Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151B410 + (12:09:46, 11 December 2024)
- 05000413/LER-1988-012, :on 880208,waste Gas Decay Tank Contents Inadvertently Released to Environ Due to Leak Following Maint.Caused by Personnel Error.Leak Identified,Isolated & Repaired.Personnel Counseled + (12:09:51, 11 December 2024)
- ML20151B403 + (12:09:53, 11 December 2024)
- ML20151B395 + (12:09:54, 11 December 2024)
- ML20151B393 + (12:09:54, 11 December 2024)
- ML20151B389 + (12:09:55, 11 December 2024)
- ML20151B388 + (12:09:56, 11 December 2024)
- ML20151B383 + (12:09:57, 11 December 2024)
- ML20151B382 + (12:09:57, 11 December 2024)
- ML20151B380 + (12:09:58, 11 December 2024)
- 05000348/LER-1988-007, :on 880306,both 1A & 1B Battery Were Inoperable for 19 Minutes & Tech Spec 3.0.3 Entered.Caused by Failure of 1B Battery Charger While Swing Charger 1C Aligned to 1A Battery.Failed Parts Replaced + (12:10:00, 11 December 2024)
- ML20151B375 + (12:10:01, 11 December 2024)
- ML20151B374 + (12:10:01, 11 December 2024)
- ML20151B371 + (12:10:02, 11 December 2024)
- ML20151B372 + (12:10:02, 11 December 2024)
- ML20151B368 + (12:10:03, 11 December 2024)
- ML20151B367 + (12:10:04, 11 December 2024)
- ML20151B364 + (12:10:05, 11 December 2024)
- IR 05000327/1988015 + (12:10:47, 11 December 2024)
- ML20151B362 + (12:10:47, 11 December 2024)
- ML20151B360 + (12:10:48, 11 December 2024)
- ML20151B359 + (12:10:49, 11 December 2024)
- ML20151B358 + (12:10:50, 11 December 2024)
- ML20151B352 + (12:10:53, 11 December 2024)
- ML20151B353 + (12:10:53, 11 December 2024)
- ML20151B349 + (12:10:54, 11 December 2024)
- IR 05000413/1988013 + (12:10:56, 11 December 2024)
- ML20151B346 + (12:10:56, 11 December 2024)
- ML20151B345 + (12:10:57, 11 December 2024)
- ML20151B340 + (12:10:58, 11 December 2024)
- ML20151B344 + (12:10:58, 11 December 2024)
- ML20151B336 + (12:11:00, 11 December 2024)
- ML20151B339 + (12:11:00, 11 December 2024)
- ML20151B335 + (12:11:01, 11 December 2024)
- ML20151B334 + (12:11:02, 11 December 2024)
- ML20151B329 + (12:11:03, 11 December 2024)
- ML20151B331 + (12:11:03, 11 December 2024)
- 05000317/LER-1985-003, :on 850405,7 of 16 Main Steam Valves Found to Be Out of Tolerance.Caused by Measurement Technique & Room Equilibrium Temp.Main Steam Safety Valves Reset Prior to Completion of Test + (12:11:05, 11 December 2024)
- IR 05000443/1988008 + (12:11:06, 11 December 2024)
- ML20151B324 + (12:11:07, 11 December 2024)
- ML20151B323 + (12:11:08, 11 December 2024)
- ML20151B321 + (12:11:09, 11 December 2024)
- ML20151B320 + (12:11:09, 11 December 2024)
- ML20151B319 + (12:11:10, 11 December 2024)
- PM-88-173, Monthly Operating Rept for June 1988 for Shoreham Nuclear Power Plant + (12:11:10, 11 December 2024)
- 05000277/LER-1988-005-01, :on 880303,control Panels Failed to Meet Original Seismic Qualifications.Caused by Installation Error & Not Following Design Drawings.Base Channel of Each Panel Welded to Floor Embed on Outside of Panel + (12:11:12, 11 December 2024)
- ML20151B313 + (12:11:13, 11 December 2024)
- ML20151B311 + (12:11:14, 11 December 2024)
- ML20151B310 + (12:11:15, 11 December 2024)
- ML20151B308 + (12:11:15, 11 December 2024)
- ML20151B306 + (12:11:16, 11 December 2024)
- ML20151B303 + (12:11:20, 11 December 2024)