licensee Handout & Attendance List Encl ML20196F4931999-06-24024 June 1999 Discusses 990617 Public Meeting at Dana College,Blair,Ne Re Overview of Pilot Insp Program ML20196D2321999-06-21021 June 1999 Forwards Corrected Cover Ltr for Insp Rept 50-285/99-04. Original Cover Ltr Incorrectly Stated That Rept Contained Two Noncited Violations,When Rept Actually Documented Only One ML20195J2121999-06-14014 June 1999 Ack Receipt of Ltr Dtd 990316,which Transmitted Rev 16B to Site Security Plan,Rev 2 to Safeguards Contingency Plan & Rev 6 to Training & Qualification Plan for Plant,Under Provisions of 10CFR50.54(p) IR 05000285/19990041999-06-11011 June 1999 Corrected Ltr Forwarding Insp Rept 50-285/99-04 on 990425-0531.Insp Determined That One Violation of NRC Requirements Occurred & Being Treated as Noncited Violation, Consistent with App C of Enforcement Policy ML20195J2481999-06-11011 June 1999 Forwards Insp Rept 50-285/99-04 on 990425-0531.Violations Identified & Being Treated as Noncited ML20195G3141999-06-10010 June 1999 Ack Receipt of & Encl Objectives for Facility Emergency Plan Exercise,Scheduled for 990810 ML20195E8391999-06-0909 June 1999 Ack Receipt of Transmitting Changes to Licensee Emergency Plan,Rev 14 & Emergency Plan Implementing Procedure OSC-1 Under Provisions of 10CFR50,App E,Section IV ML20195G3621999-06-0808 June 1999 Ack Receipt of ,Which Transmitted Changes to Fort Calhoun Station Emergency Plan,App A,Rev 15,under Provisions of 10CFR50,App E,Section V.Nrc Approval Not Required ML20207G4741999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Fort Calhoun Station EP Implementing Procedure EPIP-OSC-1, Emergency Classification,Rev 31,under Provisions of 10CFR50, App E,Section V ML20207G4631999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Fort Calhoun Station Ep,App B,Rev 4,under Provisions of 10CFR50,App E,Section V.No Violations Identified During Review ML20207G2981999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Fort Calhoun Station Radiological Er Plan,Section E,Rev 22,under Provisions of 10CFR50,App E,Section V.Nrc Approval Not Required Due to Determination That Effectiveness Unchanged ML20207G4661999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Fort Calhoun Station EP Implementing Procedure EPIP OSC-1, Emergency Classification,Rev 30,under Provisions of 10CFR50, App E,Section V ML20207G3401999-05-27027 May 1999 Informs That NRC Held Planning Meeting on 990511 for Fort Calhoun Station to Identify Insp Activities at Facility for Next 6 to 12 Months.Informs of NRC Planned Insp Activities & Offers Licensee Opportunity to Provide Feedback ML20207A9041999-05-24024 May 1999 Informs That NRR Reorganized,Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Was Created. Reorganization Chart Encl ML20206U6331999-05-18018 May 1999 Forwards Insp Rept 50-285/99-03 on 990314-0424.Four Violations of NRC Requirements Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20206L4151999-05-10010 May 1999 Forwards SE of OPPD Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20206H4471999-05-0707 May 1999 Informs That on 990407,NRC Administered Gfes of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However,Copy of Master Exam with Answer Key,Encl for Info.Without Encl ML20206E7201999-04-28028 April 1999 Responds to Meeting Conducted 990419 in Fort Calhoun,Ne Re Results of PPR Completed 990211.Addl Topics Discussed Included New Assessment Process & Upcoming Actions Planned in Response to Y2K Concerns ML20205Q5671999-04-15015 April 1999 Forwards Amend 190 to License DPR-40 & Safety Evaluation. Amend Revises TS 5.2.f & TS 5.11.2 to Change Title of Shift Supervisor to Shift Manager ML20205J2751999-04-0202 April 1999 Forwards Insp Rept 50-285/99-02 on 990131-0313.No Violations Noted.During Insp,Licensee Conduct of Activities at Fort Calhoun Station Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices ML20205A7191999-03-19019 March 1999 Informs That on 990211 NRC Staff Completed PPR of Fort Calhoun Station.Review Was Conducted for All Operating NPPs to Develop an Integrated Understanding of Safety Performance ML20207K6151999-03-11011 March 1999 Forwards Insp Rept 50-285/99-01 on 990208-26.One Noncited Violation Was Identified ML20207E8691999-03-0303 March 1999 Forwards Correction to Amend 188 to License DPR-40 for Plant,Unit 1.Administrative Error,Three Pages of TSs Contained Errors,An Incorrect Page Number,Missing Parenthesis & Misspelled Words ML20203F2041999-02-11011 February 1999 Informs That During 990208 Telcon Between Mc Ralrick & J Pellet & T Stetka,Arrangements Were Made for Administration of Licensing Examinations at Fort Calhoun Station for Week of 991018 1999-09-07
[Table view] |
Text
- ~
. . _
! . .
