r OMAHA PUBLIC POWER DISTRICT Fort Calhoun Station Unit No. l 4
December 1987 Monthly Operations Report f
1.
OPERATIONS
SUMMARY
Fort Calhoun Station' operated at 10b% power through December 1987, completing another year without a reactor trip.
Construction continued on the training facility, warehouse and maintenance shop. An NRC inspection was performed on Radiological and Environmental Controls.
' w No safety valves or PORV'cnallenges or failures occurred.
A.
PERFORMANCE CHARACTERISTICS
,s None B.
CHANGES IN OPERATING METHODS None C.
RESULTS OF SURVEILLANCE TESTS AND INSPECTIONS None D.
CHANGES, TESTS AND EXPERIMENTS CARRIED OUT WITHOUT COMMISSION A.PPROVAL Procedure
.Q0Eri.pf.iQD SP-FAUD-1 Fut 1 Aisembly Uplift Condition Detection.
This procedura did not constitute an unreviewad safety qu:stion as defined by 10CFR50.59 since it onjy involved the evaluation of data fr9?. a ser-
. veillance test to verify that a fuel assembly uplift candition did not exist.
System Acceptance Committee Packages for December 1987:
Eackaae Description / Analysis EEAR FC 87-034 Load Shed of 480 Volt Breaker IB4A-6.
Tb s modification provided for load shed of the J
security building.
This modification does not have,an adverse effect on the safety analysis.
/
8801180217 880212 PDR ADOCK 05000285
~
.R.
_. _.