p t >"A MGuy UNITED STATES
g 'g NUCLEAR REGULATORY COMMISSION L $ REGloN Iv
'# 411 RYAN PLAZA drive, SUITE 400
0'8 AR LINoToN. TEXAS 760114064
+9 * ****
JUL 21 1997 S. K. Gambhir, Division Manager Production Engineering Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
P.O. Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399 SUBJECT: NRC INSPECTION REPORT 50-285/97-11
Dear Mr. Gambhir:
Thank you for your letter of July 3,1997, in response to our letter and Notice of Violation dated June 4,1997. We hc.c reviewed your reply and find it responsive to ti,e concerns raised in our Notice of Violation. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.
Sincere ,
T omas P. Gwynn Dir to l Division of React P ject Docket No.: 50-285 License No.: DPR-40 ,
r cc:
James W. Tills, Manager l Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
l P.O. Box 399 Hwy. 75 - North of Fort Calhoun j Fort Calhoun, Nebraska 68023-0399 EMll 9707230140 970721 il.EEE. l.E.E 1 L * -
PDR ADOCK 05000295 G PDR l
,
. .
. .
Omaha Public Power District -2-
!
James W. Chase, Manager Fort Calhoun Station P.O. Box 399 Fort Calhoun, Nebraska 68023 Perry D. Robinson, Esq.
Winston & Strawn 1400 L. Street, N.W.
Washington, D.C. 20005-3502 Chairman Washington County Board of Supervisors Blair, Nebraska 68008 Cheryl Rogers, LLRW Program Manager '
Environmental Protection Section Nebraska Department of Health 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509-5007 r
c
' - - - -
- -. . . . - - ~ - . - . - . - . - _
- - - - . . . _ - -
. .
.
' Omaha Public Power District -3-JUL 2 l 1997
,
bec to DCD (IE01)
bec distrib. by RIV: '
Regional Administrator- DRS-PSB DRP Director MIS System j Branch Chief (DRP/B) RIV File l Project Engineer (DRP/B) Branch Chief (DRP/TSS) i Resident inspector l
!
!
!
i
!
,
DOCUMENT NAME: R:\_FCS\FC711 AK.WCW To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:PE:DRP/B C:DRP/B (_ ,
'
D:DRP g l- DNGraves;df 73 WDJohnq6/i TPGwynn // y
' '
f 7/g(/97 7/21/97 ' 742//97 9 L OFFIClAL RECORD COPY i
i
. _ _ _ . . .. ._ _ _ _ . _ - - _ _ _ . _ . _ _-_
. .
, +
.
Omaha Public Power District -3- 1 JUL 21 1997 k
l NEUMI[$?] I bec distrib, by RIV:
Regional Administrator DRS-PSB !'
DRP Director MIS System Branch Chief (DRP/B) RIV File Project Engineer (DRP/B) Branch Chief (DRP/TSS)
Resident inspectoi l
l l
l !
i l
, ,
DOCUMENT NAME: R:\_FCS\FC711 AK.WCW To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy l
RIV:PE:DRP/B C:DRP/B (j 1 D:DRP f)
,
DNGraves;df 70 WDJohnq6/i TPGwynn //y
' '
I 7/g(/97 7/21/97 ' 742//97 F r OFFIClAL RECORD COPY
!
'
?
.
.
.
Omaha P7blicP7serDistnct ~
444 South 16th StreetMall i i NL ' 8 k Omaha NE68102-2247 % y July 3. 1997 - d7-4 LIC-97-0103 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-137 Washington, DC 20555 References: 1. Docket No. 50-285 2. Letter from NRC (T. P. Gwynn) to OPPD (S. K. Gambhir) dated June 4, 1997 SUBJECT: NRC Inspection Report No. 50-285/97-11. Reply to a Notice of Violation l
The subject report transmitted a Notice of Violation (NOV) resulting from an i NRC special insnection conducted May 19 through May 23. 1997 at the Fort
'
Calhoun Station (FCS). Attached is the Omaha Public Power District (OPPD)
response to this NOV.
If you should have any questions, please contact me.
Sincerely, py S. Division Manager Engineering and Operations Support l SKG/ddd Attachment c: Winston and Strawn E. W. Merschoff. NRC Regional Administrator Region IV L. R. Wharton, NRC Project Manager W. C. Walker. NRC Senior Resident Inspector
-
(?
r ist
'
45.5124 Employment with Equat opportunity
. . . - . - - - - . . .. .. _. - ~. .- . . .
. .
"
. .
'
. .
a Attachment LIC 97-0103 Page 1 REPLY TO A NOTICE OF VIOLATION l
l Omaha Public Power District- Docket: 50 285 Fort Calhoun Station License: DPR 40
During an NRC inspection conducted on May 19 23, 1997, one violation of NRC l requirements was identified. In accordance with the " General Statement of l . Policy and Procedure for NRC Enforcement Actions" NUREG 1600, the violation is
! ' listed below:
! :
A. Technical Specification 5.8.1 requires, in part, that written procedures I be established, implemented, and maintained covering the applicable procedures recommended in Appendix A of- Regulatory Guide 1.33, Revision
'
2, February 1978. Regulatory Guide 1.33, Appendix A recommends, in part, that procedures should be written covering administrative procedures for safe operation.
1. Standing Order 50 0-1, Revision 31, " Conduct of Operations,"
l requires in step 12.1.28 that if while performing a procedure it is discovered that the anticipated response was not received.
l initiate a temporary or permanent change in accordance with Standing Order G 30, " Procedure Change and Generation."
2. Contrary to the above, the licensee did not properly implement the administrative procedure applicable to the activity in that on May 12, 1997, the licensee did not initiate a procedure change as required when the governing Procedure OP-2A, " Plant Startup," did
, not specify actions to be taken if all Group 4 control rods were withdrawn without reaching criticality.
This is a Severity Level IV Violation (285/97011-01) (Supplement I)
OPPD Response
' '
- The above NOV (failure to change an inadequate procedure) was a violation of S0-0-1, but did'not impact nuclear safety.
!
! 1. The Reason for the Violation l
l Withdrawal to criticality is controlled under operations procedure OP-2A, " Plant Startup." This procedure did not address the potential
'
condition of not achieving criticality by all rods out (ARO).
!
l
. .
)
'*L. . i
.
.
l t
. .
I
!
Attachment i LIC 97-0103 l Page 2 j i
Additionally, this condition, subcritical with Group 4 rods at ARO, is )
,
'
' believed not to have occurred previously at Fort Calhoun Station. When '
this condition arose on May.12, 1997, discussions of possible actions _to i l take and the consequences;of those actions were held in the Control Room l-between the Reactor Engineer, the Shift Supervisor, the Licensed Senior
, Operator, and the Assistant Plant Manager before proceeding. This discussion maintained a high emphasis on reactivity management issues and conservative decision making.. Prior to proceeding, the Shift Supervisor received Manager - Operations concurrence via telephone. J
!
The licensed members of this operating crew had recently received I training on reactivity management (04/21/97) and the Reactor Engineer was also present at that training session as a Subject Matter Expert.
Although OP-2A did not contain specific steps to perform the subsequent actions it was believed that existing procedural guidance provided adequate direction and control of the continuing evolution to critical.
Procedure OP-2A. " Plant Startup'" contains a note which allows additional hold points for 1/M plotting at the discretion of the Reactor i Engineer. Procedure 01-RR-1, " Reactor Regulating System Normal Operation." was used to manipulate the control rods. Procedure OI-CH-4.
" Chemical and Volume Control System Makeup Operation.~ provided guidance to' perform the required dilution of the RCS. Additionally, since it was agreed to continue with the withdrawal to criticality, OP-2A Attachment l 2, "CEA Withdrawal to Criticality Mode 2" was the appropriate procedure to follow.
o Upon his arrival, later that morning, the Manager - Operations reviewed the actions taken with the Assistant Plant Manager and the Reactor Engineer and they determined that a procedure change was warranted and requested that a Condition Report be generated to document his concern.
Since procedure OP-2A was not revised prior to continuing with the approach to criticality, the violation of S0-0-1 occurred.
OPPD has the following comment on the NRC observation (01.1.2b) that
"the failure to immediately place the reactor in a safe, stable condition and then to initiate a procedure change prior to continuing..
was a violation..." Standing Order S0-0-1, " Conduct of Operations."
Step 121.2B states, in part. -that if while performing a procedure it is
'
discovered that the anticipated response was not received... the following actions shculd be carried out:
'
(1) Place the system / component in a safe condition.
o (2) Contact the Shift Supervisor and inform him of the situation l
. _
__ _ --
._
. . . .. . - - - - - . - - -- - - . - . . - - . . . - ---
,- .
-
.. . !
... .
l Attachment LIC 97-0103 ;
Page 3
'
i and the status-of the component / system.
(3) Evaluate the situation to determine the cause of the t-
. unexpected response. ,
(4)! Initiate a temporary or permanent procedure change in !
- accordance with G-30 to allow usage of
- the procedure for the-current situation.
The reactor was in a safe condition as it was subcritical with adequate ['
,
shutdown margin. Therefore, immediate operator action was not required.
'
The Shift. Supervisor was being consulted to inform him of the situation and to determine the cause of the situation. This situation was not ;
necessarily unexpected as the Reactor Engineer was aware that the worth ,
of Group 4 from the predicted critical condition was less than the-administrative limit'between measured and predicted critical conditions j (1 0.5% delta rho). Additionally, a dedicated operator was assigned to
- take the reactor critical. A portion of the eighteen minutes noted l before inserting the rods was spent allowing the reactor to stabilize i while it was being monitored for indications of criticality. The remainder was spent evaluating the current situation and determining the i next course of action. Therefore, with the exception of Step. ,
12.1.2.B(4), all actions taken by 0 PPD personnel were correct and
.
,
prudent.
]
-2. Corrective Steps Which Have Been-Taken and the Results Achieved i
< a) OPPD has revised procedure OP-2A to address the. procedural l deficiency. The procedure was issued:on May 28, 1997.
i b)- Plant personnel were informed of this event during Human !
Performance Day, which was held on June 11, 1997. This training ;
'
.
'
reinforced the need for verbatim procedural compliance and the-need to correct procedural deficiencies as they occur.
I c)- The S0-G-92. " Conduct of Infrequently Performed Procedures," 1
' criticality briefing has been revised to address the observed
~
l weakness that the criticality briefing did not address the o possibility of not going critical within the worth of Group 4 from l 85 inches to AR0.
3. Corrective Steps Which Will Be Taken to Avoid Further Violations I Operations personnel will be trained on this event and the revised
.
l
_ . , _ _ ,_ _ . . _ _ . _ , . . __ ,
. .
. .
', .
.
Attachment LIC 97-0103 Page 4-procedure OP-2A, during the next regularly scheduled training (Rotation 97-05). This training will be completed on September 19. 1997. In the event the reactor must be shut down and then started up prior to September 19, 1997, this training will be provided to the crew that will take the reactor critical.
4. Date When Full Compliance Will Be Achieved l OPPD is currently in full compliance. l
l
I l
l
.
t
!